| Literature DB >> 24118872 |
Catherine Trask1, Svend Erik Mathiassen, Jennie Jackson, Jens Wahlström.
Abstract
BACKGROUND: Data processing contributes a non-trivial proportion to total research costs, but documentation of these costs is rare. This paper employed a priori cost tracking for three posture assessment methods (self-report, observation of video, and inclinometry), developed a model describing the fixed and variable cost components, and simulated additional study scenarios to demonstrate the utility of the model.Entities:
Mesh:
Year: 2013 PMID: 24118872 PMCID: PMC4015999 DOI: 10.1186/1471-2288-13-124
Source DB: PubMed Journal: BMC Med Res Methodol ISSN: 1471-2288 Impact factor: 4.615
Figure 1Example of trunk and upper arm postures that were deemed necessary to correct. Permission to publish this image has been secured from the individual.
Figure 2Example of the allocation of the shift between four observers, including the ‘overlap’ section to assess inter-observer agreement.
Figure 3Views of the ViSPA observation software operation for the shoulder (a) and trunk (b).
Study parameters for alternative study scenarios simulated with the cost model
| Design 1: current study | 4b/2a, c | 2b/1c | 80 | 4 | 0.30 | 1 |
| Design 2: no training or software costs | 80 | 4 | 0.30 | 1 | ||
| Design 3: double the work shift files | 4b/2a, c | 2b/1c | 4 | 0.30 | 1 | |
| Design 4: full observation overlap | 4b/2a, c | 2b/1c | 80 | 4 | 1 | |
| Design 5: 2 hours observed per half-shift | 4b/2a, c | 2b/1c | 80 | 4 | 1 | |
| Design 6: longer observer analysis timeb | 80 | 4 | 0.30 | |||
| Design 7: shorter analysis time for inclinometer recordings and questionnaires | 80 | 4 | 0.30 |
ainclinometer.
bobservation.
cquestionnaire.
Items in bold represent parameters which are different than the present study.
Data processing cost components for the three measurement methods in the current study
| ČA planning and administration | € 8,245 | € 5,114 | € 8,639 | € 510 |
| ČS software | € 0 | € 10,924 | € 3,479 | € 613 |
| Sum of fixed costs (ČA + ČS) | € 8,245 | € 16,038 | € 12,118 | € 1,123 |
| ċT unit cost of training trainees | € 0 | € 0 | € 920 | € 510 |
| ċI unit cost of instructors | € 0 | € 0 | € 1,288 | € 794 |
| ċF unit cost of file analysis | € 0 | € 25 | € 50 | € 16 |
| ĊT training costs | € 0 | € 0 | € 6,256 | € 1,815 |
| ĊM costs of managing (handling) data | € 0 | € 1,972 | € 4,012 | € 1,307 |
| Sum of variable costs (ĊT + ĊM ) | € 0 | € 1,972 | € 10,268 | € 3,122 |
| Total fixed and variable costs (column sum of fixed and variable costs) | € 8,245 | € 18,010 | € 22,385 | € 4,245 |
| CP | € 26,255 | € 30,630 | € 12,491 | |
acosts that are required no matter which method is used.
brepresents the total data processing phase cost for applying that method, including the costs in the first column.
Total data processing costs, C (cf. Eq. 1) for actual study and six simulated study scenarios
| Design 1: current study | € 26,255 | € 30,630 | € 12,491 |
| Design 2: no training or software costs | |||
| Design 3: double the work shift files | € 36,248 | ||
| Design 4: full observation overlap | € 26,255 | € 12,492 | |
| Design 5: 2 hours observed per work shift | € 26,255 | € 28,625 | € 12,492 |
| Design 6: double observation time of videos | € 26,255 | € 36,248 | € 12,492 |
| Design 7: half the processing time for inclinometer recordings and questionnaires | € 25,269 | € 30,630 | € 11,839 |
Maximum and minimum modeled costs shown in bold for each measurement method.
Combined data collection and data processing costs from the current study
| CC | € 28,854 | € 36,475 | € 26,515 | € 8,011 |
| CP | € 8,245 | € 18,010 | € 22,385 | € 4,246 |
| Data collection and data processing costs (sum of two first rows in the column) | € 37,099 | € 54,485 | € 48,900 | € 12,257 |
| C | € 91,584 | € 85,999 | € 49,357 |
acosts that are required no matter which method is used.
brepresents the total study cost for applying that method, including the costs in the first column.
*as reported in Trask et al. [10].