Chang Liu1, Boliang Lin1, Jiaxi Wang1, Jie Xiao1, Siqi Liu1, Jianping Wu1, Jian Li1.
Abstract
Since railway transport possesses the advantage of high volume and low carbon emissions, diverting some freight from road to railway will help reduce the negative environmental impacts associated with transport. This paper develops a flow assignment model for quantitative analysis of diverting truck freight to railway. First, a general network which considers road transportation, railway transportation, handling and transferring is established according to all the steps in the whole transportation process. Then general functions which embody the factors which the shippers will pay attention to when choosing mode and path are formulated. The general functions contain the congestion cost on road, the capacity constraints of railways and freight stations. Based on the general network and general cost function, a user equilibrium flow assignment model is developed to simulate the flow distribution on the general network under the condition that all shippers choose transportation mode and path independently. Since the model is nonlinear and challenging, we adopt a method that uses tangent lines to constitute envelope curve to linearize it. Finally, a numerical example is presented to test the model and show the method of making quantitative analysis of bulk freight modal shift between road and railway.Entities:
Mesh:
Substances:
Year: 2017 PMID: 28771536 PMCID: PMC5542531 DOI: 10.1371/journal.pone.0182179
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Illustration of adding virtual link.
Fig 2Illustration of physical network.
Fig 3Illustration of general network.
Fig 4Illustration of converting links into arcs.
Fig 5Illustration of linearizing the road transportation cost function.
Fig 6Illustration of linearizing the handling and transferring cost function.
The lengths of road and railway links (km).
| No. | Node 1 | Node 2 | Length of road link | Length of railway link |
|---|---|---|---|---|
| S01 | S02 | 295 | 281 | |
| S01 | S04 | 193 | 190 | |
| S01 | S07 | 442 | 444 | |
| S02 | S03 | 424 | 408 | |
| S02 | S08 | 222 | 225 | |
| S03 | S08 | 418 | 577 | |
| S03 | S11 | 475 | 511 | |
| S04 | S05 | 174 | 178 | |
| S04 | S06 | 209 | 178 | |
| S05 | S06 | 121 | 127 | |
| S05 | S09 | 289 | 323 | |
| S06 | S07 | 174 | 231 | |
| S07 | S08 | 134 | 124 | |
| S08 | S10 | 281 | 270 | |
| S08 | S11 | 597 | 651 | |
| S09 | S10 | 408 | 406 | |
| S10 | S11 | 472 | 521 |
OD matrix (million ton/year).
| S01 | S02 | S03 | |
|---|---|---|---|
| 5.10 | 8.23 | 3.45 | |
| 15.67 | 12.56 | 13.37 | |
| 1.02 | 5.43 | 3.21 | |
| 6.51 | 4.38 | 2.56 | |
| 6.21 | 11.45 | 15.77 | |
| 2.38 | 1.52 | 6.78 | |
| 0.00 | 4.21 | 0.00 |
The information of road transportation arcs (million PCU/year).
| endpoints | endpoints | endpoints | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1′ → 2′ | 28 | 24.56 | 3′ → 11′ | 28 | 24.12 | 5′ → 9′ | 28 | 25.77 | |||
| 2′ → 1′ | 28 | 25.98 | 11′ → 3′ | 28 | 22.54 | 9′ → 5′ | 28 | 21.55 | |||
| 2′ → 3′ | 28 | 24.75 | 4′ → 5′ | 28 | 25.42 | 8′ → 10′ | 28 | 25.43 | |||
| 3′ → 2′ | 28 | 22.22 | 5′ → 4′ | 28 | 22.45 | 10′ → 8′ | 28 | 22.99 | |||
| 1′ → 4′ | 28 | 25.65 | 4′ → 6′ | 28 | 25.34 | 8′ → 11′ | 28 | 24.04 | |||
| 4′ → 1′ | 28 | 22.11 | 6′ → 4′ | 28 | 22.44 | 11′ → 8′ | 28 | 25.79 | |||
| 1′ → 7′ | 28 | 25.54 | 6′ → 5′ | 28 | 24.33 | 9′ → 10′ | 28 | 22.31 | |||
| 7′ → 1′ | 28 | 22.23 | 5′ → 6′ | 28 | 22.22 | 10′ → 9′ | 28 | 24.43 | |||
| 2′ → 8′ | 28 | 24.34 | 6′ → 7′ | 28 | 22.12 | 10′ → 11′ | 28 | 21.88 | |||
| 8′ → 2′ | 28 | 22.55 | 7′ → 6′ | 28 | 22.44 | 11′ → 10′ | 28 | 25.49 | |||
| 8′ → 3′ | 28 | 24.76 | 7′ → 8′ | 28 | 21.23 | ||||||
| 3′ → 8′ | 28 | 22.89 | 8′ → 7′ | 28 | 24.77 |
The information of railway transportation arcs (million ton/year).
| endpoints | endpoints | endpoints | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1″ → 2″ | 90 | 56.15 | 11″ → 3″ | 90 | 79.25 | 5″ → 9″ | 90 | 35.77 | |||
| 2″ → 1″ | 90 | 53.98 | 4″ → 5″ | 90 | 57.58 | 9″ → 5″ | 90 | 40.61 | |||
| 2″ → 3″ | 90 | 45.70 | 5″ → 4″ | 90 | 65.69 | 8″ → 10″ | 90 | 52.54 | |||
| 3″ → 2″ | 90 | 37.80 | 4″ → 6″ | 90 | 64.10 | 10″ → 8″ | 90 | 63.19 | |||
| 1″ → 4″ | 90 | 37.82 | 6″ → 4″ | 90 | 51.84 | 8″ → 11″ | 90 | 53.42 | |||
| 4″ → 1″ | 90 | 54.58 | 6″ → 5″ | 90 | 69.76 | 11″ → 8″ | 90 | 61.56 | |||
| 1″ → 7″ | 50 | 22.62 | 5″ → 6″ | 90 | 65.98 | 9″ → 10″ | 90 | 37.68 | |||
| 2″ → 8″ | 100 | 67.44 | 6″ → 7″ | 90 | 35.76 | 10″ → 9″ | 90 | 35.39 | |||
| 8″ → 2″ | 100 | 60.22 | 7″ → 6″ | 90 | 41.01 | 10″ → 11″ | 90 | 59.91 | |||
| 3″ → 8″ | 50 | 30.64 | 7″ → 8″ | 90 | 52.48 | 11″ → 10″ | 90 | 68.24 | |||
| 3″ → 11″ | 90 | 77.71 | 8″ → 7″ | 90 | 36.01 |
a,b single-track railway
The values of other parameters.
| 0.18 CNY/ton-km | 0.14 CNY/ton-km | 0.01 CNY/h | 0.16 PCU/ton | |
| 80 km/h | 10.42 km/h | 1.5 | 4 |
The paths and volumes of the shipments.
| OD | Path | Volume(million ton/year) |
|---|---|---|
| S05 → S04 → S01 | 5.10 | |
| S05 ⇒ S04 ⇒ S01 ⇒ S02 | 8.23 | |
| S05 → S06 → S07 → S08 → S03 | 3.45 | |
| S06 → S04 → S01 | 5.79 | |
| S06 ⇒ S04 ⇒ S01 | 9.88 | |
| S06 → S07 → S08 → S02 | 7.32 | |
| S06 → | 5.24 | |
| S06 → S07 → S08 → S03 | 13.37 | |
| S07 → S01 | 1.02 | |
| S07 → S08 → S02 | 5.43 | |
| S07 → S08 → S03 | 3.21 | |
| S08 → | 6.51 | |
| S08 → S02 | 4.38 | |
| S08 → S03 | 2.56 | |
| S09 → | 6.21 | |
| S09 ⇒ S10 ⇒ S08 ⇒ S02 | 11.45 | |
| S09 → S10 → S08 → S03 | 0.41 | |
| S09 ⇒ S10 ⇒ S08 ⇒ S03 | 15.36 | |
| S10 → | 2.38 | |
| S10 → S08 → S02 | 1.52 | |
| S10 → S08 → S03 | 6.78 | |
| S11 → S08 → S02 | 4.21 |
a → represents that the freight is transported by truck.
b ⇒ represents that the freight is transported by train.
c The underlined node is the node at which the freight is transferred.
The capacity and load of road transportation arc (million PCU/year).
| Load | Load | Load | ||||||
|---|---|---|---|---|---|---|---|---|
| 24.56 | 28 | 24.12 | 28 | 25.77 | 28 | |||
| 25.98 | 28 | 22.54 | 28 | 22.54 | 28 | |||
| 24.75 | 28 | 25.42 | 28 | 25.43 | 28 | |||
| 22.22 | 28 | 24.58 | 28 | 24.76 | 28 | |||
| 25.65 | 28 | 25.34 | 28 | 24.04 | 28 | |||
| 23.85 | 28 | 23.37 | 28 | 26.46 | 28 | |||
| 25.54 | 28 | 24.33 | 28 | 22.38 | 28 | |||
| 22.39 | 28 | 22.77 | 28 | 24.43 | 28 | |||
| 24.34 | 28 | 26.82 | 28 | 21.88 | 28 | |||
| 27.25 | 28 | 22.44 | 28 | 25.49 | 28 | |||
| 28.52 | 28 | 26.47 | 28 | |||||
| 22.89 | 28 | 24.77 | 28 |
The capacity and load of handling arcs (million ton/year).
| Load | Load | Load | ||||||
|---|---|---|---|---|---|---|---|---|
| 39.82 | 80 | 39.77 | 80 | 41.03 | 80 | |||
| 51.48 | 80 | 54.74 | 80 | 59.73 | 80 | |||
| 56.92 | 80 | 39.77 | 80 | 44.78 | 80 | |||
| 80.00 | 80 | 38.46 | 80 | 44.52 | 80 | |||
| 43.67 | 80 | 37.85 | 80 | 61.97 | 80 | |||
| 72.04 | 80 | 67.00 | 90 | 39.37 | 80 | |||
| 47.26 | 80 | 47.96 | 90 | 45.71 | 80 | |||
| 80.00 | 80 | 63.33 | 80 | 41.92 | 80 | |||
| 52.28 | 80 | 39.57 | 80 | 45.57 | 80 | |||
| 71.71 | 80 | 46.59 | 80 | 51.37 | 80 | |||
| 56.47 | 80 | 54.37 | 80 | 55.04 | 80 | |||
| 58.20 | 80 | 41.57 | 80 | 53.94 | 80 | |||
| 46.67 | 80 | 37.75 | 80 | 47.93 | 80 | |||
| 53.37 | 80 | 57.80 | 80 | 44.73 | 80 | |||
| 48.96 | 80 | 59.24 | 80 |
The capacity and load of handling arcs and transfer arcs (million ton/year).
| Load | Load | Load | ||||||
|---|---|---|---|---|---|---|---|---|
| 19.99 | 60 | 22.99 | 60 | 20.78 | 60 | |||
| 26.72 | 60 | 23.33 | 60 | 19.80 | 60 | |||
| 17.85 | 60 | 24.14 | 60 | 22.33 | 60 | |||
| 33.65 | 60 | 24.52 | 80 |
The capacity and load of railway transportation arcs (million ton/year).
| Load | Load | Load | ||||||
|---|---|---|---|---|---|---|---|---|
| 64.38 | 90 | 79.25 | 90 | 35.77 | 90 | |||
| 62.87 | 90 | 57.58 | 90 | 40.61 | 90 | |||
| 45.70 | 90 | 71.90 | 90 | 52.54 | 90 | |||
| 37.80 | 90 | 64.10 | 90 | 90.00 | 90 | |||
| 37.82 | 90 | 61.72 | 90 | 53.42 | 90 | |||
| 78.90 | 90 | 69.76 | 90 | 61.56 | 90 | |||
| 22.62 | 50 | 65.98 | 90 | 64.49 | 90 | |||
| 67.44 | 100 | 35.76 | 90 | 35.39 | 90 | |||
| 79.29 | 100 | 41.01 | 90 | 59.91 | 90 | |||
| 46.00 | 50 | 57.72 | 90 | 68.24 | 90 | |||
| 77.71 | 90 | 36.01 | 90 |
Fig 7Illustration of sensitivity analysis on unit expenditure of road transportation.
Fig 8Illustration of sensitivity analysis on unit expenditure of railway transportation.
The information of handling arcs (million ton/year).
| endpoints | endpoints | endpoints | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 → 1′ | 80 | 39.82 | 4″ → 4 | 80 | 39.77 | 8 → 8″ | 80 | 41.03 | |||
| 1′ → 1 | 80 | 39.57 | 5 → 5′ | 80 | 37.96 | 8″ → 8 | 80 | 59.73 | |||
| 1 → 1″ | 80 | 56.92 | 5′ → 5 | 80 | 39.77 | 9 → 9′ | 80 | 38.16 | |||
| 1″ → 1 | 80 | 55.02 | 5 → 5″ | 80 | 38.46 | 9′ → 9 | 80 | 44.52 | |||
| 2 → 2′ | 90 | 43.67 | 5″ → 5 | 80 | 37.85 | 9 → 9″ | 80 | 35.16 | |||
| 2′ → 2 | 90 | 49.18 | 6 → 6′ | 90 | 35.28 | 9″ → 9 | 80 | 39.37 | |||
| 2 → 2″ | 90 | 47.26 | 6′ → 6 | 90 | 47.96 | 10 → 10′ | 80 | 35.03 | |||
| 2″ → 2 | 90 | 55.08 | 6 → 6″ | 80 | 53.45 | 10′ → 10 | 80 | 41.92 | |||
| 3 → 3′ | 80 | 52.28 | 6″ → 6 | 80 | 39.57 | 10 → 10″ | 80 | 45.57 | |||
| 3′ → 3 | 80 | 41.93 | 7 → 7′ | 80 | 36.93 | 10″ → 10 | 80 | 51.37 | |||
| 3 → 3″ | 80 | 56.47 | 7′ → 7 | 80 | 54.37 | 11 → 11′ | 80 | 50.83 | |||
| 3″ → 3 | 80 | 42.84 | 7 → 7″ | 80 | 41.57 | 11′ → 11 | 80 | 53.94 | |||
| 4 → 4′ | 80 | 46.67 | 7″ → 7 | 80 | 37.75 | 11 → 11″ | 80 | 47.93 | |||
| 4′ → 4 | 80 | 53.37 | 8 → 8′ | 80 | 44.35 | 11″ → 11 | 80 | 44.73 | |||
| 4 → 4″ | 80 | 48.96 | 8′ → 8 | 80 | 59.24 |
The information of transfer links (million ton/year).
| endpoints | endpoints | endpoints | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1′—1″ | 60 | 19.99 | 5′—5″ | 60 | 16.78 | 9′—9″ | 60 | 20.78 | |||
| 2′—2″ | 60 | 20.21 | 6′—6″ | 60 | 23.33 | 10′—10″ | 60 | 19.80 | |||
| 3′—3″ | 60 | 17.85 | 7′—7″ | 60 | 18.90 | 11′—11″ | 60 | 22.33 | |||
| 4′—4″ | 60 | 25.42 | 8′—8″ | 80 | 22.14 |