| Literature DB >> 30086738 |
Laticha Elizabeth Marolana Walters1,2, Richard Ernest Scott3,4,5, Maurice Mars3.
Abstract
BACKGROUND: The South African public health sector embarked on a National Telemedicine System implementation program in 1999 and although unsuccessful, the Province of KwaZulu-Natal subsequently implemented teledermatology in 2003, with two currently active services (synchronous and asynchronous). Although sustained these have not been scaled-up to meet the needs of all hospitals in the Province. A recent teledermatology scale-up design requirements elicitation process within KwaZulu-Natal confirmed the need for a framework, and identified requirements through key stakeholders, programme observations, the literature, and experts. This study aimed to identify and characterise existing teledermatology or related eHealth scale-up frameworks, determine whether any met the previously elicited scale-up framework requirements, and were suitable for use in the KwaZulu-Natal public health sector.Entities:
Keywords: Developing countries; KwaZulu-Natal; Scale-up framework; Scale-up requirements; South Africa; Teledermatology; Telemedicine; eHealth
Mesh:
Year: 2018 PMID: 30086738 PMCID: PMC6081905 DOI: 10.1186/s12913-018-3418-x
Source DB: PubMed Journal: BMC Health Serv Res ISSN: 1472-6963 Impact factor: 2.655
Fig. 1An outline of the search process and results
List of identified frameworks (Abbreviation, Title, Classification and Objective)
| Abbreviation | Title of study/ report | Classification | Objective |
|---|---|---|---|
| MAPS | The MAPS toolkit mHealth assessment and planning for scale | mHealth | “to increase the scale of impact of existing mHealth products”([ |
| mHA | Applying a framework for assessing the health system challenges to scaling up mHealth in South Africa | mHealth | “to appraise the opportunities and challenges to effective implementation of mHealth at scale in health systems”([ |
| MTT | Deliverable 3.4 personalised blueprint for telemedicine deployment: Validated and tested version | telemedicine | “main focus is on the 18 critical success factors for telemedicine deployment defined by MOMENTUM. Telemedicine doers need to bear these factors in mind when scaling up their services and deploying them into routine care.”([ |
| SF | Scaling up global health interventions: A proposed framework for success | health interventions | “aimed at planners of scale-up processes to use in thinking about strategies for implementing a new program, policy, or intervention to scale”([ |
| SUF | Practical guidance for scaling up health service innovations | health interventions | “to facilitate the strategic planning and management of the scaling-up process”([ |
| SUM | Scaling up - from vision to large-scale change: A management framework for practitioners | health interventions | “practical advice on a three-step, ten task process for effective scaling up”([ |
| THD | Healthcare without walls: A framework for delivering telehealth at scale | telehealth | “to inform the future NHS strategy for telehealth”([ |
Results of mapping key components of identified scale-up frameworks against TD scale-up requirements
| eHealth categories | TD requirements | MAPS | mHA | MTT | SF | SUF | SUM | THD |
|---|---|---|---|---|---|---|---|---|
| Total and % of TD scale-up framework requirements met (26) | 21 | 12 | 20 | 7 | 17 | 16 | 21 | |
| 81% |
|
|
|
|
|
| ||
|
| 16 |
|
|
|
|
|
| |
| 94% |
|
|
|
|
|
| ||
| Need | Scale-up need | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Stakeholders | Stakeholder management | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Strategy | Scale-up strategy and budget | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Environmental scan | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Change management | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Clinic setting |
|
|
|
|
|
|
| |
| Availability | ✓ | ✓ | ✓ | ✓ | ||||
| Regulations | Regulations | ✓ | ✓ | ✓ | ✓ | ✓ | ||
| Standards | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Governance | Alignment | ✓ | ✓ | ✓ | ✓ | ✓ | ||
| Information systems | Architecture | ✓ | ✓ | |||||
| Information security | ✓ | ✓ | ||||||
| Automation | ✓ | ✓ | ✓ | ✓ | ||||
| User interfaces | ✓ | ✓ | ||||||
| Sustainability | Sustainability | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Operational plan and budget | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Incentives | ✓ | ✓ | ✓ | ✓ | ✓ | |||
|
|
|
|
| 2 | 5 | 4 | 6 | |
|
|
|
|
|
|
| 75% | ||
| Benefits | Benefits realisation |
| ✓ |
| ✓ | |||
| Benefits communication | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Program management | Risk management | ✓ | ✓ | ✓ | ||||
| Scale-up | Mobilisation | ✓ | ✓ | ✓ | ✓ | |||
| Readiness | ✓ | ✓ | ✓ | |||||
| Training plan | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Support plan | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Finalisation and close-out | ||||||||
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
| Monitoring | Monitor and control | ✓ | ✓ |
| ✓ | ✓ | ✓ |
|