Two multicentre adaptive radiotherapy trials utilising Plan of the Day (PoD) with a library of plans were introduced in 35 centres. The common issues that arose from all centres when introducing PoD were collated retrospectively, through reviewing the data pertaining to the pre-trial and on-trial quality assurance programme. It was found that 1,295 issues arose when introducing PoD in outlining, planning, treatment delivery i.e., PoD selection, and in the overall process of delivering PoD. There was no difference in the number of issues that arose from pre-trial to on-trial. Thus, it is recommended that the implementation of PoD is supported by guidance, reviews, and continuous monitoring.Entities:
Keywords: Adaptive; Bladder cancer; Education; IGRT; Plan selection; Quality assurance
Year: 2022 PMID: 35198744 PMCID: PMC8841376 DOI: 10.1016/j.tipsro.2022.01.002
Source DB: PubMed Journal: Tech Innov Patient Support Radiat Oncol ISSN: 2405-6324
Fig. 1a. Pre-Trial Quality Assurance. b. On-Trial Quality Assurance.
Main Operative Issues when Implementing PoD.
| Group | Description of Issue | Frequency |
|---|---|---|
| Outlining (n = 226) | Not enough bowel contoured | 57 |
| CTV_Large does not include all of CTV_Small | 47 | |
| Not enough rectum contoured | 22 | |
| PTV_Medium > PTV_Large and/or PTV_Small > PTV_Medium | 12 | |
| No CTV_Large produced | 13 | |
| Incorrect expansions | 6 | |
| OARs contoured on incorrect dataset | 3 | |
| Planning (n = 528) | Incorrect naming of plans and/or beams and/or structures | 39 |
| D95% not growing as PTV size increases from small to medium to large | 29 | |
| OAR constraints worse for smaller plans | 27 | |
| PoD selections (n = 8,286) | Plan selections not guideline compliant | 119 |
| PoD Process (n = 43) | Unable to schedule treatment | 21 |
| Unable to schedule imaging | 16 | |
| Not considered that 2 PoD approved staff should be present for plan selection | 14 | |