| Literature DB >> 31098746 |
Anna Kalbarczyk1, Wendy Davis2, Sam Kalibala3, Scott Geibel3, Aisha Yansaneh4, Nina A Martin5, Ellen Weiss3, Deanna Kerrigan2, Yukari C Manabe6.
Abstract
Capacity building in implementation science is integral to PEPFAR's mission and to meeting the 90-90-90 goals. The USAID funded Project SOAR sponsored a 4 day workshop for investigators and governmental and non-governmental partners from 12 African countries. The workshop was designed to address both findings from a pre-workshop online needs assessment as well as capacity challenges across the capacity building pyramid, from individual skills to institutional systems and resources. Activities were output-oriented and skill based. An online survey evaluated sessions and changes in perceptions of needs; a majority of respondents strongly agreed that after the workshop, they better understood their personal and institutional capacity strengthening needs. Participants 'strongly agreed' that workshop content was relevant to their jobs (90%) and that they left the workshop with a specific plan for conducting future research (65%). Workshop results suggest that skill-building should be done in conjunction with systems capacity building within the cultural context.Entities:
Keywords: Capacity building; Capacity strengthening; HIV/AIDS; Implementation science; Operations research
Mesh:
Year: 2019 PMID: 31098746 PMCID: PMC6773819 DOI: 10.1007/s10461-019-02538-0
Source DB: PubMed Journal: AIDS Behav ISSN: 1090-7165
Fig. 1Capacity building pyramid
Reported capacity by training courses taken
| Reported capacities | Prior training activities | ||||||
|---|---|---|---|---|---|---|---|
| Quant. data analysis | Qualitative data analysis | Cost effectiveness analysis | Study design | Study tool design | Developing dissemination strategies | Writing reports | |
| (n = 8) | (n = 7) | (n = 2) | (n = 9) | (n = 7) | (n = 4) | (n = 6) | |
| Write a research protocol | 5 (63) | 5 (71) | 1 (50) | 5 (56) | 4 (57) | 1 (25) | 2 (33) |
| Implement a research protocol | 8 (100) | 7 (100) | 2 (100) | 8 (89) | 7 (100) | 4 (100) | 5 (83) |
| Collect data | 8 (100) | 7 (100) | 2 (100) | 8 (89) | 7 (100) | 4 (100) | 5 (83) |
| Analyze data | 3 (38) | 3 (43) | 1 (50) | 4 (44) | 2 (29) | 1 (25) | 1 (17) |
| Give a presentation at a large conference | 2 (25) | 2 (29) | 0 (0) | 4 (44) | 2 (29) | 2 (50) | 3 (50) |
| Give a presentation at local working group meeting | 7 (88) | 6 (86) | 1 (50) | 9 (100) | 7 (100) | 4 (100) | 6 (100) |
| Write a first author paper | 4 (50) | 3 (43) | 2 (100) | 4 (44) | 2 (29) | 2 (50) | 3 (50) |
| Write a grant proposal | 1 (13) | 1 (14) | 0 (0) | 2 (22) | 1 (14) | 2 (50) | 2 (22) |
| Develop a budget and budget justification | 7 (88) | 6 (86) | 2 (100) | 6 (67) | 7 (100) | 3 (75) | 4 (67) |
| Run a stakeholder meeting with policy makers | 4 (50) | 5 (71) | 1 (50) | 5 (56) | 4 (57) | 3 (75) | 5 (83) |
| Disseminate results | 3 (38) | 4 (57) | 2 (100) | 3 (33) | 2 (29) | 3 (75) | 3 (50) |
| Total | 8 | 7 | 2 | 9 | 7 | 4 | 6 |
Changes in perceptions of capacities after the workshop by participant institution type