Qingye Han1, Junjie Chang1, Guiwen Liu1, Heng Zhang1.
Abstract
The utilization of prefabricated components is taken as a potential way to reduce carbon emissions from the construction industry, and the prefabrication rate may be a factor that influences the mitigation efficiency. This study develops an assessment method to compare carbon emissions of a building in the construction stage when it is built with multiple different prefabrication rates. Firstly, two carbon sources (building materials and machineries) and three construction sub-phases (production of materials and components, transportation, and on-site construction) are determined to clarify the calculation boundary. Then, a carbon emission measurement model for prefabricated buildings in the construction stage is developed by using a process-based method. A dormitory building in Chongqing, China, is selected to conduct a case study to show the application of the provided model. The result shows that the carbon emission of prefabricated buildings is higher compared to that of traditional cast-in situ buildings. Moreover, the emission of prefabricated buildings decreased slightly with the increase in the prefabrication rate. A detailed discussion is followed to investigate the reason why the carbon emission does not decrease with the utilization of prefabricated units. Based on the discussion, some suggestions are given to improve the carbon emission reduction efficiency of prefabrication techniques.Entities:
Keywords: carbon emission; coefficient method; construction industry; construction stage; prefabrication rate
Mesh:
Substances:
Year: 2022 PMID: 35206554 PMCID: PMC8872307 DOI: 10.3390/ijerph19042366
Source DB: PubMed Journal: Int J Environ Res Public Health ISSN: 1660-4601 Impact factor: 3.390
Figure 1Three Phases of the Construction Stage.
Figure 2The Space Boundary of the Assessment.
Features of General Used Carbon Emission Assessment Methods.
| Methods | Merits | Demerits | Applications |
|---|---|---|---|
| Coefficient method | The factors and sources of carbon emission is clear, and the calculation formula is simple. | When the case changes, the processing capacity is not as good as the mass balance method. | It is widely used and the conclusion is authoritative. |
| Mass balance method | It can distinguish the difference between each equipment and natural emission source. | The process is extremely complex. | The authority is not enough, and the accuracy of results needs to be discussed. |
| Actual measurement method | This method has strong pertinence and high precision. | It is too difficult to collect data. | It is rarely used. |
Carbon Emission Factors of Major Materials and Energies.
| Carbon Sources | Carbon Emission Factors | Units | Carbon Sources | Carbon Emission Factors | Units |
|---|---|---|---|---|---|
| Electricity | 1.018 | kg/kw·h | Wood | 83.870 | kg/m3 |
| Diesel | 3.680 | kg/kg | Iron | 2.3 | kg/kg |
| Gasoline | 2.910 | kg/kg | Masonry Mortar | 218.14 | kg/t |
| Water | 0.414 | kg/m3 | Cement Mortar | 392.65 | kg/m3 |
| Steel | 0.367 | kg/kg | Cement | 0.698 | kg/kg |
| Concrete | 347.643 | kg/m3 | Standard Brick | 504 | kg/103 |
| Transportation | 0.117 | kg/km·t |
Features of the Case Building.
| Function | Building Category | Floors | Overall Floorage | Fire Protection Level |
|---|---|---|---|---|
| Dormitory | Public building | 6F on ground/1F underground | 15,707.68 m2 | II |
Figure 3The BIM Model of the Case Building.
The Matching of the Prefabricated rates and Components.
| NO. | Prefabricated Rates | Prefabricated Components |
|---|---|---|
| 1 | 0 | / |
| 2 | 22.86% | stairs, beams, and slabs |
| 3 | 32.69% | stairs, beams, slabs, columns, and shear walls |
| 4 | 46.98% | stairs, beams, slabs, columns, shear walls, and partition boards |
The Carbon Emission Results of the Case Building under Different Prefabrication Rates (Unit: kgCO2/m2).
| Three Phases | Prefabrication Rates | |||
|---|---|---|---|---|
| 0 | 22.86% | 32.69% | 46.98% | |
|
| – | 21.656 | 29.610 | 53.684 |
|
| 267.756 | 255.580 | 251.546 | 216.126 |
|
| 267.756 | 277.236 | 281.156 | 269.810 |
|
| – | 0.781 | 1.026 | 1.376 |
|
| 267.756 | 278.017 | 282.182 | 271.186 |
|
| – | 0.011 | 0.015 | 0.028 |
|
| 7.367 | 7.824 | 7.897 | 8.217 |
|
| 7.367 | 7.835 | 7.912 | 8.245 |
|
| – | – | – | – |
|
| 7.005 | 4.652 | 4.382 | 5.390 |
|
| 7.005 | 4.652 | 4.382 | 5.390 |
|
| 267.756 | 277.248 | 281.171 | 269.838 |
|
| 14.372 | 13.256 | 13.306 | 14.983 |
|
| 282.128 | 290.504 | 294.476 | 284.821 |
Real Engineering Quantities of Subdivisional Works (Prefabrication).
| Subdivisional Works |
| Unit | Subdivisional Works |
| Unit | |||
|---|---|---|---|---|---|---|---|---|
| Production | Concrete | Stair | 37.50 | m3 | Transportation | Stair | 37.50 | m3 |
| Beam | 626.66 | m3 | Beam | 626.66 | m3 | |||
| Slab | 264.32 | m3 | Slab | 264.32 | m3 | |||
| Steel | Stair | 3.46 | t | On-site | Stair | 37.50 | m3 | |
| Beam | 83.83 | t | Beam | 626.66 | m3 | |||
| Slab | 21.66 | t | Slab | 264.32 | m3 | |||
Quota Engineering Quantities of the Prefabricated Stair.
| NO. | Subdivisional Works |
| Unit |
|---|---|---|---|
| 1 | Concrete engineering | 10 | m3 |
| 2 | Steel engineering | 1 | t |
| 3 | Transportation of stairs | 10 | m3 |
| 4 | Installation of stairs | 10 | m3 |
The Material and Machinery Consumption of the First and Second Kinds of Subdivisional Works.
| The First Kind of Subdivisional Works | |||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
| Concrete | 10.100 | m3 | Portal crane (10 t) | 0.230 | Machine-team |
| Water | 14.780 | m3 | Diesel dumper (1 t) | 0.564 | Machine-team |
| – | – | – | Belt conveyer (15 m*0.5 m) | 0.221 | Machine-team |
| – | – | – | Concrete mixer (350 L) | 0.222 | Machine-team |
|
| |||||
|
|
|
|
|
|
|
| Steel | 1.020 | t | Steel bar straightener (14 mm) | 0.012 | Machine-team |
| Water | 0.290 | m3 | Steel bar cutter (40 mm) | 0.075 | Machine-team |
| – | – | – | Steel bar bender (40 mm) | 0.150 | Machine-team |
| – | – | – | Tributary arc welder (32 kV·A) | 0.373 | Machine-team |
| – | – | – | Butt welder (75 kV·A) | 0.068 | Machine-team |
| – | – | – | Electric welding machine (75 kV·A) | 0.069 | Machine-team |
| – | – | – | Welding rod drying box (450∗350∗450) | 0.042 | Machine-team |
The Material and Machinery Consumption of the Third and Fourth Kinds of Subdivisional Works.
| The Third Kind of Subdivisional Works | |||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
| Wood | 0.010 | m3 | Auto crane (5 t) | 0.522 | Machine-team |
| Steel wire rope | 0.320 | kg | Motor truck (8 t) | 3.813 | Machine-team |
|
| |||||
|
|
|
|
|
|
|
| Concrete | 0.160 | m3 | Crawler crane (15 t) | 0.073 | Machine-team |
| Cement Mortar | 0.120 | m3 | Wheel crane (20 t) | 0.022 | Machine-team |
| Wood | 0.015 | m3 | Concrete mixer (350 L) | 0.018 | Machine-team |
| Iron | 13.610 | kg | Mortar mixer (200 L) | 0.018 | Machine-team |
| Water | 4.420 | m3 | Tributary arc welder (32 kV·A) | 1.362 | Machine-team |
The Energy Consumption per Machine-team of Above Machineries.
| Machineries | Energies |
| Unit | Machineries | Energies |
| Unit |
|---|---|---|---|---|---|---|---|
| Portal crane (10 t) | Electricity | 88.29 | kW·h | Butt welder (75 kV·A) | Electricity | 122.00 | kW·h |
| Diesel dumper (1 t) | Diesel | 6.03 | kg | Electric welding machine (75 kV·A) | Electricity | 154.63 | kW·h |
| Belt conveyer (15 m∗0.5 m) | Electricity | 20.58 | kW·h | Welding rod drying box (450∗350∗450) | Electricity | 6.70 | kW·h |
| Concrete mixer (350 L) | Electricity | 43.52 | kW·h | Auto crane (5 t) | Gasoline | 23.30 | kg |
| Steel bar straightener (14 mm) | Electricity | 11.90 | kW·h | Motor truck (8 t) | Diesel | 35.49 | kg |
| Steel bar cutter (40 mm) | Electricity | 32.10 | kW·h | Crawler crane (15 t) | Diesel | 29.52 | kg |
| Steel bar bender (40 mm) | Electricity | 12.80 | kW·h | Wheel crane (20 t) | Diesel | 41.51 | kg |
| Tributary arc welder (32 kV·A) | Electricity | 96.52 | kW·h | Mortar mixer (200 L) | Electricity | 8.61 | kW·h |
Figure 4The Total Carbon Emissions of the Case Building under Different Prefabrication Rates.
Figure 5Carbon Emissions in Each Phase under Different Prefabrication Rates.
Carbon Emission Ratios under Different Prefabrication Rates.
| Ratios | Prefabrication Rates | |||
|---|---|---|---|---|
| 0 | 22.86% | 32.69% | 46.98% | |
|
| 94.9% | 95.4% | 95.5% | 94.7% |
|
| 5.1% | 4.6% | 4.5% | 5.3% |
Carbon Emissions of Key Materials under Different Prefabrication Rates.
| Carbon Emissions | Prefabrication Rates | Unit | |||
|---|---|---|---|---|---|
| 0 | 22.86% | 32.69% | 46.98% | ||
| From all materials | 267.756 | 277.248 | 282.171 | 269.838 | kgCO2/m2 |
| From concrete and steel (key materials) | 116.007 | 124.617 | 126.081 | 150.965 | kgCO2/m2 |
| The ratio of key materials and all materials | 43.33% | 44.95% | 44.68% | 55.95% | / |
Figure 6Carbon Emissions from Concrete under Different Prefabrication Rates.
Carbon Emissions from Machineries under Different Prefabrication Rates (Unit: kgCO2/m2).
| Carbon Emissions | Prefabrication Rates | |||
|---|---|---|---|---|
| 0 | 22.86% | 32.69% | 46.98% | |
|
| 14.372 | 13.256 | 13.306 | 14.983 |
|
| —— | 0.781 | 1.026 | 1.376 |
|
| 7.367 | 7.824 | 7.897 | 8.217 |
|
| 7.005 | 4.652 | 4.382 | 5.390 |