| Literature DB >> 33458293 |
Rita Simões1, Geert Wortel1, Terry G Wiersma1, Tomas M Janssen1, Uulke A van der Heide1, Peter Remeijer1.
Abstract
BACKGROUND ANDEntities:
Keywords: Auto-contouring; Contour comparison; Dosimetric differences
Year: 2019 PMID: 33458293 PMCID: PMC7807634 DOI: 10.1016/j.phro.2019.11.003
Source DB: PubMed Journal: Phys Imaging Radiat Oncol ISSN: 2405-6316
Fig. 1Top row: axial (left) and coronal (right) midslices of the 3D average surface distance map (signed values); the standard deviations are displayed in the bottom row. The distances are overlaid on the average CT scan of all eighty-seven patients and they indicate the relative position of the contours, with negative values meaning under-contouring and positive values indicating over-contouring by the auto-contouring toolbox.
Fig. 2Manual vs. automatic CTV volumes; the atlas volumes are indicated as crosses above the plot.
Fig. 3Manual (purple) and automatic (pink) PTVs and their respective generated plans (manual left; automatic right) in a patient for which the auto-contouring resulted in both cranial under-contouring and lateroposterior over-contouring. Top row: axial view; bottom row: sagittal view. (For interpretation of the references to colour in this figure legend, the reader is referred to the web version of this article.)
Fig. 4a) 5th percentile of the signed distances on the most cranial 10% of the breast (5pSD) vs. the PTV rΔV95%; b) 95th percentile of the signed distances on the most posterior 10% of the breast (95pSD) vs. the ΔV20Gy in both lungs.
Absolute differences between the dosimetric parameters in the two plans (automatic – manual).
| Metric | Mean | Standard deviation |
|---|---|---|
| Heart Dmean [Gy] | −0.008 | 0.062 |
| Lung Dmean [Gy] | −0.072 | 0.342 |
| Lung V20Gy [%] | 0 | 1 |
| PTV D2% [Gy] | −0.027 | 0.240 |
| PTV D98% [Gy] | −5.450 | 8.213 |
| PTV V95% [%] | −3 | 3 |
| PTV Dmean [Gy] | −0.377 | 0.571 |
| Heart V5Gy [%] | 0 | 0 |
Fig. 5Dosimetric inter-observer variability for 10 patients, ordered from left to right according to the V95% (determined in the consensus PTV) obtained by the plan made based on the automatic contour.