| Literature DB >> 34722372 |
Yongcheng Su1, Xiaogang Zheng1, Zhong Ouyang1.
Abstract
BACKGROUND: Curative operation is the practical and primary therapy for masses of breast cancers. In contrast, the correlation between the time interval from breast cancer diagnosis to curative surgery and survival is still uncertain.Entities:
Keywords: Breast cancer; Meta-analysis; Survival; Time to surgery
Year: 2021 PMID: 34722372 PMCID: PMC8542807 DOI: 10.18502/ijph.v50i9.7048
Source DB: PubMed Journal: Iran J Public Health ISSN: 2251-6085 Impact factor: 1.429
Fig. 1:Flowchart of the study selection strategy
Characteristics of studies selected for inclusion in this analysis
|
|
|
|
|
|
|
|---|---|---|---|---|---|
|
| US | NA | 43,970 | 6 | Abstract |
|
| US | NA | 11391 | 6 | Abstract |
| Mansfield et al. 2015 | US | NA | 3932 | 9 | Full Text |
|
| US | 19. 1%pts<50yr | 351087 | 9 | Full Text |
|
| US | 54. 5 (11. 8) | 9669 | 9 | Full Text |
|
| US | 58. 2 (10. 8) | 7017 | 9 | Full Text |
|
| US | 75. 2 (6. 2) | 94 544 | 8 | Full Text |
|
| US | 60. 3(13. 4) | 115790 | 8 | Full Text |
|
| Korea | 49. 3 (10. 4 | 2045 | 9 | Full Text |
Outcomes reported in studies selected for inclusion in this analysis
|
|
|
|
| |
|---|---|---|---|---|
|
|
| |||
|
| III | 12wk vs 4wk | 1. 07(0. 90–1. 28) | - |
|
| II/III | <3wk vs >3wk | 0. 97(0. 17–5. 65) | - |
| Mansfield et al. 2015 | II/III | 0–21d vs. 22–42 d | - | 1. 588 (1. 235–2. 043) |
| - | 0–21d vs. 43–63 d | - | 1. 909(1. 177–3. 094) | |
| - | 22–42 d vs. 43–63 d | - | 1. 202(0. 723–1. 997) | |
|
| I–III | Per month of delay | 1. 10(1. 08–1. 13) | - |
|
| I–III | ≥5wk vs. <5w | 1. 07 (0. 59–1. 95) | - |
|
| NA | 6wk vs. 3wk | 1. 14(0. 82–1. 59) | - |
|
| I–III | Per month of delay | 1. 09(1. 06–1. 13) | - |
|
| I–III | Per month of delay | 1. 10(1. 07–1. 13) | - |
|
| NA | ≥4wk vs. 4wk | 1. 08(0. 69–1. 71) | - |
Fig. 2:Individual hazard ratio (HR) for overall survival (OS) according to waiting time categories. A) The relationship between OS and waiting time categories in the 8 eligible studies. The HR represents a comparison with the lowest waiting time category in each study. The first author of each study is show. B) Conversion of HR estimates from the original studies to an HR per week of delay. The slope of each line represents the change in the log HR per week of delay. The line for each individual study is located over the range of waiting times
Fig. 3:The association between per 4-weeks surgical delay and overall survival
Fig. 4:A. Funnel plot of the association between TTS and OS after 3 studies with the largest weight were removed. B. Egger’s funnel plot with 95% confidence limits to detect publication bias
Fig. 5:Sensitivity analyses for included studies concerning OS. The vertical axis indicates the overall HR and the two vertical axes indicate its 95% CI. Every hollow round shape indicates the pooled OR when the left study is omitted in this meta-analysis. The two ends of every broken line represent the respective 95% CI