| Literature DB >> 31891029 |
Christopher Roche1, Caitlin DiGeorgio1, Jose Yegres1, Jennifer VanDeven1, Nick Stroud1, Pierre-Henri Flurin2, Thomas Wright3, Emilie Cheung4, Joseph D Zuckerman5.
Abstract
BACKGROUND: Little guidance exists regarding the minimum screw length and screw quantity necessary to achieve fixation in reverse total shoulder arthroplasty (rTSA); to that end, this study quantified the displacement of 2 different sizes of glenoid baseplates using multiple different screw lengths and quantities of screws in a low-density polyurethane bone-substitute model.Entities:
Keywords: ASTM 2028 testing; cyclic bench testing; effect of screw length on rTSA baseplate fixation; effect of screw number on rTSA baseplate fixation; glenoid baseplate fixation; rTSA; reverse shoulder arthroplasty
Year: 2019 PMID: 31891029 PMCID: PMC6928260 DOI: 10.1016/j.jses.2019.08.006
Source DB: PubMed Journal: JSES Open Access ISSN: 2468-6026
Figure 1Standard glenoid baseplate (34 × 25 mm, left) and small glenoid baseplate (30 × 24 mm, right) used for this reverse total shoulder arthroplasty glenoid fixation test. Each glenoid baseplate is oriented from superior (top) to inferior (bottom).
Figure 2Standard-size glenoid baseplate screw locations used for each of the 2-, 4-, and 6-screw configurations tested for this reverse total shoulder arthroplasty glenoid fixation test.
Figure 3In the displacement test, shear and compressive loads were applied directly to the baseplate before and after cyclic loading.
Figure 4Displacement test. It should be noted that the translational stage is providing a 100-N compressive force and the actuator of the load frame is providing a 357-N shear force.
Figure 5Cyclic test, in which a 750-N load is applied through the humeral liner as the glenoid component is cycled about an arc of 55° at 0.5 Hz for 10,000 cycles.
Impact of screw quantity on rTSA glenoid baseplate displacement before and after cyclic loading of standard glenoid baseplate in 24-g/cm3 bone-substitute substrate
| SI | AP | |||||
|---|---|---|---|---|---|---|
| Shear Pre | Shear Post | Post-Pre displacement | Shear Pre | Shear Post | Post-Pre displacement | |
| Average standard-baseplate shear displacement, μm | ||||||
| 2 screws | 116 ± 36 | 125 ± 44 | 10 ± 26 | 227 ± 80 | 275 ± 94 | 48 ± 75 |
| 4 screws | 82 ± 22 | 91 ± 23 | 9 ± 13 | 114 ± 33 | 129 ± 35 | 15 ± 12 |
| 6 screws | 92 ± 20 | 108 ± 42 | 16 ± 25 | 146 ± 59 | 160 ± 73 | 14 ± 28 |
| ANOVA | .0042 | .0489 | .6667 | <.0001 | <.0001 | .0928 |
| 2 screws vs. 4 screws | .0036 | .0414 | — | <.0001 | <.0001 | — |
| 2 screws vs. 6 screws | .0545 | .2751 | — | .0017 | .0002 | — |
| 4 screws vs. 6 screws | .1841 | .1817 | — | .3269 | .4840 | — |
rTSA, reverse total shoulder arthroplasty; SI, superior-inferior; AP, anterior-posterior; Pre, before cyclic loading; Post, after cyclic loading; ANOVA, analysis of variance.
Statistically significant (P < .05).
Impact of screw quantity on rTSA glenoid baseplate displacement before and after cyclic loading of small glenoid baseplate in 24-g/cm3 bone-substitute substrate
| SI | AP | |||||
|---|---|---|---|---|---|---|
| Shear Pre | Shear Post | Post-Pre displacement | Shear Pre | Shear Post | Post-Pre displacement | |
| Average small-baseplate shear displacement, μm | ||||||
| 2 screws | 93 ± 21 | 118 ± 33 | 25 ± 17 | 197 ± 87 | 244 ± 93 | 47 ± 34 |
| 4 screws | 97 ± 12 | 104 ± 22 | 7 ± 12 | 160 ± 57 | 162 ± 57 | 2 ± 13 |
| .5379 | .1871 | .0025 | .1788 | .0070 | <.0001 | |
rTSA, reverse total shoulder arthroplasty; SI, superior-inferior; AP, anterior-posterior; Pre, before cyclic loading; Post, after cyclic loading.
Statistically significant (P < .05).
Impact of screw length on rTSA glenoid baseplate displacement before and after cyclic loading of standard glenoid baseplate in 24-g/cm3 bone-substitute substrate
| SI | AP | |||||
|---|---|---|---|---|---|---|
| Shear Pre | Shear Post | Post-Pre displacement | Shear Pre | Shear Post | Post-Pre displacement | |
| Average standard-baseplate shear displacement, μm | ||||||
| 18-mm screws | 115 ± 39 | 140 ± 45 | 25 ± 29 | 213 ± 102 | 240 ± 105 | 26 ± 30 |
| 30-mm screws | 101 ± 12 | 111 ± 16 | 11 ± 14 | 152 ± 35 | 164 ± 47 | 12 ± 13 |
| 46-mm screws | 74 ± 15 | 73 ± 8 | −1 ± 10 | 122 ± 44 | 160 ± 104 | 39 ± 77 |
| ANOVA | .0001 | <.0001 | .0032 | .0019 | .0315 | .3422 |
| 18 mm vs. 30 mm | .2536 | .0198 | .1193 | .0412 | .0166 | — |
| 18 mm vs. 46 mm | .0001 | <.0001 | .0022 | .0016 | .0497 | — |
| 30 mm vs. 46 mm | .0120 | .0015 | .2530 | .4445 | .9921 | — |
rTSA, reverse total shoulder arthroplasty; SI, superior-inferior; AP, anterior-posterior; Pre, before cyclic loading; Post, after cyclic loading; ANOVA, analysis of variance.
Statistically significant (P < .05).
Impact of screw length on rTSA glenoid baseplate displacement before and after cyclic loading of small glenoid baseplate in 24-g/cm3 bone-substitute substrate
| SI | AP | |||||
|---|---|---|---|---|---|---|
| Shear Pre | Shear Post | Post-Pre displacement | Shear Pre | Shear Post | Post-Pre displacement | |
| Average small-baseplate shear displacement, μm | ||||||
| 18-mm screws | 115 ± 8 | 141 ± 28 | 26 ± 22 | 270 ± 51 | 291 ± 74 | 20 ± 31 |
| 30-mm screws | 89 ± 6 | 102 ± 12 | 13 ± 11 | 136 ± 27 | 174 ± 70 | 38 ± 47 |
| 46-mm screws | 81 ± 10 | 89 ± 9 | 8 ± 12 | 128 ± 23 | 143 ± 22 | 16 ± 17 |
| ANOVA | <.0001 | <.0001 | .0497 | <.0001 | <.0001 | .3252 |
| 18 mm vs. 30 mm | <.0001 | .0002 | .1970 | <.0001 | .0005 | — |
| 18 mm vs. 46 mm | <.0001 | <.0001 | .0465 | <.0001 | <.0001 | — |
| 30 mm vs. 46 mm | .0983 | .2810 | .7431 | .8466 | .4946 | — |
rTSA, reverse total shoulder arthroplasty; SI, superior-inferior; AP, anterior-posterior; Pre, before cyclic loading; Post, after cyclic loading; ANOVA, analysis of variance.
Statistically significant (P < .05).
Comparison of SI and AP baseplate displacement after cyclic loading between the standard and small glenoid baseplates in a 24-g/cm3 bone substitute substrate
| Baseplate shear displacement, μm | ||||||
|---|---|---|---|---|---|---|
| SI | AP | |||||
| Standard baseplate | Small baseplate | Standard baseplate | Small baseplate | |||
| 2 screws | 125 ± 44 | 118 ± 33 | .5889 | 275 ± 94 | 244 ± 93 | .3648 |
| 4 screws | 91 ± 23 | 104 ± 22 | .1359 | 129 ± 35 | 162 ± 57 | .0728 |
| 18-mm screws | 140 ± 45 | 141 ± 28 | .9793 | 240 ± 105 | 291 ± 74 | .1964 |
| 30-mm screws | 111 ± 16 | 102 ± 12 | .1345 | 164 ± 47 | 174 ± 70 | .6745 |
| 46-mm screws | 73 ± 8 | 89 ± 9 | <.0001 | 160 ± 104 | 143 ± 22 | .6173 |
SI, superior-inferior; AP, anterior-posterior.
Statistically significant (P < .05).