| Literature DB >> 35528344 |
Zheng He1,2, Genda Wang1, Huihua Chen1, Hongyan Yan2.
Abstract
Establishing resilient transport infrastructure is an effective way for cities to deal with external disturbances and uncertainties during rapid urbanization. However, human society is presently facing a series of sustainable development obstacles, where the energy shortage and environmental pollution are catching significant concerns. Hence, it is imperative to investigate the carbon emission of the growing number of resilient transportation infrastructure (RTI) projects. Through extracting the carbon emission factor (CEF), this study built the carbon emission measurement model (CEMM) to evaluate the carbon emission of 26 resilient high-speed railway construction projects in China. The results indicated that the carbon emissions of the entire high-speed railway infrastructure projects in China show regional and social environmental differences. Meanwhile, there are potential correlations and positive relationships between the resilience of the high-speed railway infrastructure projects and their carbon emission. Suggestions and recommendations for governments and construction enterprises are put forward to further improve the resilient and low-carbon development of transportation infrastructure in China.Entities:
Mesh:
Substances:
Year: 2022 PMID: 35528344 PMCID: PMC9071950 DOI: 10.1155/2022/3138413
Source DB: PubMed Journal: Comput Intell Neurosci
Carbon emission factor from the literature.
| Factor | Unit | CEF | Production processes | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Fossil energy mining | Raw material acquisition | Raw material transportation | Processed into lumber | Building materials transportation | Regeneration treatment | Source of data | |||
| Sand | m3 | 72.5 | ✓ | ✓ | ✓ | [ | |||
| Stone | m3 | 31.2 | ✓ | ✓ | ✓ | [ | |||
| Fly ash | kg | 0.0015 | ✓ | ✓ | ✓ | [ | |||
| Bentonite | kg | 0.041 | ✓ | ✓ | ✓ | [ | |||
| Mineral powder | kg | 0.05692 | ✓ | ✓ | ✓ | [ | |||
| 32.5#cement | t | 677.68 | ✓ | ✓ | ✓ | ✓ | [ | ||
| 42.5# cement | t | 920.03 | ✓ | ✓ | ✓ | ✓ | [ | ||
| 52.5# cement | t | 1,041.56 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C20 concrete | m3 | 239.19 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C25 concrete | m3 | 289.44 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C30 concrete | m3 | 346.95 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C35 concrete | m3 | 382.11 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C40 concrete | m3 | 432.29 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C50 concrete | m3 | 563.89 | ✓ | ✓ | ✓ | ✓ | [ | ||
| C60 concrete | m3 | 644.85 | ✓ | ✓ | ✓ | ✓ | [ | ||
| 1:1 cement mortar | m3 | 730.20 | ✓ | ✓ | ✓ | [ | |||
| 1:2 cement mortar | m3 | 531.52 | ✓ | ✓ | ✓ | [ | |||
| 1:2.5 cement mortar | m3 | 469.41 | ✓ | ✓ | ✓ | [ | |||
| 1:3 cement mortar | m3 | 393.65 | ✓ | ✓ | ✓ | [ | |||
| Large steel | kg | 1.72 | ✓ | ✓ | ✓ | ✓ | [ | ||
| Small and medium steel | kg | 1.38 | ✓ | ✓ | ✓ | ✓ | [ | ||
| Hot rolled steel bar | kg | 2.21 | ✓ | ✓ | ✓ | ✓ | [ | ||
| Cold rolled steel bar | kg | 2.76 | ✓ | ✓ | ✓ | ✓ | [ | ||
| Iron product | kg | 1.53 | ✓ | ✓ | ✓ | ✓ | [ | ||
| Wood | m3 | 144.5 | ✓ | ✓ | ✓ | [ | |||
| Waterproof coating | kg | 1.21 | ✓ | ✓ | ✓ | ✓ | ✓ | [ | |
| 1.01 | ✓ | ✓ | ✓ | ✓ | [ | ||||
| 0.89 | ✓ | ✓ | ✓ | [ | |||||
| Modified asphalt waterproof materials | m2 | 4.28 | ✓ | ✓ | ✓ | ✓ | ✓ | [ | |
| 4.01 | ✓ | ✓ | ✓ | ✓ | [ | ||||
| PVC waterproof board | kg | 8.69 | ✓ | ✓ | ✓ | [ | |||
| Rubber waterstop | kg | 0.5 | ✓ | ✓ | ✓ | [ | |||
Fossil energy CEF.
| Fossil energy | Net calorific value | Carbon content | Carbon dioxide factor (%) | Unit | CEF |
|---|---|---|---|---|---|
| Raw coal | 20,908 | 25.8 | 100 | kg | 1.978 |
| Washed coal | 26,344 | 25.8 | 100 | kg | 2.492 |
| Coke | 28,435 | 29.2 | 100 | kg | 3.044 |
| Crude | 41,816 | 20.0 | 100 | kg | 3.067 |
| Kerosene | 43,070 | 19.5 | 100 | kg | 3.080 |
| Gasoline | 43,070 | 18.9 | 100 | kg | 2.985 |
| Diesel fuel | 42,652 | 20.2 | 100 | kg | 3.159 |
| Liquefied petroleum gas | 50,179 | 17.2 | 100 | kg | 3.165 |
| Natural gas | 38,931 | 15.3 | 100 | m3 | 1.996 |
| Coke oven gas | 16,726 | 12.1 | 100 | m3 | 0.770 |
Fossil energy CEF.
| Region | OM electricity CEF | BM electricity CEF |
|---|---|---|
| North China power grid | 0.9419 | 0.4819 |
| Northeast power grid | 1.0826 | 0.2399 |
| Northwest power grid | 0.8922 | 0.4407 |
| East China power grid | 0.7921 | 0.3870 |
| Central China power grid | 0.8587 | 0.2854 |
| China southern power grid | 0.8042 | 0.2135 |
Silicon-containing materials CEF.
| Silicon-containing materials | Bulk density (kg/m3) | CEF (kg CO2/m3) | CEF (kg CO2/kg) |
|---|---|---|---|
| Stone | 1,560 | 31.2 | 0.02 |
| Sand | 1,450 | 72.5 | 0.05 |
Cement materials CEF.
| CEF | Raw material production stage | Raw material transportation stage | Cement production and processing stage | Total |
|---|---|---|---|---|
| P.S.32.5 | 517.100 | 40.498 | 244.661 | 802.259 |
| P.O.42.5 | 729.200 | 44.211 | 330.296 | 1,103.707 |
| P.I.52.5 | 835.550 | 46.092 | 373.232 | 1,254.874 |
Consumption of raw materials for concrete production.
| Materials | C20 | C25 | C30 | C35 | C40 | C50 | C60 |
|---|---|---|---|---|---|---|---|
| Cement | 135 | 170 | 210 | 235 | 270 | 320 | 370 |
| Fly ash | 70 | 70 | 70 | 75 | 80 | 80 | 80 |
| Mineral powder | 80 | 80 | 80 | 80 | 80 | 80 | 90 |
| Sand | 843 | 825 | 805 | 755 | 732 | 723 | 682 |
| Stone | 1,020 | 1,020 | 1,020 | 1,020 | 1,020 | 1,025 | 1,000 |
| Water | 185 | 185 | 180 | 180 | 180 | 165 | 170 |
| Admixture | 1.18 | 1.38 | 3.64 | 4.1 | 4.9 | 7 | 8.3 |
Concrete raw material CEF.
| Raw materials | 42.5# cement | 52.5# cement | Admixture | Stone | Sand | Water | Mineral powder | Fly ash |
|---|---|---|---|---|---|---|---|---|
| CEF | 1.104 | 1.255 | 0.02849 | 0.02 | 0.05 | 0.00091 | 0.05692 | 0.0015 |
Concrete material CEF.
| CEF | C20 | C25 | C30 | C35 | C40 | C50 | C60 |
|---|---|---|---|---|---|---|---|
| Raw material production | 184.051 | 213.396 | 247.016 | 266.137 | 295.257 | 375.593 | 422.704 |
| Raw material transportation stage | 119.431 | 120.574 | 121.928 | 120.721 | 121.632 | 124.516 | 123.928 |
| Concrete production and processing stage | 2.710154 | 2.710154 | 2.710154 | 2.710154 | 2.710154 | 2.710154 | 2.710154 |
| Total | 306.192 | 336.680 | 371.654 | 389.568 | 419.599 | 502.819 | 549.342 |
Concrete material CEF.
| CEF | 1:1 cement mortar | 1:2 cement mortar | 1:2.5 cement mortar | 1:3 cement mortar |
|---|---|---|---|---|
| Raw material production | 712.694 | 514.127 | 457.936 | 409.636 |
| Raw material transportation stage | 115.086 | 120.303 | 121.803 | 121.274 |
| Mortar production and processing stage | 1.608 | 1.608 | 1.608 | 1.608 |
| Total | 829.388 | 636.038 | 581.347 | 532.518 |
Steel material CEF.
| Steel type | CEF | Categories |
|---|---|---|
| Large steel | 3,612.011 | Section steel, I-beam |
| Small and medium steel | 2,895.229 | Channel steel, angle steel, steel plate, steel support, steel formwork, steel support |
| Hot rolled steel bar | 3,041.139 | Rebar, round steel |
| Cold rolled steel bar | 3,786.384 | Cold drawn steel wire |
Wood material CEF.
| Production process | Log harvesting | Log transportation | Timber processing |
|---|---|---|---|
| Energy | Gasoline | Diesel fuel | Electricity |
| Number | 16.487 (kg/m3) | 4.844 (kg/m3) | 70.142 (kWh/m3) |
| CEF (kg/CO2) | 2.985 | 3.159 | 0.8042 |
| CEF (m3/CO2) | 49.214 | 15.302 | 56.408 |
Construction materials CEF of the high-speed railway project.
| Types | Materials | Unit | CEF |
|---|---|---|---|
| Nonturnover material | Stone | m3 | 31.2 |
| Sand | m3 | 72.5 | |
| Bentonite | kg | 0.041 | |
| Mineral powder | kg | 0.05692 | |
| Fly ash | kg | 0.0015 | |
| 32.5#cement | t | 802.259 | |
| 42.5# cement | t | 1,103.707 | |
| 52.5# cement | t | 1,254.874 | |
| C20 concrete | m3 | 306.192 | |
| C25 concrete | m3 | 336.680 | |
| C30 concrete | m3 | 371.654 | |
| C35 concrete | m3 | 389.568 | |
| C40 concrete | m3 | 419.599 | |
| C50 concrete | m3 | 502.819 | |
| C60 concrete | m3 | 549.342 | |
| 1:1 cement mortar | m3 | 829.388 | |
| 1:2 cement mortar | m3 | 636.038 | |
| 1:2.5 cement mortar | m3 | 581.347 | |
| 1:3 cement mortar | m3 | 532.518 | |
| Large steel | t | 3,612.011 | |
| Small and medium steel | t | 2,895.229 | |
| Hot rolled steel bar | t | 3,041.139 | |
| Cold rolled steel bar | t | 3,786.384 | |
| Iron product | t | 2,084.565 | |
| Wood | m3 | 120.924 | |
| Waterproof coating | kg | 0.89 | |
| Modified asphalt | m2 | 3.53 | |
| Waterproof materials | m2 | 19.553 | |
| PVC waterproof board | m | 4.608 | |
| Reusable materials | Rubber water stop | t | 1,331.805 |
| Turnover steel | m3 | 12.092 |
Facility CEF of the high-speed railway project.
| Types | Construction equipment | Energy consumption | CEF | ||
|---|---|---|---|---|---|
| Gasoline (kg) | Diesel fuel (kg) | Electricity (kWh) | |||
| Earthwork machinery | Crawler hydraulic single bucket excavator ≤0.4 m3 | — | 35.48 | — | 112.08 |
| Crawler hydraulic single bucket excavator ≤0.6 m3 | — | 44.08 | — | 139.25 | |
| Crawler hydraulic single bucket excavator ≤1 m3 | — | 62.90 | — | 198.70 | |
| Crawler bulldozer ≤75 kW | — | 49.73 | — | 157.10 | |
| Crawler bulldozer ≤300 kW | — | 197.57 | — | 624.12 | |
| Self-propelled vibratory roller ≤12 t | — | 75.00 | — | 236.93 | |
| Frog ram ≤700 Nm | — | — | 20.40 | 16.41 | |
| Wheel loader ≤2 m3 | — | 56.45 | — | 178.33 | |
|
| |||||
| Lifting machinery | Truck crane ≤8 t | — | 35.28 | — | 111.45 |
| Truck crane ≤16 t | — | 57.15 | — | 180.54 | |
| Gantry crane ≤10 t–22 m | — | — | 61.44 | 49.41 | |
| Gantry crane ≤20 t–22 m | — | — | 109.44 | 88.01 | |
| Gantry crane ≤50 t–40 m | — | — | 176.64 | 142.05 | |
| Crawler crane ≤10 t | — | 31.75 | — | 100.30 | |
| Crawler crane ≤15 t | — | 38.81 | — | 122.60 | |
| Crawler crane ≤40 t | — | 47.63 | — | 150.46 | |
| Crawler crane ≤250 t | — | 352.80 | — | 1,114.50 | |
| Single drum slow speed winch ≤30 kN | — | — | 38.40 | 30.88 | |
| Single drum slow speed winch ≤50 kN | — | — | 56.32 | 45.29 | |
|
| |||||
| Transportation machinery | Dump truck ≤4 t | — | 34.27 | — | 108.26 |
| Dump truck ≤8 t | — | 47.58 | — | 150.31 | |
| Dump truck ≤12 t | — | 61.29 | — | 193.62 | |
| Truck ≤4 t | 26.61 | — | — | 79.43 | |
| Truck ≤6 t | 34.56 | — | — | 103.16 | |
| Sprinkler ≤5,000 L | 34.56 | — | — | 103.16 | |
| Small transport vehicle ≤1 t | — | 7.26 | — | 22.93 | |
| Belt conveyor ≤10 m | — | — | 15.36 | 12.35 | |
| Concrete mixing truck ≤6 m3 | — | 88.70 | — | 280.20 | |
| Concrete mixing truck ≤8 m3 | — | 100.80 | — | 318.43 | |
| Concrete mixing truck ≤10 m3 | — | 106.85 | — | 337.54 | |
|
| |||||
| Concrete and mortar machinery | Concrete mixer ≤250 L | — | — | 15.68 | 12.61 |
| Concrete mixer ≤400 L | — | — | 21.56 | 17.34 | |
| Concrete mixer ≤800 L | — | — | 86.24 | 69.35 | |
| Concrete mixing station ≤60 m3/h | — | — | 636.16 | 511.60 | |
| Concrete mixing station ≤100 m3/h | — | — | 913.92 | 734.97 | |
| Concrete mixing station ≤120 m3/h | — | — | 1,008.00 | 810.63 | |
| Concrete plug-in vibrator | — | — | 5.38 | 4.33 | |
| Concrete attached vibrator | — | — | 6.72 | 5.40 | |
| Suspended pulp lifting and leveling machine | — | — | 105.28 | 84.67 | |
| Concrete wet spraying machine ≤5 m3/h | — | — | 24.64 | 19.82 | |
| Hydraulic grouting pump ≤50 L/min | — | — | 30.80 | 24.77 | |
| Concrete pump ≤60 m3/h | — | — | 492.80 | 396.31 | |
| Concrete pump truck ≤90 m3/h | — | 61.74 | — | 195.04 | |
| Concrete placing machine ≤21 m | — | — | 21.84 | 17.56 | |
| Mortar mixer ≤200 L | — | — | 13.44 | 10.81 | |
| Mortar mixer ≤400 L | — | — | 20.16 | 16.21 | |
| Prestressed steel bar hydraulic tensioning equipment ≤1,200 kN | — | — | 38.40 | 30.88 | |
| Foundation and pump machinery | Hydraulic vibration pile driver ≤320 t | — | 650.92 | — | 2,056.26 |
| Hydraulic static pile driver ≤1,200 kN | — | — | 138.60 | 111.46 | |
| Hydraulic static pile driver ≤1,600 kN | — | — | 189.00 | 151.99 | |
| Impact hole forming machine | — | — | 177.60 | 142.83 | |
| Crawler hydraulic grab grooving machine ≤1.2 m | — | 194.04 | — | 612.97 | |
| Dynamic compaction machinery ≤1,200 kNm | — | 56.70 | — | 179.12 | |
| Dynamic compaction machinery ≤2,000 kNm | — | 69.30 | — | 218.92 | |
| Single-stage centrifugal clean water pump ≤12.5 m3/h–20 m | — | — | 8.98 | 7.22 | |
| Single-stage centrifugal clean water pump ≤50 m3/h–38 m | — | — | 44.88 | 36.09 | |
| Multi-stage centrifugal clean water pump ≤85m³/h–180m | — | — | 224.40 | 180.46 | |
| Multi-stage centrifugal clean water pump ≤155 m3/h–185 m | — | — | 538.56 | 433.11 | |
| Sewage pump ≤90 m3/h–26 m | — | — | 89.76 | 72.18 | |
| Centrifugal mud pump ≤108 m3/h–21 m | — | — | 89.76 | 72.18 | |
| Mud water treatment centrifuge ≤100 m3/h | — | — | 326.40 | 262.49 | |
| Mud water separation equipment ≤1,500 m3/h | — | — | 1,836.00 | 1,476.51 | |
| Mud production cycle equipment ≤500 m3/h | — | — | 136.00 | 109.37 | |
|
| |||||
| Welding machinery | AC arc welding machine ≤42 kVA | — | — | 144.00 | 115.80 |
| DC arc welding machine ≤32 kW | — | — | 102.40 | 82.35 | |
| Butt welding machine ≤100 kVA | — | — | 288.00 | 231.61 | |
|
| |||||
| Pavement machinery | Track laying machine 25 m | — | 193.64 | — | 611.71 |
| Long rail laying unit for ballastless track 500 m | — | 94.25 | — | 297.74 | |
| Turnout tamping car | — | 298.17 | — | 941.92 | |
| Long rail line laying and rolling mill | — | 182.50 | — | 576.52 | |
| Bridge erecting machine ≤900 t | — | 642.03 | — | 2,028.17 | |
| Box beam transport vehicle ≤900 t | — | 913.92 | — | 2,887.07 | |
| Wheel-rail beam moving machine ≤900 t | — | 188.50 | — | 595.47 | |
| Wheel rail type beam lifting machine ≤2 × 450 t | — | 188.50 | — | 595.47 | |
| Rail slab reinforcement tensioning equipment | — | — | 105.60 | 84.92 | |
| Type I double-block sleeper concrete pouring production line | — | — | 384.00 | 308.81 | |
|
| |||||
| Processing and other machinery | Steel bar straightening machine, | — | — | 18.70 | 15.04 |
| Rebar cutting machine, | — | — | 33.32 | 26.80 | |
| Rebar bending machine, | — | — | 14.28 | 11.48 | |
| Woodworking circular saw machine, | — | — | 16.32 | 13.12 | |
| Jaw crusher, ≤250 × 400 | — | — | 81.60 | 65.62 | |
| Vertical drilling machine, | — | — | 8.98 | 7.22 | |
| Pipe cutting machine, | — | — | 13.60 | 10.94 | |
Categories of subprojects of section A of the HH project.
| No. | Categories | Projects | Numbers |
|---|---|---|---|
| 1 | Earthworks | Subgrades | 1.69 million m3 |
| 2 | Stations | 2.2 million m3 | |
| 3 | Bridges | Mega bridge | 3,517 m |
| 4 | Large bridge | 5,580 m | |
| 5 | Middle bridge | 557 m | |
| 6 | Small bridge | 49 m | |
| 7 | Culverts | 1,638 m | |
| 8 | Tunnels | 44,057 m | |
| 9 | Buildings | 14,404 m2 | |