| Literature DB >> 29978546 |
Danielle Lack1, Jian Liang2, Lisa Benedetti2, Cory Knill3, Di Yan2.
Abstract
PURPOSE: Data errors caught late in treatment planning require time to correct, resulting in delays up to 1 week. In this work, we identify causes of data errors in treatment planning and develop a software tool that detects them early in the planning workflow.Entities:
Keywords: automation; plan data communication; quality control; treatment planning
Mesh:
Year: 2018 PMID: 29978546 PMCID: PMC6123146 DOI: 10.1002/acm2.12388
Source DB: PubMed Journal: J Appl Clin Med Phys ISSN: 1526-9914 Impact factor: 2.102
Summary of data errors and root causes identified through root cause analysis procedure. Details on files scanned and information needed to check for a given error is summarized in the rightmost column
| Error type | Root errors detected | Cause(s) | Significance | How software detects data error |
|---|---|---|---|---|
| Data transfer errors | Image slice missing from dataset | DICOM transfer and image reconstruction error between TPS and PACS/CT software | Incomplete generation of target/normal tissue contours | Check |
| Wrong patient identification entered | Manual entry of patient information incorrect | Prevents transfer of CT/plan data between TPS, R&V, and OBI software | Check patient identification inside Pinnacle's database table | |
| Wrong image DICOM tag generated | Bug in CT software creates wrong DICOM tag | Prevents transfer of CT data between R&V and OBI software | Check | |
| TPS user errors | Incorrect CT selected as planning CT | Diagnostic reference CT manually selected as planning CT | Incorrect patient setup and CT‐density table applied | Check |
| Incorrect CT‐density curve applied | TPS software/dosimetrist selects wrong curve | Dosimetric discrepancies of 1%–3% in target coverage | From DICOM image file, obtain | |
| Incorrect patient image in secondary image list | User imports image to wrong patient | Incorrect reference patient dataset used for planning | Compare the | |
| Other | Other errors (mostly R&V performance errors) | R&V service not working and needs reset | DICOM data conversion from TPS to R&V system stopped, R&V image review slow | Monitor the incomplete events from Mosaiq database table |
TPS, treatment planning system; R&V, record and verify system; OBI, on‐board imaging system. Keywords to be searched in TPS internal file and database are highlighted as bold font type.
Figure 1Sample data error report generated by software tracking tool. In this example, the MRN for the patient on the helical CT is mismatched with the Mosaiq database. This is because the CT technician typed in a wrong MRN.
Figure 2Example of the dosimetric impact of applying an incorrect CT‐density curve for dose calculation. PTV (blue) and GTV (red) DVH curves are shown for a lung SBRT patient. Discrepancies in D95 target coverage with the correct 120 kVp curve applied (solid lines) and incorrect curve applied (dashed lines) is ~3%.
Data error tool tracking results for 2016 and 2017 broken down by root error type. Performance errors by the record and verify system were not classified as a true “data” error
| Root errors detected | 2016 Frequency | 2017 Frequency |
|---|---|---|
| Image slice missing from dataset | 16 | 3 |
| Wrong patient identification entered | 35 | 36 |
| Wrong image DICOM tag generated | 7 | 0 |
| Incorrect CT selected as planning CT | 3 | 1 |
| Incorrect CT‐density curve applied | 17 | 2 |
| Incorrect patient image in secondary image list | 1 | 0 |
| Other errors (mostly R&V performance errors) | 5 | 2 |
| Total data errors detected | 79 | 42 |
| Total errors detected | 84 | 44 |
Maximum time estimates to correct a given data error with and without the software tool implemented. One day was considered to be equivalent to an 8‐h work day
| Root Error | Time to fix with software tool implemented | Maximum time to fix without software tool implemented |
|---|---|---|
| Image slice missing from dataset | 30 min | 1 day |
| Wrong patient identification entered | 10 min | 1 day |
| Wrong image DICOM tag generated | 10 min | 1 week |
| Incorrect CT selected as planning CT | 10 min | 2 days |
| Incorrect CT‐density curve applied | 5 min | 4 h |
| Incorrect patient image in secondary image list | 10 min | 1 day |
Time‐cost estimate in hours to correct data errors detected with and without the software tool implemented in 2016 and with the tool implemented in 2017
| Root errors detected | Time cost to correct error without software 2016 | Time cost to correct error with software 2016 | Time cost to correct error with software 2017 |
|---|---|---|---|
| Image slice missing from dataset | 128.0 | 8.0 | 1.5 |
| Wrong patient identification entered | 280.0 | 6.0 | 6.0 |
| Wrong image DICOM tag generated | 280.0 | 1.2 | 0.0 |
| Incorrect CT selected as planning CT | 48.0 | 0.5 | 0.2 |
| Incorrect CT‐density curve applied | 68.0 | 1.4 | 0.2 |
| Incorrect patient image in secondary image list | 8.0 | 0.2 | 0.0 |
| Total | 812.0 | 17.3 | 7.9 |