| Literature DB >> 35104831 |
Jennifer A Long1, Craig S Webster, Timothy Holliday, Jane Torrie, Jennifer M Weller.
Abstract
INTRODUCTION: In situ simulation provides a valuable opportunity to identify latent safety threats (LSTs) in real clinical environments. Using a national simulation program, we explored latent safety threats (LSTs) identified during in situ multidisciplinary simulation-based training in operating theaters in hospitals across New Zealand.Entities:
Mesh:
Year: 2022 PMID: 35104831 PMCID: PMC8812409 DOI: 10.1097/SIH.0000000000000547
Source DB: PubMed Journal: Simul Healthc ISSN: 1559-2332 Impact factor: 1.929
The Contributory Factors Framework From the London Protocol
| Factor Types | Contributory Factor (Subcategories) |
|---|---|
| Patient factors | Condition (complexity and seriousness) |
| Task and technology factors | Task design and clarity of structure |
| Individual (staff) factors | Knowledge and skills |
| Team factors | Verbal communication |
| Work environment factors | Staffing levels and skills mix |
| Organizational and management factors | Financial resources and constraints |
| Institutional context factors | Economic and regulatory context |
Latent Safety Threats Coded Against London Protocol Factor Types and Subcategories: Number of Reports, Percentage of Reports, and Percentage of Sites Recording These Issues
| No. Reports (%) | No. Sites (%) | |
|---|---|---|
| 1. Patient factors | 3 (4) | 3 (14) |
| Condition (complexity, seriousness) | 0 | 0 |
| Language and communication | 0 | 0 |
| Personality and social factors | 3(4) | 3 (14) |
| 2. Task and technology factors | 31 (40) | 16 (76) |
| Task design and clarity of structure | 12 (16) | 11 (52) |
| Availability and use of protocols | 3 (4) | 3 (14) |
| Availability and accuracy of test results | 5 (6) | 5 (24) |
| Decision-making aids | 20 (26) | 12 (57) |
| 3. Individual (staff factors) | 63 (82) | 19 (90) |
| Knowledge and skills | 63 (82) | 19 (90) |
| Competence | 1 (1) | 5 (1) |
| Physical and mental health | 2 (3) | 10 (2) |
| 4. Team factors | 59 (77) | 20 (95) |
| Verbal communication | 38 (49) | 15 (71) |
| Written communication | 9 (12) | 8 (38) |
| Supervision and seeking help | 18 (23) | 12 (57) |
| Team structure | 7 (9) | 7 (33) |
| Task distribution within team members* | 35 (45) | 14 (67) |
| Knowing names of team members* | 17 (22) | 10 (48) |
| 5. Work environment factors | 46 (60) | 18 (86) |
| Staffing levels and skills mix | 10 (13) | 7 (33) |
| Workload and shift patterns | 3 (4) | 3 (14) |
| Design, availability, and maintenance of equipment | 45 (58) | 18 (86) |
| Administrative and managerial support | 5 (6) | 4 (19) |
| Environment | 1 (1) | 1 (5) |
| Physical | 3 (4) | 2 (10) |
| Issues related to medication storage* | 15 (19) | 12 (57) |
| 6. Organizational and management factors | 8 (10) | 6 (29) |
| Policy, standards, and goals | 3 (4) | 2 (10) |
| Safety culture and priorities | 4 (5) | 4 (19) |
| Financial resources and constraints | 1 (1) | 1 (5) |
| Organizational structure | 0 | 0 |
| 7. Institutional context | 1 (1) | 1 (5) |
| Economic and regulatory context | 1 (1) | 1 (5) |
| Links with external organizations | 0 | 0 |
| National health service executive | 0 | 0 |
The total number of reports is 77 and the total number of sites is 21.
*Items with an asterisk were added to the original London Protocol list as existing subcategories did not describe this threat.
Individual Staff Factors: Knowledge and Skill Gaps Identified by the Number of Reports, Percentage of Reports, and Percentage of Sites Reporting This Issue
| Skill-Type | No. Reports (%) | No. Sites (%) |
|---|---|---|
| Defibrillator use knowledge and skills | 27 (35) | 12 (57) |
| Crisis checklist existence, location, or use | 23 (30) | 12 (57) |
| OT familiarity | 17 (22) | 12 (57) |
| CPR knowledge and skills | 22 (29) | 11 (52) |
| Other procedural knowledge | 14 (18) | 11 (52) |
| Local blood system knowledge | 16 (21) | 10 (48) |
| Other equipment use | 10 (13) | 9 (43) |
| Awareness of equipment location | 6 (8) | 5 (24) |
| Rapid fluid infuser setup and use | 6 (8) | 5 (24) |
| Communication tool knowledge | 1 (1) | 1 (5) |
The total number of reports is 77 and the total number of sites is 21.
Protective Factors Described as Working Well During the Simulated Scenarios
| No. Reports (%) | No. Sites (%) | |
|---|---|---|
| Individual factors | ||
| Knowledge and skills | 3 (4) | 2 (10) |
| Team factors | ||
| Shared mental model (briefings, recaps) | 49 (64) | 17 (81) |
| Leadership | 16 (21) | 9 (43) |
| Closed loop communication | 15 (19) | 10 (48) |
| Speaking up | 13 (17) | 8 (38) |
| Using people's names | 3 (4) | 2 (10) |
| Debriefing after event | 2 (3) | 2 (10) |
| Task sharing (backup behavior) | 17 (22) | 10 (48) |
| Using team skill mix | 12 (16) | 7 (33) |
| Good written communication | 10 (13) | 8 (38) |
| Supervision and seeking help | 4 (5) | 3 (14) |
| Task and technology factors | ||
| Decision-making aids | 7 (9) | 6 (29) |
| Other | 2 (8) | 5 (24) |
The total number of reports is 77 and the total number of sites is 21.
Countermeasures and Specific Fixes Taken in Response to Identified Patient Safety Threats, Categorized Against the London Protocol System
| No. Reports (%) | No. Sites (%) | Examples | |
|---|---|---|---|
| Task design and clarity of structure | 2 (3) | 2 (10) | Met with local blood bank to clarify the process of ordering blood products in an emergency. |
| Availability and accuracy of test results | 1 (1) | 1 (5) | New blood analyzer machine ordered for theater suite to reduce time for blood gas results. |
| Knowledge and skills | 6 (8) | 5 (24) | Staff training on defibrillator use, Advanced Cardiac Life Support (ACLS) protocol, and location of emergency equipment. |
| Written communication | 3 (4) | 3 (14) | Incorrect written information corrected about process for ordering blood products or blood tests. |
| Design, availability, and maintenance of equipment | 4 (5) | 3 (14) | Equipment repaired, emergency bells replaced, process of regular checking of emergency stock established, setup of emergency trolley improved |
The total number of reports is 77 and the total number of sites is 21.