| Literature DB >> 27124012 |
Steve New1, Mohammed Hadi2, Sharon Pickering2, Eleanor Robertson3, Lauren Morgan3, Damian Griffin2, Gary Collins4, Oliver Rivero-Arias5, Ken Catchpole6, Peter McCulloch3.
Abstract
OBJECTIVES: To examine the effectiveness of a "systems" approach using Lean methodology to improve surgical care, as part of a programme of studies investigating possible synergy between improvement approaches.Entities:
Mesh:
Year: 2016 PMID: 27124012 PMCID: PMC4849765 DOI: 10.1371/journal.pone.0152360
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Example Patient Flow Chart.
Fig 2NOTECHS II Results.
Each dot is the individual Total Oxford NOTECHS II score for an individual operation, and the size of the dot represents the duration of the operation.
Completion of WHO Checklist.
| Pre-intervention | Post-intervention | ||
|---|---|---|---|
| 20/21 (95%) | 16/16 (100%) | ||
| 16/21 (76%) | 12/16 (75%) | ||
| 15/21 (71%) | 15/16 (94%) | ||
| 18/21 (86%) | 15/16 (94%) | ||
| 0/21 (0%) | 1/16 (6%) | ||
| 17/17 (100%) | 24/25 (91%) | ||
| 7/17 (41%) | 13/25 (52%) | ||
| 9/17 (53%) | 17/25 (68%) | ||
| 11/17 (65%) | 20/25 (80%) | ||
| 0/17 (0%) | 1/25 (4%) |
Fig 3Glitch Rates.
Each dot is the individual Glitch Rate for an individual operation and the size of the dot represents the duration of the operation.
Main process and outcome results.
| Active | Control | P value (Δ control VS Δ INTERVENTION) | |||
|---|---|---|---|---|---|
| Pre-intervention | Post-intervention | Pre-intervention | Post-intervention | ||
| NOTECHS Mean (SD) | 73 (7.1) | 77.84 (11.59) | 71.81 (7.72) | 78.06 (6.57) | 0.938 |
| WHO Time Out attempt | 17/17 (100%) | 24/25 (96%) | 20/21 (95%) | 16/16 (100%) | 1 |
| WHO Time-Out complete compliance | 3/17 (18%) | 9/25 (36%) | 11/21 (52%) | 10/16 (62%) | 0.621 |
| WHO Sign Out | 0/17 (0%) | 1/25 (4%) | 0/21 (0%) | 1/16 (6%) | 1 |
| Glitch rate/hour | 7.85 (2.69) | 6.59 (3.95) | 6.52 (3.06) | 7.94 (4.01) | 0.098 |
| 90-day Readmissions | 94 (20%) | 102 (18%) | 130 (19%) | 55 (18%) | 0.3 |
| Complications | 47 (10%) | 70 (12%) | 95 (14%) | 32 (10%) | 0.07 |
| Length of Stay in days (SD) | 10.3 (25) | 7.7 (15) | 10.2 (20) | 7.6 (16) | 0.396 |
Summary of changes following secondary intervention
| Dec-11 | Mar -12 | |
|---|---|---|
| Mean post take ward round (PTWR) start time | 08:12 | 07:59 |
| Mean PTWR first patient review time | 08:16 | 08:05 |
| Mean PTWR second patient review time | 08:41 | 08:08 |
| Any communication with anaesthetist? (Y/N) | 30% | 44% |
| % of days on which operating plan was changed after PTWR | 20% | 0% |
| Patient reviewed by anaesthetist/ other? | 40% | 100% |
| Did first patient on printed list remain first on list? (Y/N) | 50% | 100% |
| Did the plan change from the printed plan during the trauma meeting? | 70% | 22% |
| Mean time porters/staff arrive to collect first patient from ward | 08:18 | 08:10 |
| Mean time first patient left ward | 08:29 | 08:15 |
| Mean time patient arrived to anaesthetic room | 08:48 | 08:25 |
| Mean time patient entered theatres | 09:11 | 09:22 |
| Mean time surgeon in theatre for case | 08:46 | 08:38 |
| Mean time prep started | 09:22 | 09:29 |
| Mean time knife to skin | 09:37 | 09:37 |