Literature DB >> 27453440

Process Optimization to Improve Immunosuppressant Drug Testing Turnaround Time.

Vilte E Barakauskas1, Tiffany A Bradshaw2, Lonnie D Smith3, Christopher M Lehman4, Kamisha L Johnson-Davis5.   

Abstract

OBJECTIVES: Timely reporting of immunosuppressant (ISP) drug level results is needed for transplant patient management. This study characterized the local ISP testing process, identified bottlenecks and implemented process improvements to meet turnaround time requirements.
METHODS: Laboratory information time stamps, direct observation and discussion with staff were used to construct a value stream map of the ISP testing process to identify process bottlenecks. Improvements were implemented to attain the required turnaround time.
RESULTS: Baseline performance of the existing ISP process (seven weeks, n = 272 samples) indicated that only 28% of samples were reported by 2:00 pm Major bottlenecks were identified to be the analytical run schedule, instrument delays, difficulty identifying ISP samples at intake, and difficulty collecting specimens. Process changes resulted in a median of 76% samples reported by 2:00 pm
CONCLUSIONS: : Adjusting ISP collection and analysis processes improved the laboratory's ability to meet physician requested result reporting time of 2:00 pm. © American Society for Clinical Pathology, 2016. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

Entities:  

Keywords:  Hospital laboratory; Immunosuppressants; Process improvement; Process optimization; Run chart; Turnaround time; Value stream map

Mesh:

Substances:

Year:  2016        PMID: 27453440     DOI: 10.1093/ajcp/aqw087

Source DB:  PubMed          Journal:  Am J Clin Pathol        ISSN: 0002-9173            Impact factor:   2.493


  2 in total

Review 1.  The Role of Value Stream Mapping in Healthcare Services: A Scoping Review.

Authors:  Juan A Marin-Garcia; Pilar I Vidal-Carreras; Julio J Garcia-Sabater
Journal:  Int J Environ Res Public Health       Date:  2021-01-22       Impact factor: 3.390

2.  Timely delivery of laboratory efficiency information, Part II: Assessing the impact of a turn-around time dashboard at a high-volume laboratory.

Authors:  Naseem Cassim; Lindi M Coetzee; Manfred E E Tepper; Louella Perelson; Deborah K Glencross
Journal:  Afr J Lab Med       Date:  2020-04-23
  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.