| Literature DB >> 31161545 |
Muhammad Mohsin1,2, Jijian Zhang3, Rahman Saidur4,5, Huaping Sun3, Sadiq Mohammed Sait6.
Abstract
In this study, we proposed integrated tools to evaluate the wind power potential, economic viability, and prioritize 15 proposed sites for the installation of wind farms. Initially, we used modified Weibull distribution model coupled with power law to assess the wind power potential. Secondly, we employed value cost method to estimate per unit cost ($/kWh) of proposed sites. Lastly, we used Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (F-TOPSIS) to rank the best alternatives. The results indicate that Pakistan has enormous wind power potential that cost varies from 0.06 $/kWh to 0.58 $/kWh; thus, sites S12, S13, S14, and S15 are considered as the most economic viable locations for the installation of wind power project, while remaining sites are considered to be less important, due to other complexities. The further analysis using Fuzzy-TOPSIS method reveals that site S13 is the most optimal location followed by S12, S14, and S14 for the development of wind power project. We proposed that government should formulate wind power policy for the implementation of wind power projects in order to meet energy demand of the country.Entities:
Keywords: Economic assessment; Fuzzy-TOPSIS; Power law; Renewable energy; Weibull distribution; Wind power potential
Mesh:
Year: 2019 PMID: 31161545 DOI: 10.1007/s11356-019-05564-6
Source DB: PubMed Journal: Environ Sci Pollut Res Int ISSN: 0944-1344 Impact factor: 4.223