| Literature DB >> 20717087 |
Abstract
In an attempt to minimize errors and improve patient outcome in radiation therapy, a linear accelerator data management system was developed to provide radiation oncology physicists with a set of computerized tools to manage linear accelerator physics data. The entire program is written in Microsoft Visual Basic and has a user-friendly, front-end window with the following features and modules: (1) Generate, edit and approve commissioning and QA reports and other regulatory documents, (2) Configure commissioning tasks, (3) Acquire output factors, (4) Import scanned data, (5) Import PDD, TMRs and OAR tables directly from the scanning software, (6) Query physics data such as TMR, PDDs, OFs, and WFs, (7) Compare physics data to a different machine or a standard, (8) Compare physics data from the same machine (e.g. during annual calibrations), (9) Perform MU calculations on plans exported from the planning system via DICOM RT, (10) Perform TG-51 calibration, (11) Perform monthly calibration, (12) FTP physics data for purposes of remote peer review and/or inspections.Entities:
Mesh:
Year: 2010 PMID: 20717087 PMCID: PMC5720439 DOI: 10.1120/jacmp.v11i3.3212
Source DB: PubMed Journal: J Appl Clin Med Phys ISSN: 1526-9914 Impact factor: 2.102
Figure 1The main user interface through which all of the system's features are accessed.
Figure 2Processes in the lifetime of a linac currently supported by CDMS.
Figure 3Example of CDMS users together with their most accessible features.
Figure 4Output factors measurements menu.
Figure 5Administrative and technical details menu.
Figure 6The query beam data module.
Figure 7DICOM RT enabled MU calculator.
Figure 8Effect of beam hardening on wedge transmission factor. The examples of 6 MV, 10 MV and 23 MV are shown when transmission factors are measured at 5 cm depth.
Figure 9Documents manager module.
Open fields central axis CDMS MU calculator validation.
|
|
|
|
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|---|---|---|---|
|
| 5 cm | 0.898 | 0.948 | 1.03 | 207.00 | 205.25 | 0.85 | 180.00 | 179.44 |
| |
|
| 5 cm | 0.914 | 0.981 | 1.03 | 195.00 | 194.72 | 0.14 | 180.00 | 181.90 | 1.04 | |
|
| 5 cm | 0.920 | 1.000 | 1.03 | 190.00 | 189.92 | 0.04 | 180.00 | 180.81 | 0.43 | |
| 6 |
| 5 cm | 0.930 | 1.033 | 1.03 | 183.00 | 182.68 | 0.17 | 180.00 | 180.32 | 0.13 |
|
| 5 cm | 0.936 | 1.047 | 1.03 | 179.00 | 178.37 | 0.35 | 180.00 | 178.90 |
| |
|
| 5 cm | 0.940 | 1.05 | 1.03 | 175.00 | 175.72 | 0.41 | 180.00 | 176.75 |
| |
|
| 5 cm | 0.943 | 1.073 | 1.03 | 173.00 | 172.65 | 0.20 | 180.00 | 177.21 |
| |
|
| 5 cm | 0.998 | 0.926 | 1.067 | 182.00 | 182.46 | 0.25 | 180.00 | 179.88 |
| |
|
| 5 cm | 0.996 | 0.979 | 1.067 | 173.00 | 173.00 | 0.00 | 180.00 | 179.23 |
| |
|
| 5 cm | 0.993 | 1.000 | 1.067 | 170.00 | 169.87 | 0.08 | 180.00 | 179.60 |
| |
| 23 |
| 5 cm | 0.986 | 1.040 | 1.067 | 165.00 | 164.37 | 0.38 | 180.00 | 179.35 |
|
|
| 5 cm | 0.983 | 1.063 | 1.067 | 161.00 | 161.49 | 0.30 | 180.00 | 177.45 |
| |
|
| 5 cm | 0.982 | 1.077 | 1.067 | 159.00 | 159.40 | 0.25 | 180.00 | 176.86 |
| |
|
| 5 cm | 0.981 | 1.092 | 1.067 | 158.00 | 157.47 | 0.34 | 180.00 | 178.79 |
|
Wedged fields central axis CDMS MU calculator validation.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| 0.898 | 0.704 | 0.948 | 1.03 | 293.00 | 291.55 | 0.49 | 180.00 | 179.96 |
| ||
| 6 |
| 0.920 | 0.704 | 1.000 | 1.03 | 266.00 | 269.77 | 1.42 | 180.00 | 177.58 |
| |
|
| 0.930 | 0.711 | 1.028 | 1.03 | 254.00 | 256.94 | 1.16 | 180.00 | 176.63 |
| ||
|
| 0.936 | 0.726 | 1.047 | 1.03 | 246.00 | 245.69 | 0.13 | 180.00 | 176.00 |
| ||
| 15 | ||||||||||||
|
| 0.998 | 0.771 | 0.926 | 1.067 | 240.00 | 236.81 | 1.33 | 180.00 | 181.71 | 0.95 | ||
| 23 |
| 0.993 | 0.772 | 1.000 | 1.067 | 219.00 | 220.04 | 0.47 | 180.00 | 177.78 |
| |
|
| 0.986 | 0.777 | 1.040 | 1.067 | 211.00 | 211.55 | 0.26 | 180.00 | 177.58 |
| ||
|
| 0.983 | 0.790 | 1.063 | 1.067 | 205.00 | 204.42 | 0.28 | 180.00 | 176.93 |
| ||
|
| 0.898 | 0.543 | 0.948 | 1.03 | 380.00 | 377.77 | 0.59 | 180.00 | 179.81 |
| ||
| 6 |
| 0.920 | 0.545 | 1.000 | 1.03 | 345.00 | 348.47 | 1.01 | 180.00 | 176.66 | 1.86 | |
|
| 0.930 | 0.555 | 1.028 | 1.03 | 329.16 | 330.00 | 0.66 | 180.00 | 175.77 |
| ||
|
| 0.936 | 0.574 | 1.047 | 1.03 | 313.00 | 310.75 | 0.72 | 180.00 | 174.67 |
| ||
| 30 | ||||||||||||
|
| 0.998 | 0.628 | 0.926 | 1.067 | 296.00 | 290.62 | 1.82 | 180.00 | 182.42 | 1.34 | ||
| 23 |
| 0.993 | 0.632 | 1.000 | 1.067 | 269.00 | 268.79 | 0.08 | 180.00 | 178.68 |
| |
|
| 0.986 | 0.643 | 1.040 | 1.067 | 257.00 | 255.63 | 0.53 | 180.00 | 178.16 |
| ||
|
| 0.983 | 0.651 | 1.063 | 1.067 | 248.00 | 248.07 | 0.03 | 180.00 | 177.47 |
| ||
|
| 0.898 | 0.484 | 0.948 | 1.03 | 422.00 | 424.22 | 0.53 | 180.00 | 178.81 |
| ||
| 6 |
| 0.920 | 0.486 | 1.000 | 1.03 | 391.00 | 393.20 | 0.50 | 180.00 | 176.71 |
| |
|
| 0.930 | 0.489 | 1.028 | 1.03 | 372.00 | 373.58 | 0.15 | 180.00 | 175.37 |
| ||
|
| 0.936 | 0.501 | 1.047 | 1.03 | 358.00 | 356.03 | 0.27 | 180.00 | 174.81 |
| ||
| 45 | ||||||||||||
|
| 0.998 | 0.511 | 0.926 | 1.067 | 362.00 | 357.07 | 1.36 | 180.00 | 182.83 | 1.57 | ||
| 23 |
| 0.993 | 0.516 | 1.000 | 1.067 | 329.00 | 329.21 | 0.06 | 180.00 | 179.22 |
| |
|
| 0.986 | 0.524 | 1.040 | 1.067 | 313.00 | 313.69 | 0.22 | 180.00 | 177.66 |
| ||
|
| 0.983 | 0.536 | 1.063 | 1.067 | 302.00 | 301.29 | 0.24 | 180.00 | 176.82 |
| ||
|
| 0.898 | 0.399 | 0.948 | 1.03 | 522.00 | 514.20 | 1.49 | 180.00 | 179.84 |
| ||
| 6 |
| 0.920 | 0.400 | 1.000 | 1.03 | 474.00 | 474.79 | 0.17 | 180.00 | 176.02 |
| |
| 60 |
| 0.930 | 0.406 | 1.028 | 1.03 | 449.00 | 449.96 | 0.21 | 180.00 | 174.96 |
| |
| 60 | ||||||||||||
|
| 0.998 | 0.421 | 0.926 | 1.067 | 440.00 | 433.75 | 1.42 | 180.00 | 182.09 | 1.16 | ||
| 23 |
| 0.993 | 0.429 | 1.000 | 1.067 | 398.00 | 395.97 | 0.51 | 180.00 | 178.31 |
| |
|
| 0.986 | 0.438 | 1.040 | 1.067 | 377.00 | 375.28 | 0.46 | 180.00 | 176.94 |
| ||
Effect of CDMS clinical implementation on our practice's commissioning process.
|
|
|
|
|
| |
|---|---|---|---|---|---|
| Improvement Factor | 0.33 | 0.0 | 0.14 | 6.0 | 2.0 |
Figure 10Effect of CDMS clinical implementation on our practice's commissioning process.
CDMS TG‐106 compatibility chart: general data management.
|
|
|
|---|---|
| Define the scope of data collection | Yes |
| Write concise report with all collected data | Yes |
| Check on the report and collected data | Yes |
| Backup entire electronic data, analyzed data and spreadsheets | Yes |
CDMS TG106 compatibility chart: commissioning report content.
|
|
|
|---|---|
| Formal Commissioning Report, which clearly outlines the scope of the project, what was measured, how, what equipment was used, and the results. | Yes |
| Open field X‐ray PDD and TMR tables | Yes |
| Wedged Field X‐ray and TMR tables | PDDs only |
| X‐ray output factors (Scp, Sc, Sp) | Yes |
| Field size and depth dependent wedge factor tables | Field size only |
| Soft wedge (electronic wedge) factor tables | Yes |
| Transmission factor tables | Yes |
| Open field off axis tables at selected depths, large field sizes | Yes |
| Wedge off axis tables at selected depths, largest field size for wedge | Yes, largest square field. |
| Soft wedge off axis tables at selected depth, largest field size for wedge | No. |
| Electron cone ratios and effective source distances | Yes |
| Electron PDD tables | Yes |
| Provide at least selected isodose curves for reference fields both for electron and photon beams from PDD and profiles | Not Applicable |
| Printout all scan data | Not Applicable |
| Compare data from similar machines within your own department or from different institutions; comparison to vendor supplied golden data is also acceptable | Numerical & Graphical |
| Backup entire electronic data and analyzed data | Yes |
| Write report | Yes |