Catherine Trask1, Svend Erik Mathiassen, Jens Wahlström, Marina Heiden, Mahmoud Rezagholi.
Abstract
BACKGROUND: Documentation of posture measurement costs is rare and cost models that do exist are generally naïve. This paper provides a comprehensive cost model for biomechanical exposure assessment in occupational studies, documents the monetary costs of three exposure assessment methods for different stakeholders in data collection, and uses simulations to evaluate the relative importance of cost components.Entities:
Mesh:
Year: 2012 PMID: 22738341 PMCID: PMC3439320 DOI: 10.1186/1471-2288-12-89
Source DB: PubMed Journal: BMC Med Res Methodol ISSN: 1471-2288 Impact factor: 4.615
Study design parameters and selected costs for 6 different simulated scenarios for use with the cost mode All costs are in Euros
| Simulation 1: no accommodation | 51 | 0 | 27 | 51 | 80 | 29 | 273 | 22 | 8431* |
| Simulation 2: 1 worker per researcher-day | 45 | 60 | 80 | 80 | 80 | 0 | 273 | 22 | 8431* |
| Simulation 3: 4 workers per researcher-day | 14 | 15 | 27 | 20 | 80 | 60 | 273 | 22 | 8431* |
| Simulation 4: No travel costs | 30 | 0 | 27 | 51 | 80 | 29 | 0 | 22 | 8431* |
| Simulation 5: No equipment costs | 30 | 38 | 27 | 51 | 80 | 29 | 273 | 22 | 0 |
| Simulation 6: Recruitment costs set to 10-fold | 30 | 38 | 27 | 51 | 80 | 29 | 273 | 220 | 8431* |
nt Number of trips to the worksite.
nn Number of nights spent at the worksite.
nw Number of workers.
nd Total number of researcher days.
nm Number of worker-days.
nc Number of concurrently measured workers.
ċV Travel cost.
ċR Recruitment unit cost.
ČE Equipment fixed costs.
* Fixed equipment cost for inclinometer. Observation ČE = 4496 Questionnaire ČE = 2401.
Other costs were kept at the observed values in the realized study.
Cost model components for three measurement methods in the current study(sd)
| ČM (Planning meetings) | € 2340 | | | | |
| ČA (Administration) | € 2548 | | | | |
| ČR (Recruitment administration) | € 2216 | | | | |
| ČE (Equipment) | € 2401 | | € 6030 | € 2095 | |
| ČT (Piloting and training) | € 4916 | | € 1777 | € 693 | € 559 |
| | |||||
| ċV (Unit cost per trip to worksite) | € 273 (€159) | nt = 30 | … | … | … |
| ċH (Unit cost per accommodation day) | € 149 (€22) | nn - = 38 | … | … | … |
| ċR (Unit cost of worker recruitment) | € 22 (€14) | nw = 27 | … | … | … |
| ċS (Unit cost of measurement supplies) | … | nm = 80 | € 1 | … | € 4 |
| ċF (Unit cost of first worker measured) | … | nd = 51 | € 508 | € 342 | € 135 |
| ċC (Unit cost of concurrently measured workers) | … | nc = 29 | € 83 (€ 49) | € 216 (€ 70) | € 9 (€ 8) |
| … | € 65342 | € 55 714 | € 36 925 | ||
aresearcher, employer, and worker production costs combined.
bcosts that are required no matter which method is used.
ctotal study cost for applying that method, including the costs in the first column.
Proportion of costs borne by different stakeholders
| ČM (Planning meetings) | € 1170 | € 1170, | … |
| ČA (Administration) | € 1897 | € 754 | … |
| ČR (Recruitment administration) | € 1748 | € 468 | … |
| ČE (Equipment) | € 10 526 | … | … |
| ČT (Piloting and training) | € 7686, | … | € 260 |
| ČR Recruitment time | € 1413 | … | … |
| ĊV & ĊH (Measurement travel) | € 7659 | … | … |
| ĊD (Measurement preparation) | € 6456 | … | € 4162 |
| ĊD (Measurement time and supplies) | € 25 539 | … | … |
Total study cost using the present study unit costs and different simulated design parameters
| Simulation 1: No travel or accommodation costs | € 65 413 | € 55 705 | € 37 236 |
| Simulation 2: One worker per research day | € 85 040 | € 66 661 | € 48 192 |
| Simulation 3: Four workers per research day | € 44 372 | € 43 933 | € 25 464 |
| Simulation 4: No travel and accommodation costs | € 51 217 | € 41 509 | € 23 040 |
| Simulation 5: No equipment costs | € 56 911 | € 51 138 | € 34 764 |
| Simulation 6: Recruitment costs set to 10-fold | € 70 688 | € 60 980 | € 42 511 |