| Literature DB >> 29282588 |
A Duarte1, C Bojke2, W Cayton3, A Salawu3,4,5, B Case6, L Bojke7, G Richardson7.
Abstract
BACKGROUND: Provision of specialist rehabilitation services in North Yorkshire and Humberside may be suboptimal. Local commissioning bodies need to prioritise investments in health care, but previous studies provide limited evidence to inform the decision to expand existing services on the basis of cost-effectiveness. We examine the impact of specialist rehabilitation services in the subregion on hospital length of stay (LoS) and associated costs compared to routine care.Entities:
Keywords: Complex disability; Length of stay; Local decision making; Specialist rehabilitation; Trauma
Mesh:
Year: 2017 PMID: 29282588 PMCID: PMC6105206 DOI: 10.1007/s10198-017-0952-0
Source DB: PubMed Journal: Eur J Health Econ ISSN: 1618-7598
HRG codes description and unit costs
| HRG Root | Spell HRG description | Complication and comorbidity codea | Non-elective stay cost per excess bed day |
|---|---|---|---|
| AA06 | Major intracranial procedures except trauma, with brain tumours or cerebral cysts | F | £307 |
| AA12 | Intermediate intracranial procedures except trauma, with brain tumours or cerebral cysts | E | £374 |
| AA24 | Brain tumours or cerebral cysts | E | £232 |
| F | £257 | ||
| G | £259 | ||
| H | £275 | ||
| AA25 | Cerebral degenerations or miscellaneous disorders of nervous system | C | £321 |
| D | £233 | ||
| E | £250 | ||
| F | £245 | ||
| G | £258 | ||
| AA26 | Muscular, balance, cranial or peripheral nerve disorders, epilepsy or head injury | C | £262 |
| D | £235 | ||
| E | £247 | ||
| F | £258 | ||
| G | £276 | ||
| H | £291 | ||
| HC01 | Extradural spine major 2 | B | £254 |
| C | £359 | ||
| HC02 | Extradural spine major 1 | F | £308 |
| HC03 | Extradural spine intermediate 2 | E | £272 |
| F | £350 | ||
| HC04 | Extradural spine intermediate 1 | F | £310 |
| HC27 | Degenerative spinal conditions | F | £261 |
| G | £273 |
aComplexity level decreasing alphabetically from A to Z
Average length of stay and costs by HRG code and Trust (HEY and YRK)
| Spell HRG | HEY | YRK | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| PP CH (%) | 1st FCE cost | CIPS duration (days) | CC duration (days) | CIPS duration cost | CC cost | Other costsa | Total cost | N | PP CH (%) | 1st FCE cost | CIPS duration (days) | CC duration (days) | CIPS duration cost | CC cost | Other costsa | Total cost | |
| AA06F | 19 | 5.30 | £8408 | 9.5 | 1.9 | £4153 | £1852 | £111 | £6116 | |||||||||
| AA12E | 31 | 3.20 | £6301 | 9.2 | 1.5 | £2357 | £1370 | £209 | £3936 | |||||||||
| AA24E/F | 34 | 88.20 | £3923 | 12.6 | 0 | £3029 | £0 | £543 | £3572 | 6 | 0.00 | £2153 | 21.5 | 1.2 | £4672 | £1552 | £169 | £6393 |
| AA24G | 18 | 83.30 | £2268 | 6.9 | 0 | £2148 | £0 | £225 | £2373 | 8 | 12.50 | £1294 | 23.5 | 0.3 | £4866 | £220 | £191 | £5277 |
| AA24H | 14 | 71.40 | £1679 | 4.6 | 0.1 | £1275 | £0 | £140 | £1415 | 7 | 0.00 | £1269 | 13.3 | 2.3 | £3635 | £2868 | £161 | £6664 |
| AA25D | 5 | 40.00 | £754 | 18 | 0 | £4756 | £0 | £126 | £4882 | |||||||||
| AA25E/F | 39 | 5.10 | £1335 | 9.5 | 0.3 | £2287 | £201 | £243 | £2731 | 11 | 0.00 | £1720 | 17.8 | 1 | £3642 | £1306 | £50 | £4998 |
| AA25G | 63 | 4.80 | £1158 | 5.1 | 0 | £1471 | £46 | £159 | £1676 | 53 | 0.00 | £851 | 6.1 | 0.1 | £1602 | £80 | £91 | £1773 |
| AA26C/D/E | 28 | 21.40 | £1343 | 13.7 | 1.3 | £3728 | £1991 | £107 | £5825 | 11 | 0.00 | £2239 | 47.5 | 0.7 | £11,642 | £600 | £119 | £12,361 |
| AA26F | 59 | 3.40 | £1013 | 9.5 | 1.5 | £2479 | £1697 | £97 | £4273 | 19 | 0.00 | £1251 | 10.8 | 0.4 | £2946 | £432 | £75 | £3453 |
| AA26G | 111 | 3.60 | £1064 | 5.7 | 0.3 | £1605 | £247 | £95 | £1947 | 82 | 0.00 | £1031 | 6.3 | 0.1 | £1534 | £157 | £60 | £1751 |
| AA26H | 146 | 4.10 | £712 | 4.7 | 0 | £1460 | £35 | £108 | £1603 | 163 | 0.00 | £720 | 5.2 | 0.1 | £1649 | £137 | £52 | £1838 |
| HC01B | 8 | 25.00 | £8510 | 4.1 | 0 | £1012 | £0 | £0 | £1012 | |||||||||
| HC01C | 22 | 77.30 | £6350 | 3.5 | 0 | £851 | £0 | £5 | £856 | |||||||||
| HC02F | 37 | 13.50 | £4299 | 3.2 | 0.3 | £4255 | £238 | £13 | £4506 | |||||||||
| HC03E | 15 | 13.30 | £5468 | 10.2 | 0 | £3168 | £0 | £61 | £3229 | |||||||||
| HC03F | 182 | 11.50 | £3781 | 3.5 | 0 | £1064 | £10 | £18 | £1092 | |||||||||
| HC04E/F | 197 | 17.30 | £3485 | 3 | 0 | £879 | £0 | £26 | £904 | 3 | Redacted given the small number of observations | |||||||
| HC27F/G | 46 | 4.40 | £1275 | 4.6 | 0 | £1471 | £0 | £130 | £1601 | 38 | 2.60 | £1021 | 7.448 | 0 | £1945 | £0 | £186 | £2131 |
CC critical care, N number of CIPSs, PP CH proportion of CIPSs in Castle Hill Hospital
aRefers to “unbundled” HRG costs, i.e. elements of cost and activity that have been “unbundled” from core HRG codes, and are processed separately from the FCE costs. These include elements of cost related to diagnostics, high-cost treatments and drugs. Unbundling allows the core HRGs to be better representative of activity and costs, while still including these potentially high-cost elements separately in the total costs estimation
Average length of stay and costs by HRG code and Trust (HEY and NLG)
| Spell HRG | HEY | NLG | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| N | PP CH (%) | 1st FCE cost | CIPS duration (days) | CC duration (days) | CIPS duration cost | CC cost | Other costsa | Total cost |
| PP CH (%) | 1st FCE cost | CIPS duration (days) | CC duration (days) | CIPS duration cost | CC cost | Other costsa | Total cost | |
| AA06F | 19 | 5.30 | £8408 | 9.5 | 1.9 | £4153 | £1852 | £111 | £6116 | |||||||||
| AA12E | 31 | 3.20 | £6301 | 9.2 | 1.5 | £2357 | £1370 | £209 | £3936 | |||||||||
| AA24E/F/G | 52 | 86.50 | £3350 | 10.6 | 0 | £2724 | £0 | £433 | £3157 | 9 | 11.10 | £1122 | 11.4 | 0.2 | £4140 | £196 | £211 | £4547 |
| AA24H | 14 | 71.40 | £1679 | 4.6 | 0.1 | £1275 | £0 | £140 | £1415 | 8 | 0.00 | £1101 | 12 | 1.3 | £5228 | £1099 | £349 | £6676 |
| AA25C/D | 5 | 40.00 | £754 | 18 | 0 | £4756 | £0 | £126 | £4882 | 8 | 0.00 | £5225 | 84.1 | 3.4 | £23,165 | £4278 | £155 | £27,598 |
| AA25F | 29 | 6.90 | £1207 | 9.5 | 0 | £2401 | £0 | £245 | £2646 | 16 | 0.00 | £978 | 7.8 | 0.3 | £2860 | £226 | £166 | £3252 |
| AA25G | 63 | 4.80 | £1158 | 5.1 | 0 | £1471 | £46 | £159 | £1676 | 62 | 3.20 | £966 | 7 | 0.5 | £2309 | £603 | £128 | £3040 |
| AA26C/D/E | 28 | 21.40 | £1343 | 13.7 | 1.3 | £3728 | £1991 | £107 | £5825 | 9 | 0.00 | £1682 | 36.3 | 1.8 | £10,024 | £1526 | £156 | £11,706 |
| AA26F | 59 | 3.40 | £1013 | 9.5 | 1.5 | £2479 | £1697 | £97 | £4273 | 18 | 0.00 | £698 | 8.1 | 0.5 | £2481 | £689 | £128 | £3298 |
| AA26G | 111 | 3.60 | £1064 | 5.7 | 0.3 | £1605 | £247 | £95 | £1947 | 76 | 0.00 | £670 | 5.7 | 0.7 | £1688 | £653 | £87 | £2428 |
| AA26H | 146 | 4.10 | £712 | 4.7 | 0 | £1460 | £35 | £108 | £1603 | 121 | 0.00 | £475 | 4.8 | 0.3 | £1617 | £207 | £89 | £1913 |
| HC01B | 8 | 25.00 | £8510 | 4.1 | 0 | £1012 | £0 | £0 | £1012 | |||||||||
| HC01C | 22 | 77.30 | £6350 | 3.5 | 0 | £851 | £0 | £5 | £856 | |||||||||
| HC02F | 37 | 13.50 | £4299 | 3.2 | 0.3 | £4255 | £238 | £13 | £4506 | |||||||||
| HC03E | 15 | 13.30 | £5468 | 10.2 | 0 | £3168 | £0 | £61 | £3229 | |||||||||
| HC03F | 182 | 11.50 | £3781 | 3.5 | 0 | £1064 | £10 | £18 | £1092 | |||||||||
| HC04E | 23 | 8.70 | £4570 | 5 | 0 | £1397 | £0 | £39 | £1436 | |||||||||
| HC04F | 174 | 18.40 | £3342 | 2.8 | 0 | £810 | £0 | £24 | £834 | |||||||||
| HC27F/G | 46 | 4.40 | £1275 | 4.6 | 0 | £1471 | £0 | £130 | £1601 | 15 | 0.00 | £997 | 6.667 | 0 | £1948 | £0 | £182 | £2130 |
CC critical care, N number of CIPS, PP CH proportion of CIPS in Castle Hill Hospital
aRefers to “unbundled” HRG costs, i.e. elements of cost and activity that have been “unbundled” from core HRG codes, and are processed separately from the FCE costs. These include elements of cost related to diagnostics, high cost treatments and drugs. Unbundling allows the core HRGs to be better representative of activity and costs, while still including these potentially high cost elements separately in the total costs estimation