Literature DB >> 19484360

Cost analysis of a system of ad hoc theatre sessions for the management of delayed trauma cases.

Oreste Basso1.   

Abstract

BACKGROUND: Reducing hospital stay optimizes bed capacity. Shortage of operating time can cause some patients to have their treatment and discharge home delayed. Extra operating sessions could help in reducing such a delay. We performed a feasibility study for a simulated model of trauma lists, implemented ad- hoc to reduce time to surgery.
MATERIALS AND METHODS: Two hundred thirty-five consecutive trauma admissions were audited. The time required to deliver surgical treatment was recorded. Patients waiting for their operation more than 48 h from admission were allocated into a simulated system of ad hoc trauma lists, using a realistic decision-making process. The potential to reduce time-to-operation was assessed and the number of saved bed occupancy days was calculated. A cost analysis was also performed.
RESULTS: Surgical treatment was delivered within 48 h in 193 (85%) patients, while 32 (15%) patients waited a mean of 3.8 days (3-7), because of insufficient time. To operate on these patients earlier, additional lists would have cost pound38, 703, reducing the time to surgery to 1 day (0-2). This would have saved 86 days of bed occupancy, representing a savings of pound17,200. Restricting the use of extra lists to the elderly patients in the cohort would have required only 11 extra lists and reduced waiting from 3 (3-4) to 1 days (0-2), for a cost of pound22,407. Elderly patients' lists would have had space left to treat additional seven younger patients, with a total saving of 51 bed occupancy days, corresponding to pound10,200.
CONCLUSIONS: The system of ad hoc trauma lists is easy to organize and it appears to impact significantly on patients' discharge and bed capacity. Direct costs to the health service are contained, as they are partially compensated by the improvement in beds availability.

Entities:  

Year:  2009        PMID: 19484360      PMCID: PMC2688589          DOI: 10.1007/s10195-008-0042-2

Source DB:  PubMed          Journal:  J Orthop Traumatol        ISSN: 1590-9921


Introduction

Achieving an optimal balance between clinical excellence and budget containment is a primary target of modern healthcare services. Reducing patients’ in-hospital length of stay contributes to optimize bed capacity with potential financial returns. Sometimes the number of patients with traumatic conditions awaiting operation exceeds the capacity of operating theatres, resulting in a delay in the discharge home. Extra operating sessions could help to contain such a problem. To our knowledge, the financial implications of this option have not been assessed before. This is an audit of the surgical activity of a typical district hospital of the British National Health Service, assessing the potential costs and benefits of a system of “ad hoc” theater sessions, implemented to reduce time to surgery for patients admitted with trauma. We focused on direct costs to the health service, improvements in bed capacity and the impact on patients.

Materials and methods

All consecutive emergency orthopaedic admission, presenting to Luton and Dunstable District Hospital in a 13-week period were audited prospectively. The epidemiology of fractures (Table 1) and the time required to deliver surgical treatment were recorded by the author. Demographic data, date of admission, planned operation and the date of operation were entered into the trauma database by the trauma coordinator, an experienced nurse whose exclusive task is to follow-up all trauma patients and optimize the pathway from admission to discharge. Following anaesthetic clearance, patients were operated on as soon as possible.
Table 1

Epidemiology of all fractures (ten excluded cases not represented)

FracturesNOperationOperating time allowance (min)
Subcapital femoral fracture25Hemiarthroplasty60
Subcapital femoral fracture9Cannulated screws60
Intertrochanteric fracture17Sliding screw60
Femur5IM nailing90
Femur (12 years old)1MUA + cast30
Supracondylar femur1Nailing90
Supracondylar femur1Internal fixation90
Periprosthetic (hip arthroplasty)1Revision stem90
Tibia plateau6Internal fixation90
Tibia plateau1Circular frame90
Tibial diaphysis2MUA + cast30
Tibial diaphysis3Unreamed nailing90
Tibial diaphysis1External fixation60
Tibial diaphysis1Plating60
Distal tibia2Internal fixation90
Bimalleolar fracture17Internal fixation60
Distal radius30MUA + wiring60
Distal radius4Plating60
Shoulder dislocations3MUA30
Proximal humerus2Internal fixation90
Humeral diaphysis1Internal fixation90
Hand fractures/dislocation16MUA + K wiring60
Scaphoid fracture1Internal fixation60
Tendons injury6Repair60
Infected fixation device8Removal60
Other infections/hematoma18Drainage30
Wrist tendons laceration3Repair45
Rotator cuff rupture1Open repair60
Acute derangement of knee5Arthroscopy60
Dislocated hip prostheses5MUA30
Radius-ulna diaphyses7MUA30
Radius-ulna diaphyses4Internal fixation60
Elbow dislocations2MUA30
Radial head5Internal fixation60
Supracondylar humeral fracture2MUA + wiring60
Patella3Internal Fixation60
Arm laceration3Repair60
Foreign body3Removal60
Total225

Operating times refer to ‘skin to skin’ (start to end of anaesthetics, in case of manipulation)

IM intra medullary, MUA manipulation under anaesthesia, K-wiring Kirschner wiring

Epidemiology of all fractures (ten excluded cases not represented) Operating times refer to ‘skin to skin’ (start to end of anaesthetics, in case of manipulation) IM intra medullary, MUA manipulation under anaesthesia, K-wiring Kirschner wiring

Planning of surgical activity

At our hospital, a Monday to Saturday session is available for a consultant-staffed trauma list. In the British National Health Service, a session is equivalent to 4 1/2 h actual work. During the week, the first patient on the trauma list is scheduled to arrive at the theater no later than 13.30 h and the last patient to leave for the recovery area no later than 18. On Saturdays, start and end times are 9 and 13.30. Trauma operating lists are updated daily during the trauma meetings, occurring every morning at 8.00, Monday to Saturday, when the consultant on call for the previous 24 h reviews the cases admitted during his on take period. At the end of the meeting, the details of the new admissions, selected for surgery, are added to the trauma waiting list in chronological order of arrival. Patients are allocated a place on the first available trauma list, according to their order of admission. Specific issues, such as preoperative conditions, young or elderly age, severity of the injury are generally given priority. The number of cases to place on each operating list depends on the type and estimated duration of the planned operations. The total operating time for each trauma list is calculated by summing up the estimated operating times of each procedure (Table 1). A period of 30 min is added to allow for patient’s changeover, which includes the time required to resuscitate and transfer to recovery area and then check in the following patient. In general, the estimated duration of each procedure is an excess approximation of the trend of the actual operating time, required to carry out surgery from ‘knife-to-skin’ until completed closure, as recorded in the operative register. The target of the trauma lists is for patients to receive their operation within 48 h from admission. Occasionally, planned delay can occur, due to the need to optimize preoperative condition or the requirement for specific instrumentation/expertise. To improve operating capacity, some patients are booked by the trauma coordinator on elective lists, following last-minute cancellations and on the emergency lists. During weekends, it is the responsibility of the on-call consultant to review and allocate cases to the Saturday morning trauma list and the emergency lists of Saturday and Sunday. During particularly busy times, the combined capacity of the trauma-emergency-elective lists system is exceeded and some patients will be scheduled to have their operation later than 48 h. Also, it can happen that a patient, originally scheduled within 48 h, breaches the original plan, because of an unexpected delay in completing surgery on an earlier case.

The simulation

For those patients who had their operation beyond 48 h, we hypothesized that extra trauma lists could be organized ad hoc within 24 h from admission, using any available staff willing to undertake extra work for an additional payment. The construction of the simulated extra lists followed the same principles used for the daily organization of the actual trauma work, according to a realistic decision-making process. Each simulated extra list was compiled during the week by the author, who: identified any patient on the trauma board, due to receive surgery later than 48 h identified available extra theatre time and available off-duty personnel within 24 h assessed operating time (Table  1), assigning to each extra list the right number of cases. The number of bed occupancy days that could have been saved, had the extra lists been implemented, was obtained by calculating the difference in days, between actual and simulated dates of operation (Table  2). An analysis of the costs of the simulated extra lists was performed by the finance department (Table  3). The cumulative number of notional saved bed- days was multiplied by the figure of £200, which is an average estimate by the hospital finance department of ward costs and overheads over a 10-day period of hospital stay.
Table 2

Group 2—Comparison of actual and simulated surgical activity

PtsAgePlanned operationAdmission dateActual lists dateDays to surgerySimulated listsNotional saved days
140Plating tibial plateau29-March03-April (T)5(31 March)3
249Evac. calf hematoma30-March04-April (T)54
349External fixation tibia30-March04-April (T)54
422Plating tibial plateau12-April15-April (T)3(13 April)2
573Rem. metalwork (Ankle)18-April21-April (E)3(19 April)2
679Sliding hip screw21-April24-April (T)3(23 April)1
784Sliding hip screw23-April26-April (E)33
883Manipulation of shoulder24-April27-April (T)3(26 April)1
995Sliding hip screw25-April28-April (E)32
1022Wiring thumb M. carpal29-April02-May (T)3(30 April)2
1123Plating radial head01-May04-May (T)3(2 May)2
1220Plating bimalleolar #03-May06-May (T)3(4 May)2
1394Sliding hip screw03-May06-May (T)32
1442Plating distal radius03-May07-May (E)43
1583Hemiarthroplasty hip05-May08-May (T)3(6 May)2
1616Nailing of tibia05-May09-May (T)43
1768Plating tibial plateau07-May12-May (T)5(8 May)4
1889Manipulation tibia09-May13-May (T)4(10 May)3
1957I and D thigh abscess09-May13-May (E)43
2087Manipulation distal radius10-May13-May (E)3(11 May)2
2137Removal external fixator11-May15-May (T)44
2248Plating shaft of tibia19-May23-May (T)4(20 May)3
2364Periprosthetic no. (revision)29-May05-June (T)7(1 June)4
2430Plating radius-ulna shafts30-May03-June (T)4(31 May)3
2559Plating proximal humerus04-June09-June (T)5(5 June)4
2612Manipulation radial head05-June09-June (El)44
2766Plating bimalleolar fract.06-June09-June (E)3(8 June)1
2822Removal foreign body08-June12-June (T)44
2982Hemiarthroplasty hip16-June19-June (T)3(18 June)1
3064Plating bimalleolar fract.18-June22-June (T)44
3191Nailing distal femur21-June24-June (T)3(22 June)2
3282Plating bimalleolar fract.21-June24-June (E)32

Patients 1, 7, and 23 had originally been allocated to a regular trauma list within 48 h

T trauma list, E emergency list, El elective list

Table 3

Breakdown of costs per list (2006 figures): hours to be worked outside the normal programmed activities

Currency£
Materials and drugs (estimated average)762
Staff costs
 Anaesthetist480
 Surgeon500
 Band 5 technician68
 Band 5 scrub nurse70
 Band 6 scrub nurse87
 Band 5 recovery staff70
Total costs per list2,037
Group 2—Comparison of actual and simulated surgical activity Patients 1, 7, and 23 had originally been allocated to a regular trauma list within 48 h T trauma list, E emergency list, El elective list Breakdown of costs per list (2006 figures): hours to be worked outside the normal programmed activities

Results

A total of 235 consecutive trauma admissions requiring surgical management were recorded. The mean age for all patients was 51.3 (4–106). The M:F ratio was 125:110. Thirty-one patients were less than 16 years old (mean 11.3, range 4–15). Eighty-eight patients were 65 or older (mean 80.3, range 66–106). There were 54 fractures of neck of femur (NOF), representing 23% of the total (Table 1). Exclusions Ten of 235 patients were excluded. Nine of ten exclusions presented conditions causing delay in scheduling surgery other than lack of operating time, such as the requirement for specific instrumentation/expertise (five cases of spinal stabilization and one complex knee ligaments injury) and the need to optimize preoperative status (three cases). In one case, information available was inadequate. Analysis of the hospital’s surgical registers revealed that of the 225 patients included in the study (Table 1), 108 were operated on 58 regular trauma lists, 109 on emergency lists, of which 25 cases during weekends (including bank holiday Monday, May 1) and the rest on elective lists. One-hundred and ninety-three of these 225 (85%) patients (group 1) received their operation within 48 h from admission. The remaining 32 (Table 2) patients (group 2) had a mean time to operation of 3.8 days (3–7), for reasons related to the lack of operating time. Again, this was despite the use of spare room on elective lists and evenings/weekends. Patients 1, 7 and 23 (Table 2) had originally been allocated on a trauma list within 48 h from admission; however, operating time became insufficient because of unexpected delay in completing surgery on earlier cases. The mean age of group 2 cohort was 57.3 years (12–95). Six of the 32 delayed patients were cases of fractured NOF. Each of these NOF patients was operated on the third day from admission (Table  2). Fourteen of the 32 delayed patients were 65 or older (mean 82.6; range 66–95). The mean delay in this subgroup was 3.1 days (3–4).

Analysis of costs

A cost analysis is presented in Table 4. Implementing the system of extra lists for all 32 ‘delayed’ patients (Table  2) would have reduced the number of days to operation from 3.8 (3–7) to 1 day (0–2), saving 86 days of bed occupancy. Implementing the extra lists, to treat just the 14 elderly patients in group 2, would have required only 11 lists, which in our specific case-series, would have allowed operating on seven additional younger patients. The time to operation for these ‘elderly’ extra lists (including the younger patients squeezed in) would be reduced from 3 days (3–4) to 1 day (0–2). The total number of bed occupancy days potentially saved in this latter hypothesis was 51 (Tables 2, 4).
Table 4

Estimated costs and savings of extra lists

Incremental costsBed-occupancy savings
All 32 delayed patients: 19 lists required14 elderly patients (+7 younger): 11 lists required32 patients: 86 days14 elderly (+7 younger): 51 days
£38,703£22,407£17,200£10,200

An alternative system where only elderly patients would be treated is also considered. In our simulation, this alternative option would have room left over, accommodating seven younger patients

Estimated costs and savings of extra lists An alternative system where only elderly patients would be treated is also considered. In our simulation, this alternative option would have room left over, accommodating seven younger patients

Discussion

This article reports the details of the trauma activity of a typical district hospital of the British National Health Service in a specific period of time. Epidemiological data are presented which can be useful to both researchers and health care providers. The problem of the delay in time to surgery, affecting some trauma patients, is dealt with by testing the feasibility of organizing a system of ad hoc trauma lists and observing both the effects that such a system is likely to produce on the time to operation and its costs and gains. The hypothesis that such a system is easy to organize and affordable is tested. Can the implementation of extra lists reduce waiting time? In our setting, 32 of 225 (15%) patients, having surgical management delayed for 3.8 days, could have been treated within 48 h. It is reasonable to believe that, as a result of an earlier operation, they would have been discharged home earlier. It is generally accepted that elderly patients deserve even more a timely surgical treatment [1]. In our case, the extra lists would have reduced our elderly cohort’s wait from 3.1 (3–4) to 1.1 days (0–2), which is less than half the actual figure. Is it worthwhile spending extra resources to achieve this target for all patients, regardless of age? From the patient’s perspective, anyone would like to leave hospital earlier. From an ethical viewpoint, apart from the need to treat elderly patients promptly, everybody deserves the benefits of reduced pain and suffering, prevention of expensive to treat illness and shorter sick leave. However, the health care provider perspective may be different. What are the actual incremental costs of each extra list? Our calculations are essentially a business-case and provide sample-specific indications on costs, which can help other trusts plan their individual cases. Are there any hidden gains that could compensate for the costs incurred? Discharging patients earlier saves bed occupancy days, which makes a number of beds available to be used to boost elective activity. This can in turn generate resources that at least partially compensate the costs of the ad hoc lists system. A limitation of our analysis is that typical of a business case: it represents a hypothetical exercise. The figures for bed-days saving reported are notional and not actual. In order to make notional savings real, administrators need to decide first whether the 86 bed-days, identified as potentially salvageable are enough to justify closing beds. The freed beds could then be occupied by elective patients and only then acquire an economical value. However, our study strongly suggests that the ad hoc lists system has a significant potential to improve bed capacity. The figure of £200, indicated as the cost of each bed occupancy day by the trust may be smaller than the actual costs incurred. Calculations are in fact based on an average per diem forfeit figure. In reality, costs during the earlier stages of hospital stay can be higher [2] than the costs incurred later on in the stay. The delay assessed in our study occurred during the pre-operative period, which typically requires more intensive treatment and a larger direct nursing time [3]. It is therefore likely that the actual costs of each bed day in our study were in fact higher than the figures indicated by the trust. Another limitation of our study is the lack of a sensitivity analysis on the costs of bed occupancy. It is reasonable to believe, however, that if any variation is to be considered of the cost of a bed-occupancy day that can only be in terms of higher actual costs. This would then reinforce the contribution that this specific figure gives to the cost-benefit equation. Our findings are based on the observation of a specific period of time within a specific geographical area. They are not therefore necessarily generalizable to other trusts and may be sensitive to seasonal variations. It is advisable that trusts conduct similar audits locally, to optimize the external validity.
  3 in total

1.  Cost-benefit analysis of hip fracture treatment.

Authors:  M J Parker; J W Myles; J K Anand; R Drewett
Journal:  J Bone Joint Surg Br       Date:  1992-03

2.  Educational activities on wards under 12 hour shifts.

Authors:  N Reid; C Todd; G Robinson
Journal:  Int J Nurs Stud       Date:  1991       Impact factor: 5.837

3.  Cost analysis of early discharge after hip fracture.

Authors:  W Hollingworth; C Todd; M Parker; J A Roberts; R Williams
Journal:  BMJ       Date:  1993-10-09
  3 in total
  4 in total

1.  Risk factors, costs and complications of delayed hospital discharge from internal medicine wards at a Canadian academic medical centre: retrospective cohort study.

Authors:  Anthony D Bai; Cathy Dai; Siddhartha Srivastava; Christopher A Smith; Sudeep S Gill
Journal:  BMC Health Serv Res       Date:  2019-12-04       Impact factor: 2.655

2.  Multi-Disciplinary Discharge Coordination Team to Overcome Discharge Barriers and Address the Risk of Delayed Discharges.

Authors:  Halah Ibrahim; Thana Harhara; Syed Athar; Satish C Nair; Ahsraf M Kamour
Journal:  Risk Manag Healthc Policy       Date:  2022-02-02

3.  Operative treatment of acute acromioclavicular joint injuries graded Rockwood III and IV: risks and benefits in tight rope technique vs. k-wire fixation.

Authors:  Klemens Horst; Thomas Dienstknecht; Miguel Pishnamaz; Richard Martin Sellei; Philipp Kobbe; Hans-Christoph Pape
Journal:  Patient Saf Surg       Date:  2013-05-30

4.  Impact and experiences of delayed discharge: A mixed-studies systematic review.

Authors:  Antonio Rojas-García; Simon Turner; Elena Pizzo; Emma Hudson; James Thomas; Rosalind Raine
Journal:  Health Expect       Date:  2017-09-12       Impact factor: 3.377