| Literature DB >> 31602077 |
Rudrashish Haldar1, Devendra Gupta1, Hemchandra Pandey2, Shashi Srivastava1, Prabhakar Mishra3, Anil Agarwal1.
Abstract
BACKGROUND AND AIMS: Delay in patients' transportation to the operating theater (OT) is a globally recognized phenomenon, leading to delay in the subsequent processes (anesthesia induction, surgery, and patient turnover). This observational study was conducted to evaluate the common reasons for delay in transporting patients to the neurosurgery OT complex and its consequent effects and how the elimination of these reasons by application of feasible measures can influence the after effects. SETTINGS ANDEntities:
Keywords: Elevators; hospital administration; operation theaters; transportation
Year: 2019 PMID: 31602077 PMCID: PMC6775839 DOI: 10.4103/aer.AER_75_19
Source DB: PubMed Journal: Anesth Essays Res ISSN: 2229-7685
Demographic distributions in both the phases
| Parameters | Groups | ||
|---|---|---|---|
| Evaluation phase ( | Implementation phase ( | ||
| Age (years) | 35.90±17.77 | 34.85±18.49 | 0.371 |
| Gender (male vs. female) | 183 versus 120 | 154 versus 114 | 0.266 |
| Originating stations | |||
| Ward | 281 | 248 | 0.783 |
| ICU | 5 | 7 | 0.783 |
| Pediatric ward | 17 | 13 | 0.783 |
Data are presented as mean±SD or number. Independent t-test was used to compare the means between the groups and Chi-square test for the proportions. ICU=Intensive care unit
Shifting times, verification times, time interval between completion of verification and anesthetic induction of the patients, and incidences of delay in arrival
| Parameters | Groups | ||
|---|---|---|---|
| Evaluation phase ( | Implementation phase ( | ||
| ST (min) | 28.059±9.820 | 31.436±8.296* | <0.001 |
| Tv (min) | 4.26±1.73 | 4.14±1.53 | 0.383 |
| Ta (min) | 6.43±5.26 | 6.72±7.37 | 0.586 |
| Incidences of delay in arrival (%) | 34 (11.22) | 13 (4.85)* | 0.006 |
Data are presented as mean±SD or number. Independent t-test was used to compare the means between the groups and Chi-square test for the proportions. *Significant difference (P<0.05). SD=Standard deviation, ST=Shifting times, Tv=Verification times, Ta=Time interval between patient verification and anaesthesia induction
Graph 1Main reasons for delay in the evaluation phase compared with the same in the implementation phase. (1) Absence of porter during changeover time, (2) transportation lift not free, (3) patient from pediatric ward, (4) miscommunication regarding patients, (5) miscellaneous
Number of instances where the second case was involved and time interval when the operation theater remained unoccupied (Tc)
| Parameters | Groups | ||
|---|---|---|---|
| Evaluation phase ( | Implementation phase ( | ||
| Number of instances where second case was involved (%) | 97 (32.0) | 80 (29.9) | 0.589 |
| Tc (min) | 16.31±9.29 | 11.70±5.78 | <0.001* |
Data are presented as number or mean±SD. Independent t-test was used to compare the means between the groups and Chi-square test for the proportions. *Significant difference (P<0.05). SD=Standard deviation, Tc=Turnover time
Graph 2Comparison of effects of delays in the evaluation phase versus implementation phase. *P=.001