| Literature DB >> 35755977 |
Mohammad Javad Tahmasebi Birgani1,2, Hadis Khorshidsavar1, Ali Bagheri2,3, Amir Danyaei1, Neda Abdalvand2,4.
Abstract
Background: Auditing the treatment planning system (TPS) software for a radiotherapy unit is of paramount importance in any radiation therapy department. A Plexiglas phantom was proposed to measure the ionization of 60Co high dose rate (HDR) source and compare dose points in the planning system for auditing and verifying TPS.Entities:
Keywords: Audit; Plexiglas phantom; brachytherapy; dosimetry; radiotherapy
Year: 2022 PMID: 35755977 PMCID: PMC9215833 DOI: 10.4103/jmss.JMSS_47_19
Source DB: PubMed Journal: J Med Signals Sens ISSN: 2228-7477
Figure 1Anterior view from the surface of phantom and applied needles
Figure 2Phantom structure and needle insertions into a phantom and holes for chamber placement. These views are axial (a) and Coronal view (b and c) of a phantom taken from computed tomography scan planning of the phantom. P is the point defined in hole x and depth y (mm) from the anterior surface of the phantom
Treatment planning system doses and percentage doses and the measured ionization values of six points in phantom
| Dosimeter placement | Dosimetry depth (mm) | Audit measurement (nC) | TPS dose (Gy) | TPS percentage dose (%) |
|---|---|---|---|---|
| Hole A | 5 ( | 65.29 | 3.255 | 108.5 |
| 7 ( | 55.98 | 2.919 | 97.3 | |
| Hole B | 5 ( | 62.26 | 3.054 | 101.8 |
| 7 ( | 51.35 | 2.61 | 87.0 | |
| Hole C | 5 ( | 55.91 | 2.847 | 94.9 |
| 7 ( | 43.5 | 2.031 | 76.7 |
TPS – Treatment planning system
Ratios between paired measurements point based on treatment planning system and M parameters and relevant relative difference error
| Parameter | Ratio of points | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| M | 1.17 | 1.05 | 1.27 | 1.17 | 1.5 | 0.9 | 1.09 | 1 | 1.29 | 1.21 | 1.11 | 1.43 | 0.92 | 1.18 | 1.29 |
| TPS | 1.12 | 1.07 | 1.25 | 1.14 | 1.41 | 0.96 | 1.12 | 1.03 | 1.27 | 1.17 | 1.07 | 1.33 | 0.92 | 1.13 | 1.24 |
| RDE (%) | 4.27 | −1.9 | 1.6 | 2.6 | 6 | −6.6 | −2.75 | −3 | 1.55 | 3.3 | 3.6 | 6.99 | 0 | 4.23 | 3.9 |
TPS – Treatment planning system; RDE – Relative difference error