| Literature DB >> 29558932 |
Steffie M van Schoten1, Janneke Hoogervorst-Schilp2, Peter P Groenewegen2,3, Peter Spreeuwenberg2, Cordula Wagner2,4.
Abstract
Entities:
Keywords: Healthcare; Hospital quality systems; Patient safety; Quality; Quality improvement
Mesh:
Year: 2018 PMID: 29558932 PMCID: PMC5859445 DOI: 10.1186/s12913-018-2997-x
Source DB: PubMed Journal: BMC Health Serv Res ISSN: 1472-6963 Impact factor: 2.655
Content and data collection of the five patient safety themes to evaluate implementation of the Safety Program
| Patient Safety Theme | Aim within the Safety Program | Interventions in modules of the Safety Program | Design evaluation study | Process indicator evaluation study |
|---|---|---|---|---|
| Theme 1. Wrong surgery | Reducing the amount of wrong patient, wrong site, wrong procedure events. The aim is 0 events. | Time-out verification before surgery during which the total OR team is present and checks patient name, procedure to be performed and where to perform procedure (site and side). | Observational research with 6–10 observations of operations during 10 measurements in 18 hospitals. | Percentage of operations in which all 3 steps of the Time Out Procedure were performed correctly. |
| Theme 2. Contrast- induced nephropathy | Prevention of contrast-induced nephropathy by identifying all high-risk patients and taking suitable preventive measures | 1. Identifying high risk patients (eGFR and medication review) | Patient record review with 20–25 randomly selected records during 10 measurements in 19 hospitals. | Percentage of high-risk patients who were hydrated before undergoing contrast administration. |
| Theme 3. Early recognition and treatment of pain | Reduce avoidable suffering by early recognition and treatment of pain. | 1. three times a day: a standardized pain measurement | Patient record review with 20–25 randomly selected records during 10 measurements in 19 hospitals. | Percentage of postoperative patients who were in pain was measured in a standardized way three times a day in the first three days after surgery |
| Theme 4. Medication reconciliation | Medication reconciliation on admission and discharge. | Bundle 1. Medication reconciliation on admission | Patient record review with 20–25 randomly selected records during 10 measurements in 19 hospitals. | Percentage of patients for whom the bundle of medication reconciliation on admission and discharge had been implemented completely. |
| Theme 5. High-risk medication | Implementing the described process for preparing and administering parenteral medication | 1. Process of preparing parenteral medication in non-acute situations | Observational research with 20–25 observations of administration processes of parenteral medication at the intensive care unit, internal medicine and general surgery departments within during 10 measurements in 19 hospitals | Percentage of administration processes in which all recommended steps have been followed by the person administering the drug |
Adopted from De Blok et al. 2013 [20]
Fig. 1Data flow diagram for observations included in the present study
Descriptors of hospital quality system development and patient safety themes
| Hospital Quality System development | n | Mean | SD | Range |
|---|---|---|---|---|
| Overall | 30 | 2.30 | 0.41 | 1–3 |
| Policy and strategy | 30 | 2.50 | 0.53 | 1–3 |
| Human resource management | 30 | 2.66 | 0.52 | 1–3 |
| Patient involvement | 30 | 1.56 | 0.92 | 0–3 |
| Practice guidelines | 30 | 2.54 | 0.60 | 1–3 |
| Systematic quality improvement | 30 | 2.22 | 0.93 | 1–3 |
| Patient Safety themes | Mean % | SD | Range | |
| Time out procedure | 1024 | 73 | 44 | 0–100 |
| - Check patient | - 96 | - 21 | - 0-100 | |
| - Check procedure | - 83 | - 40 | - 0-100 | |
| - Check side/site | - 92 | - 27 | - 0-100 | |
| - Focus during Time-out Procedure | - 55 | - 50 | - 0-100 | |
| Contrast- induced nephropathy | 455 | 67 | 47 | 0–100 |
| Pain process indicator 100% | 3919 | 12 | 33 | 0–100 |
| Medication reconciliation on admission | 2696 | 35 | 48 | 0–100 |
| Medication reconciliation at discharge | 2568 | 12 | 33 | 0–100 |
| High-Risk Medication | 1550 | 18 | 38 | 0–100 |
Variation between hospitals in the association between hospital quality system development and outcomes for patient safety themes
| Intercept-only model | Quality system (overall) | 1: Policy and strategy | 2: Human resource management | 3: Patient involvement | 4: Practice guidelines | 5: Systematic quality improvement | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Patient Safety themes | Hospital range | ICC | Hospital range | ICC | Hospital range | ICC | Hospital range | ICC | Hospital range | ICC | Hospital range | ICC | Hospital range | ICC |
| Time-out procedure | 16–98 | 35.9 | 24–96 | 27.5 | 22–97 | 29.4 | 19–97 | 33.2 | 17–98 | 35.7 | 20–97 | 32.6 | 20–97 | 32.3 |
| - Check patient | 74–100 | 38.3 | 85–100 | 26.0 | 83–100 | 28.4 | * | * | 83-100 | 28.4 | * | * | 76-100 | 36.8 |
| - Check procedure | 16–100 | 51.6 | 23–100 | 46.5 | 20–100 | 49.0 | 18–100 | 50.2 | 17–100 | 51.9 | 18–100 | 50.7 | 22–100 | 47.0 |
| - Check side/site | 79–98 | 11.6 | 83–97 | 7.2 | 80–98 | 10.6 | 80–98 | 10.6 | 89–96 | 1.9 | 79–98 | 11.6 | 79–98 | 11.4 |
| - Focus during TOP | 18–88 | 19.8 | 19–87 | 18.4 | 18–88 | 19.0 | 18–88 | 19.8 | 20–87 | 17.2 | 18–89 | 20.1 | 18–88 | 20.1 |
| Contrast- induced nephropathy | 22–93 | 23.1 | 24–93 | 21.1 | 33–90 | 45.7 | 22–94 | 23.3 | 29–91 | 17.2 | 22–94 | 23.4 | 22–93 | 22.7 |
| Pain process indicator 100% | 0.4–56 | 38.9 | 0.4–55 | 39.1 | 0.4–54 | 38.4 | 0.4–54 | 38.9 | 0.4–52 | 37.1 | 0.4–53 | 37.5 | 0.4–55 | 39.0 |
| Medication reconciliation on admission | 0.6–96 | 58.1 | 0.6–0.96 | 58.4 | 0.6–96 | 58.3 | 0.5–97 | 59.4 | 0.7–95.7 | 55.9 | 0.5–97 | 59.0 | 0.5–96.8 | 59.9 |
| Medication reconciliation at discharge | 0.1–61 | 50.7 | 0.1–56.9 | 49.1 | 0.2–47 | 43.2 | 0.1–57 | 49.4 | 0.1–59 | 50.9 | 0.1–52 | 46.2 | 0.1–58 | 49.9 |
| High-Risk Medication | 0.8–69 | 38.9 | 0.8–68 | 38.3 | 0.7–69 | 39.2 | 0.9–65 | 35.9 | 1.2–60 | 31.3 | 0.7–68 | 38.8 | 0.7–69 | 38.9 |
*there were not enough observations to calculate the associations between Human Resource Management & Practice Guidelines and Check Patient
Separate associations between hospital quality system development and outcomes for patient safety themes
| Model 1 | 1: Policy and strategy | 2: Human resource management | 3: Patient involvement | 4: Practice guidelines | 5: Systematic quality improvement | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Outcome | Estimate (SE) | R2 | Estimate (SE) | R2 | Estimate (SE) | R2 | Estimate (SE) | R2 | Estimate (SE) | R2 | Estimate (SE) | R2 |
| Time-out procedure | −1.89 (0.82) | 32.3 | − 1.33 (0.66) | 25.4 | − 1.25 (0.89) | 11.4 | −0.16 (0.38) | 0.9 | −1.08 (0.74) | 13.7 | −0.57 (0.37) | 14.7 |
| - Check patient | −2.49 (1.13) | 43.5 | −1.65 (0.88) | 36.2 | – | – | −0.73 (0.40) | 36.0 | – | – | 0.19 (0.51) | 6.1 |
| - Check procedure | −2.61 (1.37) | 18.3 | −1.46 (1.06) | 9.6 | −1.78 (1.48) | 5.2 | −0.18 (0.58) | −1.2 | −1.02 (1.13) | 3.3 | −1.02 (0.55) | 16.8 |
| - Check side/site | −0.96 (0.49) | 40.8 | −0.32 (0.44) | 8.8 | −0.40 (0.54) | 8.8 | −0.59 (0.14) | 8.5 | 0.09 (0.46) | −0.5 | −0.02 (0.23) | 1.0 |
| - Focus during TOP | −0.75 (0.62) | 8.8 | −0.45 (0.50) | 4.8 | −0.28 (0.61) | −0.1 | − 0.39 (0.24) | 15.8 | − 0.08 (0.53) | −1.9 | −0.02 (0.27) | −1.7 |
| Contrast- induced nephropathy | 0.86 (0.68) | 0.11 | 0.29 (0.44)** | 14.0 | −0.08 (0.63) | −0.9 | 0.55 (0.25)* | 30.8 | −0.11 (0.45) | −1.7 | −0.17 (0.29) | 2.2 |
| Pain process indicator 100% | 0.09 (0.98) | −0.5 | −0.55 (0.75) | 2.3 | 0.41 (0.89) | 0.1 | 0.28 (0.37) | 7.3 | −0.66 (0.62) | 5.8 | 0.12 (0.40) | −0.2 |
| Medication reconciliation on admission | 0.64 (1.40) | −1.3 | 0.53 (0.99) | −0.9 | 0.42 (1.06) | −5.5 | 0.97 (0.76) | 8.4 | −0.41 (1.00) | −3.8 | −0.13 (0.67) | −7.5 |
| Medication reconciliation at discharge | 1.01 (1.30) | 6.3 | 1.73 (0.87)* | 26.0 | −0.64 (0.87) | 5.0 | −0.002 (0.74) | −0.8 | 1.33 (0.92) | 16.6 | 0.21 (0.59) | 3.1 |
| High-Risk Medication | 0.51 (0.91) | 2.4 | −0.04 (0.68) | −1.2 | −0.81 (0.61) | 12.0 | 0.89 (0.42)* | 28.4 | 0.20 (0.66) | 0.1 | 0.20 (0.45) | −0.1 |
* p < 0.10, **p < 0.05