| Literature DB >> 21756330 |
Jean-Benoit Hardouin1, Ronán Conroy, Véronique Sébille.
Abstract
BACKGROUND: Nowadays, more and more clinical scales consisting in responses given by the patients to some items (Patient Reported Outcomes - PRO), are validated with models based on Item Response Theory, and more specifically, with a Rasch model. In the validation sample, presence of missing data is frequent. The aim of this paper is to compare sixteen methods for handling the missing data (mainly based on simple imputation) in the context of psychometric validation of PRO by a Rasch model. The main indexes used for validation by a Rasch model are compared.Entities:
Mesh:
Year: 2011 PMID: 21756330 PMCID: PMC3161025 DOI: 10.1186/1471-2288-11-105
Source DB: PubMed Journal: BMC Med Res Methodol ISSN: 1471-2288 Impact factor: 4.615
Summary table of the characteristics of the imputation methods used to handle missing data
| Method | Ability of the individual | Difficulty of the item | Addition of a random process | Likelihood based approach |
|---|---|---|---|---|
| NOIMP | ||||
| LD | ||||
| WORST | ||||
| PMS | X | X | ||
| IMS | X | X | ||
| CIM | X | X | X | |
| ICS | X | X | ||
| LOG | X | X | X | X |
| MOK | X | X | ||
| RAS | X | X | X | X |
| RAI | X | X | X |
Bias on the Loevinger's H coefficient as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1)
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | 0.08/0.08 | 0.08/0.08 | 0.08/0.07 | 0.14/0.13 | 0.14/0.13 | 0.14/0.13 | 0.18/0.17 | 0.18/0.17 | 0.17/0.16 |
| PMS-R | 0.04/0.04 | 0.04/0.04 | 0.04/0.04 | 0.07/0.08 | 0.07/0.07 | 0.07/0.07 | 0.10/0.10 | 0.09/0.09 | 0.09/0.09 |
| IMS | -0.02/-0.02 | -0.02/-0.02 | -0.02/-0.02 | -0.03/-0.03 | -0.04/-0.04 | -0.04/-0.04 | -0.04/-0.04 | -0.05/-0.05 | -0.06/-0.06 |
| IMS-R | -0.04/-0.04 | -0.04/-0.04 | -0.04/-0.04 | -0.07/-0.07 | -0.07/-0.07 | -0.08/-0.08 | -0.09/-0.09 | -0.09/-0.09 | -0.10/-0.10 |
| CIM | 0.09/0.09 | 0.09/0.09 | 0.09/0.09 | 0.15/0.15 | 0.15/0.15 | 0.15/0.15 | 0.19/0.19 | 0.20/0.20 | 0.19/0.20 |
| CIM-R | 0.05/0.04 | 0.05/0.04 | 0.05/0.04 | 0.08/0.07 | 0.09/0.07 | 0.08/0.07 | 0.11/0.09 | 0.11/0.09 | 0.10/0.08 |
| ICS | 0.04/0.04 | 0.04/0.04 | 0.04/0.04 | 0.07/0.07 | 0.07/0.07 | 0.07/0.07 | 0.09/0.09 | 0.09/0.09 | 0.08/0.08 |
| LOG | 0.03/0.04 | 0.03/0.04 | 0.03/0.03 | 0.04/0.04 | 0.04/0.04 | 0.03/0.03 | 0.04/0.03 | 0.03/0.03 | 0.00/0.01 |
| LOG-R | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.01 | -0.02/-0.02 | -0.02/-0.03 | -0.03/-0.03 | -0.04/-0.04 | -0.05/-0.05 | -0.06/-0.06 |
| MOK | 0.05/0.05 | 0.05/0.05 | 0.05/0.05 | 0.09/0.10 | 0.09/0.09 | 0.09/0.09 | 0.12/0.12 | 0.12/0.12 | 0.11/0.12 |
| RAS | 0.02/0.02 | 0.02/0.02 | 0.02/0.02 | 0.04/0.04 | 0.04/0.04 | 0.03/0.04 | 0.04/0.05 | 0.04/0.05 | 0.04/0.05 |
| RAS-R | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.01 | -0.01/-0.02 | -0.02/-0.02 | -0.02/-0.02 |
| RAI | 0.03/0.03 | 0.03/0.03 | 0.03/0.03 | 0.12/0.10 | 0.12/0.10 | 0.11/0.10 | 0.16/0.15 | 0.16/0.15 | 0.15/0.15 |
| WORST | -0.05/-0.04 | -0.03/-0.03 | -0.02/-0.01 | -0.09/-0.07 | -0.07/-0.05 | -0.04/-0.02 | -0.11/-0.09 | -0.09/-0.07 | -0.07/-0.04 |
| NOIMP | 0.00/-0.00 | -0.00/-0.00 | -0.00/-0.00 | -0.00/-0.00 | -0.00/-0.00 | -0.00/-0.00 | -0.00/0.00 | -0.01/-0.01 | -0.04/-0.04 |
| LD | 0.00/-0.00 | 0.00/-0.00 | -0.00/-0.00 | -0.00/0.00 | -0.00/-0.00 | -0.02/-0.01 | 0.00/0.00 | -0.00/-0.00 | -0.01/-0.01 |
Bias on the PSI as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1)
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | 0.09/0.09 | 0.09/0.09 | 0.09/0.10 | 0.13/0.13 | 0.13/0.13 | 0.13/0.13 | 0.13/0.09 | 0.13/0.09 | 0.12/0.09 |
| PMS-R | 0.06/0.06 | 0.06/0.06 | 0.06/0.06 | 0.08/0.08 | 0.08/0.08 | 0.08/0.08 | 0.07/0.06 | 0.07/0.06 | 0.06/0.06 |
| IMS | -0.05/-0.05 | -0.05/-0.05 | -0.05/-0.05 | -0.09/-0.09 | -0.10/-0.09 | -0.10/-0.10 | -0.14/-0.05 | -0.14/-0.05 | -0.16/-0.05 |
| IMS-R | -0.06/-0.06 | -0.06/-0.06 | -0.06/-0.06 | -0.12/-0.12 | -0.12/-0.12 | -0.12/-0.12 | -0.17/-0.06 | -0.17/-0.06 | -0.18/-0.06 |
| CIM | 0.09/0.08 | 0.09/0.09 | 0.09/0.09 | 0.12/0.12 | 0.12/0.12 | 0.12/0.12 | 0.12/0.08 | 0.12/0.09 | 0.12/0.09 |
| CIM-R | 0.05/0.05 | 0.05/0.05 | 0.06/0.05 | 0.07/0.06 | 0.08/0.06 | 0.08/0.07 | 0.06/0.05 | 0.06/0.05 | 0.06/0.05 |
| ICS | 0.05/0.05 | 0.05/0.05 | 0.05/0.05 | 0.07/0.07 | 0.07/0.07 | 0.07/0.07 | 0.05/0.05 | 0.05/0.05 | 0.04/0.05 |
| LOG | 0.02/0.02 | 0.02/0.02 | 0.02/0.02 | -0.00/0.00 | -0.00/0.00 | -0.01/-0.01 | -0.05/0.02 | -0.06/0.02 | -0.08/0.02 |
| LOG-R | -0.02/-0.02 | -0.02/-0.02 | -0.02/-0.02 | -0.06/-0.06 | -0.06/-0.06 | -0.07/-0.05 | -0.11/-0.02 | -0.11/-0.02 | -0.13/-0.02 |
| MOK | 0.05/0.05 | 0.05/0.05 | 0.04/0.04 | 0.06/0.07 | 0.06/0.06 | 0.06/0.06 | 0.05/0.05 | 0.05/0.05 | 0.04/0.04 |
| RAS | 0.05/0.05 | 0.05/0.05 | 0.05/0.05 | 0.07/0.07 | 0.07/0.07 | 0.07/0.07 | 0.05/0.06 | 0.05/0.06 | 0.04/0.06 |
| RAS-R | 0.01/0.01 | 0.01/0.01 | 0.01/0.01 | -0.00/0.00 | 0.00/0.00 | 0.00/0.00 | -0.03/0.01 | -0.03/0.01 | -0.03/0.01 |
| RAI | 0.05/0.01 | 0.05/0.06 | 0.05/0.06 | 0.12/0.12 | 0.12/0.12 | 0.12/0.12 | 0.13/0.06 | 0.12/0.06 | 0.12/0.06 |
| WORST | -0.06/-0.06 | -0.04/-0.04 | -0.01/-0.01 | -0.13/-0.12 | -0.09/-0.09 | -0.05/-0.05 | -0.19/-0.06 | -0.16/-0.04 | -0.12/-0.01 |
| NOIMP | -0.03/-0.03 | -0.03/-0.03 | -0.03/-0.03 | -0.06/-0.06 | -0.07/-0.06 | -0.07/-0.06 | -0.10/-0.03 | -0.10/-0.03 | -0.11/-0.03 |
| LD | -0.00/-0.00 | -0.00/-0.00 | -0.01/-0.00 | -0.00/-0.00 | -0.01/-0.01 | -0.03/-0.02 | -0.01/-0.00 | -0.02/-0.00 | -0.07/-0.01 |
Bias on the v parameter as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1)
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | -0.04/-0.08 | -0.04/-0.08 | -0.03/-0.07 | -0.04/-0.13 | -0.04/-0.13 | -0.05/-0.14 | -0.05/-0.15 | -0.08/-0.18 | -0.11/-0.22 |
| PMS-R | 0.00/-0.03 | -0.00/-0.03 | -0.00/-0.03 | 0.00/-0.06 | -0.00/-0.07 | -0.03/-0.09 | -0.00/-0.09 | -0.03/-0.12 | -0.07/-0.16 |
| IMS | 0.00/0.04 | -0.03/0.02 | -0.05/-0.00 | 0.00/0.08 | -0.05/0.04 | -0.12/-0.03 | -0.00/0.13 | -0.09/0.04 | -0.19/-0.06 |
| IMS-R | 0.00/0.00 | -0.02/-0.02 | -0.04/-0.04 | 0.00/-0.00 | -0.03/-0.03 | -0.08/-0.08 | -0.00/0.00 | -0.06/-0.05 | -0.13/-0.13 |
| CIM | 0.04/0.04 | 0.03/0.03 | 0.04/0.04 | 0.06/0.06 | 0.06/0.06 | 0.04/0.04 | 0.07/0.09 | 0.03/0.05 | -0.00/0.00 |
| CIM-R | 0.02/0.04 | 0.01/0.03 | 0.01/0.04 | 0.03/0.01 | 0.01/0.00 | 0.01/-0.02 | 0.03/0.02 | -0.01/-0.02 | -0.05/-0.07 |
| ICS | 0.00/-0.02 | -0.00/-0.03 | -0.00/-0.03 | 0.00/-0.06 | -0.01/-0.05 | -0.03/-0.07 | -0.00/-0.06 | -0.03/-0.10 | -0.07/-0.14 |
| LOG | 0.00/0.03 | -0.02/0.01 | -0.03/-0.01 | 0.00/0.05 | -0.04/0.01 | -0.11/-0.05 | -0.00/0.09 | -0.08/0.01 | -0.19/-0.10 |
| LOG-R | 0.00/-0.00 | -0.02/-0.01 | -0.03/-0.03 | 0.00/-0.00 | -0.03/-0.03 | -0.08/-0.08 | -0.00/0.00 | -0.06/-0.06 | -0.14/-0.13 |
| MOK | -0.01/0.01 | -0.02/0.00 | -0.03/-0.00 | -0.02/0.02 | -0.04/0.01 | -0.08/-0.02 | -0.03/0.05 | -0.08/0.00 | -0.13/-0.05 |
| RAS | 0.00/-0.06 | -0.00/-0.06 | 0.01/-0.06 | 0.00/-0.12 | -0.00/-0.11 | -0.00/-0.12 | -0.00/-0.17 | -0.01/-0.18 | -0.02/-0.20 |
| RAS-R | 0.00/-0.04 | -0.01/-0.05 | -0.01/-0.05 | 0.00/-0.08 | 0.01/-0.09 | -0.03/-0.11 | -0.00/-0.12 | -0.03/-0.14 | -0.06/-0.17 |
| RAI | 0.00/-0.06 | -0.00/-0.06 | 0.00/-0.06 | 0.00/-0.06 | 0.00/-0.06 | -0.00/-0.07 | -0.00/-0.08 | -0.02/-0.11 | -0.05/-0.15 |
| WORST | 0.23/0.23 | 0.22/0.20 | 0.21/0.19 | 0.38/0.36 | 0.36/0.34 | 0.33/0.31 | 0.45/0.44 | 0.41/0.40 | 0.36/0.35 |
| NOIMP | 0.00/0.00 | -0.01/-0.01 | -0.02/-0.02 | 0.00/-0.00 | -0.02/-0.02 | -0.06/-0.06 | -0.00/0.00 | -0.05/-0.04 | -0.11/-0.11 |
| LD | 0.00/-0.00 | -0.10/-0.08 | -0.21/-0.19 | 0.00/-0.00 | -0.20/-0.19 | -0.45/-0.42 | -0.00/-0.00 | -0.31/-0.29 | -0.70/-0.67 |
| FC | 0.00/-0.00 | 0.00/-0.00 | -0.00/0.00 | -0.00/-0.00 | -0.00/0.00 | 0.00/0.00 | -0.00/0.00 | -0.00/0.00 | 0.00/0.00 |
Bias on the variance of the δparameters as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1)
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | -0.05/-0.07 | -0.05/-0.07 | -0.06/-0.08 | -0.09/-0.10 | -0.09/-0.10 | -0.09/-0.11 | -0.10/-0.12 | -0.10/-0.11 | -0.09/-0.09 |
| PMS-R | -0.08/-0.08 | -0.08/-0.08 | -0.08/-0.08 | -0.13/-0.13 | -0.13/-0.13 | -0.13/-0.13 | -0.16/-0.15 | -0.15/-0.14 | -0.15/-0.13 |
| IMS | 0.20/0.21 | 0.20/0.21 | 0.20/0.20 | 0.37/0.41 | 0.38/0.39 | 0.40/0.39 | 0.47/0.56 | 0.49/0.53 | 0.55/0.54 |
| IMS-R | -0.03/-0.03 | -0.03/-0.03 | -0.03/-0.03 | -0.05/-0.05 | -0.05/-0.05 | -0.04/-0.05 | -0.06/-0.07 | -0.06/-0.07 | -0.03/-0.06 |
| CIM | 0.10/0.13 | 0.10/0.13 | 0.09/0.12 | 0.20/0.27 | 0.20/0.25 | 0.18/0.23 | 0.28/0.39 | 0.26/0.36 | 0.24/0.31 |
| CIM-R | 0.03/-0.03 | 0.02/-0.03 | 0.02/-0.02 | 0.05/0.06 | 0.05/0.05 | 0.03/0.03 | 0.07/0.07 | 0.06/0.06 | 0.06/0.04 |
| ICS | -0.06/-0.06 | -0.06/-0.06 | -0.06/-0.06 | -0.10/-0.09 | -0.09/-0.09 | -0.10/-0.09 | -0.11/-0.11 | -0.11/-0.10 | -0.11/-0.10 |
| LOG | 0.16/0.16 | 0.16/0.16 | 0.16/0.15 | 0.28/0.31 | 0.29/0.29 | 0.30/0.28 | 0.38/0.43 | 0.40/0.40 | 0.44/0.37 |
| LOG-R | -0.00/-0.00 | -0.00/-0.00 | -0.00/-0.00 | -0.02/-0.01 | -0.01/-0.02 | -0.01/-0.02 | -0.03/-0.03 | -0.02/-0.03 | 0.00/-0.03 |
| MOK | 0.16/0.16 | 0.16/0.16 | 0.16/0.16 | 0.30/0.32 | 0.31/0.31 | 0.31/0.30 | 0.40/0.43 | 0.41/0.42 | 0.43/0.40 |
| RAS | -0.22/-0.21 | -0.23/-0.22 | -0.22/-0.21 | -0.34/-0.31 | -0.34/-0.31 | -0.34/-0.30 | -0.39/-0.33 | -0.39/-0.32 | -0.40/-0.30 |
| RAS-R | -0.18/-0.18 | -0.18/-0.17 | -0.18/-0.17 | -0.28/-0.26 | -0.28/-0.26 | -0.28/-0.25 | -0.33/-0.30 | -0.32/-0.29 | -0.32/-0.27 |
| RAI | -0.22/-0.21 | -0.22/-0.21 | -0.22/-0.22 | -0.19/-0.23 | -0.19/-0.22 | -0.20/-0.22 | -0.19/-0.21 | -0.19/-0.21 | -0.20/-0.19 |
| WORST | -0.01/0.08 | -0.01/0.07 | -0.01/0.08 | 0.11/0.26 | 0.09/0.25 | 0.06/0.22 | 0.20/0.43 | 0.13/0.37 | 0.06/0.30 |
| NOIMP | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.01/0.01 | 0.01/0.00 | 0.01/0.00 | 0.01/0.00 | 0.03/0.00 |
| LD | 0.00/0.00 | 0.02/0.02 | 0.09/0.08 | 0.00/0.00 | 0.09/0.08 | 0.42/0.37 | 0.01/0.02 | 0.21/0.19 | 0.98/0.92 |
| FC | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/0.00 | 0.00/-0.00 |
Bias on the σ2 parameters as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1)
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | 0.61/0.58 | 0.61/0.58 | 0.62/0.57 | 1.27/1.14 | 1.27/1.14 | 1.26/1.11 | 1.64/1.58 | 1.59/1.57 | 1.56/1.50 |
| PMS-R | 0.34/0.35 | 0.34/0.35 | 0.34/0.34 | 0.62/0.64 | 0.62/0.62 | 0.61/0.62 | 0.85/0.86 | 0.82/0.86 | 0.79/0.81 |
| IMS | -0.15/-0.14 | -0.15/-0.15 | -0.15/-0.16 | -0.24/-0.24 | -0.24/-0.24 | -0.27/-0.27 | -0.28/-0.29 | -0.30/-0.29 | -0.34/-0.32 |
| IMS-R | -0.23/-0.22 | -0.23/-0.23 | -0.22/-0.23 | -0.38/-0.38 | -0.37/-0.38 | -0.38/-0.39 | -0.45/-0.47 | -0.46/-0.46 | -0.46/-0.48 |
| CIM | 0.59/0.57 | 0.60/0.58 | 0.62/0.58 | 1.15/1.09 | 1.17/1.13 | 1.20/1.14 | 1.54/1.48 | 1.55/1.56 | 1.55/1.60 |
| CIM-R | 0.32/0.28 | 0.33/0.29 | 0.35/0.30 | 0.59/0.50 | 0.61/0.52 | 0.62/0.52 | 0.80/0.64 | 0.78/0.66 | 0.78/0.65 |
| ICS | 0.32/0.33 | 0.32/0.33 | 0.33/0.33 | 0.57/0.59 | 0.57/0.61 | 0.56/0.57 | 0.76/0.77 | 0.74/0.78 | 0.71/0.74 |
| LOG | 0.19/0.20 | 0.19/0.20 | 0.18/0.18 | 0.22/0.22 | 0.22/0.24 | 0.16/0.19 | 0.18/0.16 | 0.13/0.18 | 0.02/0.07 |
| LOG-R | -0.03/-0.13 | -0.03/-0.03 | -0.03/-0.04 | -0.12/-0.12 | -0.13/-0.12 | -0.15/-0.15 | -0.20/-0.23 | -0.22/-0.22 | -0.27/-0.29 |
| MOK | 0.30/0.31 | 0.30/0.31 | 0.30/0.29 | 0.54/0.56 | 0.55/0.57 | 0.54/0.55 | 0.75/0.74 | 0.72/0.76 | 0.69/0.73 |
| RAS | 0.26/0.28 | 0.26/0.28 | 0.28/0.27 | 0.49/0.50 | 0.49/0.53 | 0.49/0.53 | 0.65/0.67 | 0.62/0.70 | 0.60/0.70 |
| RAS-R | 0.04/0.05 | 0.04/0.05 | 0.05/0.04 | 0.06/0.07 | 0.07/0.09 | 0.07/0.09 | 0.10/0.09 | 0.08/0.10 | 0.07/0.09 |
| RAI | 0.29/0.31 | 0.29/0.31 | 0.30/0.30 | 1.12/0.92 | 1.12/0.95 | 1.11/0.95 | 1.53/1.40 | 1.49/1.42 | 1.46/1.41 |
| WORST | -0.25/-0.21 | -0.16/-0.13 | -0.04/-0.03 | -0.42/-0.27 | -0.30/-0.25 | -0.15/-0.11 | -0.50/-0.47 | -0.42/-0.36 | -0.28/-0.14 |
| NOIMP | 0.01/0.02 | 0.01/0.02 | 0.02/0.02 | 0.00/0.01 | 0.01/0.02 | 0.00/-0.00 | 0.02/0.00 | -0.00/0.01 | -0.01/-0.01 |
| LD | 0.01/0.02 | 0.02/0.02 | -0.00/-0.01 | 0.02/0.02 | 0.01/0.02 | -0.05/-0.04 | 0.03/0.03 | -0.02/0.02 | -0.14/-0.12 |
| FC | 0.01/0.01 | 0.01/0.01 | 0.02/0.01 | 0.00/0.00 | 0.01/0.02 | 0.01/0.01 | 0.01/0.00 | 0.00/0.01 | 0.01/0.01 |
Rate of rejection of the Rasch model assumption with the Q1 test as a function of the rate of missing data per item (π), the value of the correlation coefficient ρ between the latent variable Θ and the propensity to have missing data ξ for each method for handling missing data (results for w = 0/w = 1) [*: values significantly different of 5%]
| Method | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| PMS | 5.2/6.5 | 5.2/6.6* | 4.9/6.3* | 5.7/9.2* | 5.9/9.7* | 6.2/8.1* | 4.6/22.3* | 6.3/17.6* | 6.2/18.5* |
| PMS-R | 5.6/5.2 | 6.0/5.6 | 4.0/4.7 | 3.9/8.0* | 4.3/6.4 | 6.2/6.0 | 5.2/8.5* | 5.9/8.3* | 6.7*/8.2* |
| IMS | 5.6/3.9 | 5.4/4.6 | 6.0/5.8 | 4.5/4.6 | 6.3/4.4 | 6.1/5.3 | 3.9/4.5 | 3.9/5.0 | 6.1/5.8 |
| IMS-R | 6.0/6.0 | 6.0/6.1 | 4.5/5.0 | 6.2/6.7* | 4.4/5.7 | 4.9/5.1 | 4.7/7.4* | 5.9/5.5 | 4.3/6.8 |
| CIM | 11.4*/9.7* | 8.5*/9.3* | 9.0*/8.2* | 19.6*/19.5* | 15.5*/18.5* | 14.2*/19.1* | 22.9*/29.0* | 22.2*/28.8* | 23.6*/32.7* |
| CIM-R | 5.9/3.7 | 4.9/4.4 | 5.2/4.4 | 6.9*/4.4 | 6.9*/5.6 | 6.6*/4.5 | 6.9*/5.5 | 6.8/4.9 | 8.0*/6.3 |
| ICS | 49.6*/54.8* | 51.5*/55.2* | 51.7*/54.0* | 85.0*/87.9* | 86.0*/88.6* | 85.0*/89.0* | 94.1*/97.6* | 93.7*/96.5* | 95.6*/97.7* |
| LOG | 33.0*/37.3* | 34.9*/34.6* | 35.8*/37.2* | 64.2*/63.6* | 63.2*/67.4* | 61.5*/65.9* | 65.5*/65.6* | 63.2*/68.1* | 60.4*/66.9* |
| LOG-R | 10.6*/12.6* | 13.1*/11.1* | 11.9*/11.6* | 19.1*/19.8* | 19.5*/18.7* | 17.7*/19.0* | 22.2*/26.4* | 24.5*/24.8* | 22.6*/24.0* |
| MOK | 16.1*/17.3* | 17.9*/18.6* | 19.2*/19.4* | 42.2*/51.3* | 44.3*/54.2* | 49.4*/56.9* | 58.5*/72.4* | 60.2*/75.0* | 67.8*/82.0* |
| RAS | 21.8*/23.8* | 22.8*/24.3* | 21.5*/26.1* | 61.2*/69.9* | 63.9*/67.6* | 64.2*/67.5* | 80.6*/87.7* | 83.3*/88.7* | 81.0*/86.3* |
| RAS-R | 4.7/4.9 | 5.9/5.3 | 6.2/6.2 | 6.0/6.2 | 6.9*/6.9* | 7.3*/6.0 | 6.6*/6.6* | 6.7*/16.9* | 6.8*/5.7 |
| RAI | 21.9*/24.3* | 22.9*/24.3* | 22.6*/27.5* | 17.8*/45.0* | 19.6*/40.2* | 18.3*/36.9* | 10.1*/61.0* | 14.1*/52.5* | 15.4*/45.0* |
| WORST | 6.8*/5.5 | 6.1/5.8* | 5.1/3.2* | 6.7*/6.9* | 6.2/4.4 | 5.0/4.8 | 10.0*/6.9* | 9.2*/5.8 | 8.0*/4.0 |
| NOIMP | 6.5/7.8* | 7.5*/8.2* | 6.9*/7.6* | 9.2*/9.7* | 11.0*/10.9* | 10.2*/9.4* | 13.3*/14.8* | 13.8*/14.0* | 9.6*/9.5* |
| LD | 4.9/5.1 | 4.0/5.2 | 5.1/4.9 | 4.8/5.2 | 5.1/5.0 | 4.3/4.4 | 3.4*/3.3* | 3.4*/4.5 | 3.3*/2.5* |
| FC | 5.2/5.5 | 4.8/4.4 | 5.1/5.0 | 5.4/4.6 | 4.1/3.9 | 4.9/4.9 | 4.0/4.8 | 4.7/4.5 | 4.9/3.8* |