Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

L Jaillon1, C S Poon, Y H Chiang.   

Abstract

As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

Mesh:

Year:  2008        PMID: 18434128     DOI: 10.1016/j.wasman.2008.02.015

Source DB:  PubMed          Journal:  Waste Manag        ISSN: 0956-053X            Impact factor:   7.145


  3 in total

1.  Comment on Chen, J.; Su, Y.; Si, H.; Chen, J. Managerial Areas of Construction and Demolition Waste: A Scientometric Review. Int. J. Environ. Res. Public Health 2018, 15, 2350.

Authors:  Yuh-Shan Ho
Journal:  Int J Environ Res Public Health       Date:  2019-05-23       Impact factor: 3.390

2.  The Carbon Emission Assessment of a Building with Different Prefabrication Rates in the Construction Stage.

Authors:  Qingye Han; Junjie Chang; Guiwen Liu; Heng Zhang
Journal:  Int J Environ Res Public Health       Date:  2022-02-18       Impact factor: 3.390

3.  Evaluation of critical risk factors in the implementation of modular construction.

Authors:  Hamza Pervez; Yousaf Ali; Dragan Pamucar; Mónika Garai-Fodor; Ágnes Csiszárik-Kocsir
Journal:  PLoS One       Date:  2022-08-08       Impact factor: 3.752

  3 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.