| Literature DB >> 30303993 |
Boliang Lin1, Jingsong Duan1, Jiaxi Wang1, Min Sun1, Wengao Peng2, Chang Liu1, Jie Xiao1, Siqi Liu1, Jianping Wu1.
Abstract
A freight train service network generally involves two categories of trains: unscheduled trains, whose operating frequencies fluctuate with the freight demand, and scheduled trains, which are operated based on regular timetables similar to passenger trains. The timetables for scheduled trains are released to the public once determined, and they are not influenced by the freight demand. Typically, the total capacity of scheduled trains can satisfy the predicted average demand of express cargos. However, in practice, the demand always changes. Therefore, a method to assign the shipments to scheduled and unscheduled train services has become an important issue faced in railway transportation. This paper focuses on the coordinated optimization of rail express cargo assignment in a hybrid train services network. On the premise of fully utilizing the capacity of scheduled train services, we propose a car-to-train assignment model to reasonably assign rail express cargos to scheduled and unscheduled trains. The objective aims to maximize the profit of transporting the rail express cargos. The constraints include the capacity restriction on the service arcs, flow balance constraints, transportation due date constraints and logical relationship constraints among the decision variables. Furthermore, we discuss a linearization technique to convert the nonlinear transportation due date constraint into a linear constraint, making it possible to solve by a standard optimization solver. Finally, an illustrative case study based on the Beijing-Guangzhou Railway Line is carried out to demonstrate the effectiveness and efficiency of the proposed solution approach.Entities:
Mesh:
Year: 2018 PMID: 30303993 PMCID: PMC6179234 DOI: 10.1371/journal.pone.0204598
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1The railway service network.
Fig 2Beijing-Guangzhou railway line.
Fig 3Service network for testing the model.
Information on the shipments.
| B001 | Y003 | 4.72 | 20 | 5598 | Y001 | B006 | 5.28 | 72 | 19892 | ||
| B001 | B005 | 14.64 | 72 | 19770 | Y001 | B005 | 4.48 | 72 | 19808 | ||
| B001 | Y004 | 4.48 | 26 | 9201 | Y002 | Y004 | 3.76 | 24 | 5211 | ||
| B001 | B003 | 29.44 | 36 | 9567 | Y002 | B003 | 4.56 | 24 | 5577 | ||
| B001 | Y005 | 13.76 | 34 | 13146 | Y002 | Y005 | 4.24 | 29 | 9157 | ||
| B001 | Y006 | 7.76 | 60 | 16363 | Y002 | Y006 | 3.76 | 48 | 12373 | ||
| B001 | B004 | 9.04 | 60 | 16603 | Y002 | B004 | 13.68 | 60 | 12614 | ||
| B001 | Y007 | 2.36 | 72 | 28534 | Y002 | Y007 | 7.76 | 45 | 14434 | ||
| B001 | Y007 | 7.68 | 72 | 19929 | Y002 | B006 | 5.2 | 72 | 16645 | ||
| B001 | B006 | 17.52 | 72 | 19854 | Y002 | B005 | 5.04 | 60 | 16561 | ||
| B001 | B006 | 2.15 | 72 | 28428 | Y003 | Y005 | 25.92 | 24 | 19892 | ||
| B002 | Y003 | 11.28 | 24 | 5673 | Y003 | Y006 | 19.6 | 43 | 19808 | ||
| B002 | Y004 | 8.56 | 36 | 9276 | Y003 | B004 | 10.4 | 46 | 5211 | ||
| B002 | B003 | 5.36 | 48 | 9642 | Y003 | Y007 | 7.28 | 60 | 5577 | ||
| B002 | Y005 | 5.12 | 36 | 13222 | Y003 | B006 | 4.96 | 65 | 9157 | ||
| B002 | Y006 | 3.76 | 60 | 16439 | Y003 | B005 | 3.68 | 56 | 12373 | ||
| B002 | B004 | 3.84 | 60 | 16679 | Y004 | Y006 | 26.96 | 24 | 12614 | ||
| B002 | B005 | 7.28 | 72 | 19694 | Y004 | B004 | 4.8 | 32 | 14434 | ||
| B002 | Y007 | 4.16 | 72 | 19853 | Y004 | Y007 | 5.76 | 26 | 16645 | ||
| B002 | Y007 | 8.72 | 72 | 28427 | Y004 | B006 | 18.4 | 48 | 16561 | ||
| B002 | B006 | 3.64 | 72 | 28321 | Y004 | B005 | 12.24 | 48 | 8119 | ||
| B002 | B006 | 17.44 | 72 | 19779 | B003 | Y006 | 7.6 | 36 | 11336 | ||
| Y001 | Y003 | 37.68 | 24 | 5560 | B003 | B004 | 6.64 | 24 | 11576 | ||
| Y001 | Y004 | 25.84 | 36 | 9163 | B003 | Y007 | 5.92 | 36 | 13396 | ||
| Y001 | B003 | 19.36 | 65 | 9529 | B003 | B006 | 5.92 | 48 | 13322 | ||
| Y001 | Y005 | 18.88 | 48 | 13108 | B003 | B005 | 4.72 | 36 | 13237 | ||
| Y001 | Y006 | 14.72 | 58 | 16325 | Y005 | Y007 | 4.72 | 36 | 7732 | ||
| Y001 | B004 | 8.72 | 48 | 16565 | Y005 | B006 | 4.48 | 36 | 7973 | ||
| Y001 | Y007 | 5.52 | 72 | 19966 | Y005 | B005 | 3.84 | 36 | 9793 |
Information on the train services.
| Train _No. | Train _No. | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| B001 | Y003 | 7.3 | 20 | X001 | Y001 | Y004 | 27.4 | 200 | H007 | ||
| B001 | Y003 | 7.3 | 13 | X002 | Y002 | Y003 | 3.3 | 200 | H008 | ||
| Y003 | B003 | 7.9 | 27 | X002 | Y002 | Y004 | 14.6 | 200 | H009 | ||
| B003 | Y005 | 9.2 | 24 | X002 | Y002 | Y005 | 27.1 | 200 | H010 | ||
| Y005 | B004 | 6.7 | 19 | X002 | Y003 | Y004 | 11.3 | 200 | H011 | ||
| B004 | B006 | 5.4 | 21 | X002 | Y003 | Y005 | 23.8 | 200 | H012 | ||
| Y005 | B004 | 8.0 | 15 | X003 | Y003 | Y007 | 40.5 | 200 | H013 | ||
| B004 | B005 | 4.0 | 13 | X003 | Y004 | B003 | 1.2 | 200 | H014 | ||
| B002 | Y003 | 7.6 | 7 | X004 | B003 | Y004 | 1.2 | 200 | H015 | ||
| Y003 | Y004 | 7.0 | 12 | X004 | Y004 | Y005 | 12.5 | 200 | H016 | ||
| Y004 | Y005 | 10.0 | 13 | X004 | Y004 | Y006 | 22.5 | 200 | H017 | ||
| Y001 | Y003 | 7.5 | 25 | X005 | Y004 | Y007 | 29.1 | 200 | H018 | ||
| Y003 | Y004 | 12 | 25 | X005 | Y005 | Y006 | 10.2 | 200 | H019 | ||
| Y004 | Y005 | 7.5 | 25 | X005 | Y005 | Y007 | 16.9 | 200 | H020 | ||
| Y005 | Y007 | 9.4 | 25 | X005 | Y006 | B004 | 1.4 | 200 | H021 | ||
| Y007 | B006 | 4.0 | 25 | X005 | B004 | Y006 | 1.4 | 200 | H022 | ||
| B001 | Y001 | 0.5 | 200 | H001 | Y006 | Y007 | 6.8 | 200 | H023 | ||
| Y001 | B001 | 0.5 | 200 | H002 | Y007 | B005 | 0.5 | 200 | H024 | ||
| B002 | Y001 | 0.5 | 200 | H003 | Y007 | B006 | 3.0 | 200 | H025 | ||
| Y001 | B002 | 0.5 | 200 | H004 | B005 | Y007 | 0.5 | 200 | H026 | ||
| Y001 | Y002 | 12.8 | 200 | H005 | B006 | Y007 | 3.0 | 200 | H027 | ||
| Y001 | Y003 | 16.1 | 200 | H006 |
The average transfer time of Wuhan North Station and Hengyang North Station from 2005 to 2014.
| 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | Ave. | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Wuhan North (hr) | 8.70 | 8.50 | 8.60 | 8.50 | 8.80 | 8.00 | 8.30 | 7.80 | 8.00 | 7.80 | 8.30 |
| Hengyang North (hr) | 5.90 | 5.50 | 6.80 | 8.00 | 7.40 | 6.90 | 6.70 | 9.30 | 10.00 | 9.00 | 7.55 |
Transfer time between arc m and arc n.
| Arc_m | Arc_n | Arc_m | Arc_n | Arc_m | Arc_n | |||
|---|---|---|---|---|---|---|---|---|
| 3.4 | 4.3 | 1.5 | ||||||
| 2.0 | 2.8 | 5.0 | ||||||
| 5.6 | 2.5 | 4.0 | ||||||
| 2.9 | 3.0 |
Results of the car-to-train assignment.
| Car-to-Train Assignment Plan | |||||
|---|---|---|---|---|---|
| 20 | — | — | 0.00% | —— | |
| 72 | 64.3 | 7.7 | 88.80% | B001→ARC_02→ARC_29→ARC_40→B005 | |
| 26 | — | — | 0.00% | —— | |
| 36 | — | — | 0.00% | —— | |
| 34 | — | — | 0.00% | —— | |
| 60 | — | — | 0.00% | —— | |
| 60 | 55.1 | 4.9 | 3.65% | B001→ARC_01→ARC_28→ARC_07→B004 | |
| 72 | 71.3 | 0.7 | 100.00% | B001→ARC_17→ARC_21→ARC_25→ARC_11→ARC_15→Y007 | |
| 72 | 68.1 | 3.9 | 100.00% | B001→ARC_17→ARC_12→ARC_13→ARC_34→Y007 | |
| 72 | 66.8 | 5.2 | 100.00% | B001→ARC_01→ARC_29→ARC_41→B006 | |
| 72 | 67.8 | 4.2 | 100.00% | B001→ARC_01→ARC_29→ARC_16→B006 | |
| 24 | — | — | 0.00% | —— | |
| 36 | 35.9 | 0.1 | 100.00% | B002→ARC_19→ARC_23→Y004 | |
| 48 | 45.1 | 2.9 | 100.00% | B002→ARC_19→ARC_23→ARC_30→B003 | |
| 36 | — | — | 0.00% | —— | |
| 60 | 58.2 | 1.8 | 18.35% | B002→ARC_19→ARC_12→ARC_13→ARC_14→ARC_35→Y006 | |
| 60 | 59.5 | 0.5 | 71.61% | B002→ARC_19→ARC_12→ARC_10→ARC_11→ARC_07→B004 | |
| 72 | — | — | 0.00% | —— | |
| 72 | 71.3 | 0.7 | 100.00% | B002→ARC_19→ARC_21→ARC_25→ARC_11→ARC_15→Y007 | |
| 72 | 65.8 | 6.2 | 100.00% | B002→ARC_19→ARC_21→ARC_25→ARC_14→ARC_15→Y007 | |
| 72 | 66.5 | 5.5 | 100.00% | B002→ARC_19→ARC_12→ARC_10→ARC_11→ARC_05 | |
| 72 | 67.1 | 4.9 | 40.14% | B002→ARC_09→ARC_29→ARC_41→B006 | |
| 24 | 16.1 | 7.9 | 100.00% | Y001→ARC_22→Y004 | |
| 36 | 27.4 | 8.6 | 100.00% | Y001→ARC_23→Y004 | |
| 65 | 36.6 | 28.4 | 100.00% | Y001→ARC_23→ARC_30→B003 | |
| 48 | 47.9 | 0.1 | 100.00% | Y001→ARC_21→ARC_25→ARC_32→B003 | |
| 58 | 57.9 | 0.1 | 100.00% | Y001→ARC_23→ARC_33→Y006 | |
| 48 | 46.2 | 1.8 | 39.45% | Y001→ARC_12→ARC_13→ARC_14→ARC_05→B004 | |
| 72 | 64.5 | 7.5 | 100.00% | Y001→ARC_21→ARC_25→ARC_34→Y007 | |
| 72 | 54.5 | 17.5 | 100.00% | Y001→ARC_12→ARC_13→ARC_14→ARC_05→ARC_06→B006 | |
| 72 | 58.9 | 13.1 | 33.93% | Y001→ARC_12→ARC_03→ARC_04→ARC_07→ARC_08→B006 | |
| 24 | 14.6 | 9.4 | 100.00% | Y001→ARC_25→Y004 | |
| 24 | 15.8 | 8.2 | 100.00% | Y002→ARC_25→ARC_30→Y003 | |
| 29 | 27.1 | 1.9 | 100.00% | Y002→ARC_25→ARC_32→Y005 | |
| 48 | 37.1 | 10.9 | 100.00% | Y002→ARC_25→ARC_33→Y006 | |
| 60 | 46.5 | 13.5 | 100.00% | Y002→ARC_25→ARC_33→ARC_37→B004 | |
| 45 | 43.7 | 1.3 | 100.00% | Y002→ARC_25→ARC_34→Y007 | |
| 72 | 54.7 | 17.3 | 100.00% | Y002→ARC_25→ARC_34→ARC_41→ARC_41→B006 | |
| 60 | 52.2 | 7.8 | 100.00% | Y002→ARC_25→ARC_34→ARC_40→B005 | |
| 24 | 23.8 | 0.2 | 100.00% | Y003→ARC_28→Y005 | |
| 43 | 41.8 | 1.2 | 100.00% | Y003→ARC_27→ARC_33→Y006 | |
| 46 | 39.8 | 6.2 | 100.00% | Y003→ARC_07→ARC_28→B004 | |
| 60 | 48.7 | 11.3 | 100.00% | Y003→ARC_28→ARC_36→Y007 | |
| 65 | 59.7 | 5.3 | 100.00% | Y003→ARC_28→ARC_36→ARC_41→B006 | |
| 56 | 49.0 | 7.0 | 100.00% | Y003→ARC_29→ARC_40→B005 | |
| 24 | 22.5 | 1.5 | 100.00% | Y004→ARC_33→Y006 | |
| 32 | 31.9 | 0.1 | 100.00% | Y004→ARC_33→ARC_37→B004 | |
| 26 | 21.9 | 4.1 | 100.00% | Y004→ARC_14→ARC_15→Y007 | |
| 48 | 40.1 | 7.9 | 100.00% | Y004→ARC_34→ARC_41→B006 | |
| 48 | 37.6 | 10.4 | 100.00% | Y004→ARC_34→ARC_40→B005 | |
| 36 | 31.7 | 4.3 | 100.00% | B003→ARC_31→ARC_33→Y006 | |
| 24 | 21.5 | 2.5 | 100.00% | B003→ARC_04→ARC_05→B004 | |
| 36 | 34.1 | 1.9 | 100.00% | B003→ARC_04→ARC_36→Y007 | |
| 48 | 46.1 | 1.9 | 100.00% | B003→ARC_04→ARC_36→ARC_16→B006 | |
| 36 | 33.5 | 2.5 | 84.75% | B003→ARC_04→ARC_15→ARC_40→B005 | |
| 36 | 16.9 | 19.1 | 100.00% | Y005→ARC_36→Y007 | |
| 36 | 27.9 | 8.1 | 100.00% | Y005→ARC_36→ARC_41→B006 | |
| 36 | 25.4 | 10.6 | 100.00% | Y005→ARC_36→ARC_40→B005 |
Workloads of the express train arcs.
| 20.00 | 20 | 100.00% | 7.00 | 7 | 100.00% | ||
| 13.00 | 13 | 100.00% | 6.39 | 12 | 53.25% | ||
| 1.52 | 27 | 5.63% | 12.91 | 13 | 99.31% | ||
| 24.00 | 24 | 100.00% | 25.00 | 25 | 100.00% | ||
| 19.00 | 19 | 100.00% | 17.09 | 25 | 68.36% | ||
| 8.92 | 21 | 42.48% | 23.89 | 25 | 95.56% | ||
| 15.00 | 15 | 100.00% | 25.00 | 25 | 100.00% | ||
| 1.52 | 13 | 11.69% | 8.07 | 25 | 32.28% |
Fig 4Assignment results of a part of the arcs.