| Literature DB >> 35743715 |
Juan Pablo Rodríguez-Arias1, Blanca Tapia2, Marta María Pampín1, Maria José Morán1, Javier Gonzalez1, Maria Barajas1, Jose Luis Del Castillo1, Carlos Navarro Cuéllar3, Jose Luis Cebrian1.
Abstract
(1) Background: A decrease in operative time can not only improve patient outcomes through a reduction in the risk of developing complications but can also result in cost savings. The aim of this study is to determine whether there an intraoperative time gain can be achieved by using the preoperative virtual planning of mandibular reconstruction using a free fibula flap compared with freehand plate bending and osteotomies. (2)Entities:
Keywords: CAD/CAM; cost analysis; fibula free flap; head and neck tumor; oral cancer; virtual surgical planning
Year: 2022 PMID: 35743715 PMCID: PMC9224908 DOI: 10.3390/jpm12060930
Source DB: PubMed Journal: J Pers Med ISSN: 2075-4426
Demographic data.
| Conventional (19) | CAD/CAM (18) | ||
|---|---|---|---|
| Gender | Male | 13 | 6 |
| Female | 6 | 12 | |
| Mean age | 55 | 47 | |
| ASA | I | 4 | 7 |
| II | 10 | 6 | |
| III | 5 | 5 | |
| Diagnosis | Squamous cell carcinoma | 16 | 7 |
| Ameloblastoma | 0 | 4 | |
| Osteonecrosis | 0 | 2 | |
| Sarcoma | 2 | 2 | |
| Others | 1 | 3 | |
| Fibular segments | 1 | 7 | 3 |
| 2 | 9 | 10 | |
| 3 or 3+ | 3 | 6 |
Figure 1Diagnoses. SCC (squamous cell carcinoma).
Continuous data comparison.
| Conventional (19) | CAD/CAM | ||
|---|---|---|---|
| Days to surgery | 22.5 | 34.6 | 0.039 * |
| Operating time (min) | 623 | 521 | 0.018 * |
| Average hospitalization (days) | 24.3 | 21.8 | 0.06 |
| Average PACU (hours) | 65.5 | 43 | 0.02 * |
* These differences in time were statistically significant after uni- and multivariate analyses.
Analyses of complications.
| Conventional (19) | CAD/CAM | ||
|---|---|---|---|
| Reinterventions | 2 | 4 | - * |
| Infections | 4 | 6 | - * |
| Pulmonary Embolism (PE) | 1 | 0 | - * |
* We were unable to obtain a p-value due to the low number of cases in both groups.
Figure 2Cost savings. Cost comparison of pre-curved plates and virtual planning, taking into account the cost savings from the OR time gain.