| Literature DB >> 35499198 |
Dharmin D Desai1, Ivan L Cordrey2.
Abstract
Inevitably in clinical stereotactic cranial single isocenter multiple target cases treated with linac-based multi-leaf collimated (MLC) delivery, one encounters planning target volumes (PTVs) in close proximity with overlapping 50% isodose clouds (IDC50%). In such cases, it is very difficult to separate the IDC50% attributable to each individual target and, thus, assess the intermediate dose conformality or R50%. Such scenarios happen regardless of what metric is used to measure intermediate dose spill. Now that universal standards for intermediate dose spill have been proposed, it is important to have a consistent method for apportioning these overlapping IDC50% volumes to allow comparison with the proposed standards when multiple PTVs have overlapping IDC50%. We propose a systematic method for apportioning the IDC50% of multiple targets with overlapping IDC50% based on the relative surface area of each target volume; we call this the fair value estimate (FVE). This FVE system of apportionment is tested for reasonableness by comparing the apportionment of multiple target single isocenter stereotactic treatment with widely spaced targets where the IDC50% can be obviously assigned to demonstrate that the FVE results are very similar to the actual R50% results. We then demonstrate how the FVE system would be applied to cases with overlapping IDC50%. We propose this FVE system for consideration by the cranial stereotactic community for apportioning the intermediate dose spill when that intermediate dose spill overlaps among multiple targets.Entities:
Keywords: IDC50% overlap; R50%; SIMT; cranial SRS/SRT; fair value estimate
Mesh:
Year: 2022 PMID: 35499198 PMCID: PMC9278687 DOI: 10.1002/acm2.13624
Source DB: PubMed Journal: J Appl Clin Med Phys ISSN: 1526-9914 Impact factor: 2.243
Assessing the R50% fair value estimate (FVE) accounting system
| PTV # | Vol (cm | SA (cm | R50%Analytic |
|
| R50%FVE | R50%Actual | Difference |
|
| |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Plan 1 | 37.05 | 6.53 | |||||||||
| 1 | 0.54 | 3.17 | 3.34 | 1.80 | 0.57 | 4.40 | 4.75 | −0.35 | |||
| 2 | 1.96 | 7.52 | 2.84 | 5.57 | 1.36 | 3.53 | 3.48 | 0.05 | |||
| 3 | 0.19 | 1.59 | 3.89 | 0.74 | 0.29 | 5.40 | 6.24 | −0.84 | |||
| 4 | 0.97 | 4.68 | 3.09 | 3.00 | 0.85 | 3.96 | 4.22 | −0.26 | |||
| 5 | 8.00 | 19.22 | 2.43 | 19.41 | 3.47 | 2.86 | 2.80 | 0.06 | |||
| Plan 2 | 24.73 | 6.13 | |||||||||
| 1 | 1.20 | 6.11 | 3.27 | 3.93 | 1.28 | 4.34 | 4.46 | −0.12 | |||
| 2 | 0.98 | 5.61 | 3.48 | 3.41 | 1.17 | 4.68 | 4.55 | 0.13 | |||
| 3 | 0.73 | 4.51 | 3.57 | 2.60 | 0.94 | 4.86 | 4.70 | 0.16 | |||
| 4 | 1.01 | 5.28 | 3.28 | 3.31 | 1.10 | 4.37 | 4.61 | −0.24 | |||
| 5 | 1.67 | 7.85 | 3.20 | 5.35 | 1.64 | 4.18 | 4.10 | 0.08 | |||
| Plan 3 | 34.88 | 9.37 | |||||||||
| 1 | 1.50 | 7.96 | 3.45 | 5.17 | 1.86 | 4.69 | 4.45 | 0.24 | |||
| 2 | 1.44 | 8.62 | 3.74 | 5.39 | 2.02 | 5.15 | 4.88 | 0.27 | |||
| 3 | 1.11 | 6.33 | 3.52 | 3.90 | 1.48 | 4.85 | 4.79 | 0.06 | |||
| 4 | 1.83 | 9.66 | 3.51 | 6.42 | 2.26 | 4.74 | 4.85 | −0.11 | |||
| 5 | 1.28 | 7.44 | 3.62 | 4.63 | 1.74 | 4.98 | 5.37 | −0.39 | |||
| Plan 4 | 16.52 | 5.71 | |||||||||
| 1 | 0.48 | 3.44 | 3.81 | 1.83 | 0.96 | 5.82 | 5.54 | 0.28 | |||
| 2 | 0.47 | 3.39 | 3.82 | 1.79 | 0.95 | 5.84 | 5.77 | 0.07 | |||
| 3 | 0.47 | 3.34 | 3.78 | 1.77 | 0.94 | 5.77 | 5.23 | 0.54 | |||
| 4 | 0.47 | 3.34 | 3.78 | 1.77 | 0.94 | 5.77 | 5.78 | −0.01 | |||
| 5 | 0.48 | 3.43 | 3.80 | 1.82 | 0.96 | 5.80 | 6.07 | −0.27 | |||
| 6 | 0.48 | 3.42 | 3.79 | 1.82 | 0.96 | 5.79 | 6.82 | −1.03 | |||
| Plan 5 | 37.27 | 9.45 | |||||||||
| 1 | 1.50 | 6.97 | 3.14 | 4.71 | 1.60 | 4.21 | 3.72 | 0.49 | |||
| 2 | 1.48 | 6.85 | 3.13 | 4.63 | 1.57 | 4.19 | 4.17 | 0.02 | |||
| 3 | 1.46 | 6.74 | 3.12 | 4.56 | 1.55 | 4.18 | 4.19 | −0.01 | |||
| 4 | 1.47 | 6.81 | 3.13 | 4.60 | 1.56 | 4.19 | 4.11 | 0.08 | |||
| 5 | 1.48 | 6.90 | 3.15 | 4.65 | 1.58 | 4.22 | 4.38 | −0.16 | |||
| 6 | 1.49 | 6.89 | 3.13 | 4.66 | 1.58 | 4.19 | 4.73 | −0.54 | |||
| Plan 6 | 72.15 | 20.09 | |||||||||
| 1 | 3.10 | 10.95 | 2.81 | 8.72 | 3.37 | 3.90 | 3.65 | 0.25 | |||
| 2 | 3.10 | 10.84 | 2.80 | 8.67 | 3.34 | 3.87 | 3.69 | 0.18 | |||
| 3 | 3.12 | 10.89 | 2.79 | 8.72 | 3.35 | 3.87 | 3.72 | 0.15 | |||
| 4 | 3.12 | 10.94 | 2.80 | 8.74 | 3.37 | 3.88 | 3.82 | 0.06 | |||
| 5 | 3.06 | 10.82 | 2.81 | 8.61 | 3.33 | 3.90 | 4.14 | −0.24 | |||
| 6 | 3.06 | 10.82 | 2.81 | 8.61 | 3.33 | 3.90 | 4.33 | −0.43 | |||
| Plan 7 | 89.45 | 16.08 | |||||||||
| 1 | 4.60 | 14.12 | 2.67 | 12.30 | 2.70 | 3.26 | 3.24 | 0.02 | |||
| 2 | 4.58 | 13.96 | 2.66 | 12.19 | 2.67 | 3.24 | 3.04 | 0.20 | |||
| 3 | 4.61 | 14.12 | 2.67 | 12.31 | 2.70 | 3.26 | 3.23 | 0.03 | |||
| 4 | 4.60 | 14.09 | 2.67 | 12.28 | 2.69 | 3.25 | 3.23 | 0.02 | |||
| 5 | 4.54 | 13.93 | 2.67 | 12.12 | 2.66 | 3.26 | 3.32 | −0.06 | |||
| 6 | 4.55 | 14.00 | 2.67 | 12.17 | 2.67 | 3.26 | 3.45 | −0.19 |
Note: The data given are summary data from previously published work (through private communication), , and each plan is a single isocenter multiple target case for well‐separated planning target volumes (PTVs). The 50% isodose clouds (IDC50%) for each PTV is clearly encompassing only one PTV each, and as such, the IDC50% associated with each PTV is unambiguously identified. Thus, R50%Actual is considered “the correct answer.” V PTV is obtained directly from the treatment planning system. SAPTV is obtained from a surface area script in the treatment planning system. R50%Analytic is the semi‐empirical minimum R50% value from which the is derived [Equation (1)]. V FVE is the volume of additional (more than R50%Analytic) IDC50% assigned to a PTV as calculated by Equation (4). R50%FVE is the final result for the FVE for R50% given by Equation (7). In these cases, the FVE accounting system is not truly needed because the IDC50% of each PTV is easily identified, but this does provide a method for assessing the validity of the FVE in cases when the true answer is known from the planning study (R50%Actual). The difference listed is R50%FVE − R50%Actual.
FIGURE 1Comparison plot of R50%Actual and R50%FVE versus planning target volume (PTV) volume for the cases listed in Table 1. There are six R50%FVE values at nearly the same V PTV at nominal values of 0.48, 1.48, 3.1, and 4.58 cm3. Because there are six data points at these volumes, the data markers are nearly coincident and can easily be mistaken for a bold “X.” Notice the R50%Actual and R50%FVE values fall in the same general band, which indicates that the fair value estimate (FVE) accounting system is a reasonable approximation of the R50%Actual
FIGURE 2DRR images of the Radiosurgery Society (RSS) Case 2 phantom illustrating planning target volumes (PTVs) that have overlapping 50% isodose clouds (IDC50%) volumes. The solid color shapes are the PTVs. The transparent yellow volume is the overlapping IDC50% that must be separated by the fair value estimate (FVE) accounting system. (a) The AP and lateral DRRs of a two PTVs of different volumes and surface areas and their associated overlapping IDC50% volume. (b) The AP and lateral DRRs of two PTVs with a larger volume and surface area difference. (c) The AP and lateral DRRs of a three PTV case. The quantitative data for these cases are given in Table 2
Applying the R50% fair value estimate (FVE) accounting system
| PTV # | Vol (cm3) | SA (cm2) | R50%Analytic |
|
| R50%FVE |
|
| |
|---|---|---|---|---|---|---|---|---|---|
| 2PTVs‐1Iso | 29.34 | 15.60 | |||||||
| 1 | 1.02 | 5.46 | 3.33 | 3.40 | 4.76 | 8.00 | |||
| 2 | 3.76 | 12.44 | 2.75 | 10.34 | 10.84 | 5.63 | |||
| 2PTVsLrgSml | 40.40 | 21.03 | |||||||
| 1 | 0.47 | 3.41 | 3.83 | 1.80 | 3.29 | 10.84 | |||
| 2 | 6.91 | 18.36 | 2.54 | 17.57 | 17.74 | 5.11 | |||
| 3PTVs‐1Iso | 57.34 | 38.28 | |||||||
| 1 | 1.02 | 5.46 | 3.33 | 3.40 | 8.20 | 11.37 | |||
| 2 | 3.76 | 12.44 | 2.75 | 10.34 | 18.69 | 7.72 | |||
| 3 | 1.75 | 7.58 | 3.04 | 5.32 | 11.39 | 9.55 |
Note: Each plan is a single isocenter multiple target case for planning target volumes (PTVs) in close proximity such that the 50% isodose clouds (IDC50%) of the individual PTVs overlap. V IDC50% cannot be easily assigned to the individual PTVs without some objective accounting system for the IDC50%, and as a result, individual R50% values cannot be determined for the PTVs. R50%Analytic is the semi‐empirical minimum R50% value from which the is derived [Equation (1)]. V FVE is the volume of additional IDC50% assigned to a PTV as calculated by Equation (4). R50%FVE is the final result for the FVE for R50% given by Equation (7). For these cases, there is no “actual” value of R50% for comparison because there is no unambiguous method or universally accepted accounting system for assigning the overlapping IDC50%.
FIGURE 3DRR images of the Radiosurgery Society (RSS) Case 1 phantom illustrating the nine planning target volume (PTV) case. There are two clusters of PTVs that have overlapping 50% isodose clouds (IDC50%) volumes for which we apply the fair value estimate (FVE) accounting system. The solid color shapes are the PTVs. The transparent yellow volume is the IDC50%. There are two overlapping IDC50% regions that must be separated by the FVE accounting system: (1) the three PTVs in the anterior cranium clustered around the large orange PTV and (2) the two PTVs in the posterior cranium clustered around the brown PTV. The quantitative data for this example are given in Table 3
Summary data of fair value estimate (FVE) applied to a nine planning target volume (PTV) single isocenter multiple target case shown in Figure 3
| PTV # | Vol (cm3) | SA (cm2) | R50%Analytic |
|
| R50%FVE | R50%Actual |
|
|
|---|---|---|---|---|---|---|---|---|---|
| 4.76 | 1.20 | ||||||||
| 1 | 0.25 | 2.08 | – | – | – | – | 5.16 | ||
| 4 | 0.28 | 2.15 | – | – | – | – | 4.82 | ||
| 6 | 0.17 | 1.57 | – | – | – | – | 5.76 | ||
| 9 | 0.20 | 1.71 | – | – | – | – | 5.70 | ||
| 67.49 | 17.64 | ||||||||
| 2 | 0.72 | 4.08 | 3.35 | 2.41 | 1.62 | 5.60 | – | ||
| 3 | 20.12 | 38.61 | 2.32 | 46.64 | 15.33 | 3.08 | – | ||
| 5 | 0.20 | 1.74 | 4.02 | 0.80 | 0.69 | 7.48 | – | ||
| 6.75 | 2.66 | ||||||||
| 7 | 0.34 | 2.46 | 3.70 | 1.26 | 0.93 | 6.43 | – | ||
| 8 | 0.87 | 4.60 | 3.25 | 2.83 | 1.73 | 5.25 | – |
Note: The first four PTVs (1, 4, 6, 9) have clearly distinguishable 50% isodose clouds (ICD50%) volumes, and FVE is not used for them. The second group of three PTVs (2, 3, 5) are a cluster with overlapping IDC50% for which FVE is used to assign the IDC50% volume () within that cluster. is the volume of IDC50% that cannot be assigned to a PTV based on R50%Analytic and is assigned based on Equation (4), which allows for the calculation of R50%FVE from Equation (7). Similarly, the last two PTVs (7, 8) are a cluster of PTVs with overlapping IDC50% for which FVE is applied separately within this cluster of two PTVs.