| Literature DB >> 28936599 |
Dinh Duc Nguyen1,2, Yong Soo Yoon3, Xuan Thanh Bui4,5, Sung Su Kim2, Soon Woong Chang6, Wenshan Guo7, Huu Hao Ngo8.
Abstract
Performance of an electrocoagulation (EC) process in batch and continuous operating modes was thoroughly investigated and evaluated for enhancing wastewater phosphorus removal under various operating conditions, individually or combined with initial phosphorus concentration, wastewater conductivity, current density, and electrolysis times. The results revealed excellent phosphorus removal (72.7-100%) for both processes within 3-6 min of electrolysis, with relatively low energy requirements, i.e., less than 0.5 kWh/m3 for treated wastewater. However, the removal efficiency of phosphorus in the continuous EC operation mode was better than that in batch mode within the scope of the study. Additionally, the rate and efficiency of phosphorus removal strongly depended on operational parameters, including wastewater conductivity, initial phosphorus concentration, current density, and electrolysis time. Based on experimental data, statistical model verification of the response surface methodology (RSM) (multiple factor optimization) was also established to provide further insights and accurately describe the interactive relationship between the process variables, thus optimizing the EC process performance. The EC process using iron electrodes is promising for improving wastewater phosphorus removal efficiency, and RSM can be a sustainable tool for predicting the performance of the EC process and explaining the influence of the process variables.Entities:
Keywords: Electrocoagulation; Energy consumption; Iron electrode; Phosphorus removal; Response surface methodology
Mesh:
Substances:
Year: 2017 PMID: 28936599 DOI: 10.1007/s11356-017-0180-2
Source DB: PubMed Journal: Environ Sci Pollut Res Int ISSN: 0944-1344 Impact factor: 4.223