| Literature DB >> 27139697 |
Sang-Bing Tsai1,2,3,4, Chih-Yao Huang5, Cheng-Kuang Wang1,3, Quan Chen1, Jingzhou Pan6, Ge Wang7, Jingan Wang1, Ta-Chia Chin8, Li-Chung Chang1,9.
Abstract
R&D professionals are the impetus behind technological innovation, and their competitiveness and capability drive the growth of a company. However, high-tech industries have a chronic shortage of such indispensable professionals. Accordingly, reducing R&D personnel turnover has become a major human resource management challenge facing innovative companies. This study combined importance-performance analysis (IPA) with the decision-making trial and evaluation laboratory (DEMATEL) method to propose an IPA-DEMATEL model. Establishing this model involved three steps. First, an IPA was conducted to measure the importance of and satisfaction gained from job satisfaction criteria. Second, the DEMATEL method was used to determine the causal relationships of and interactive influence among the criteria. Third, a criteria model was constructed to evaluate job satisfaction of high-tech R&D personnel. On the basis of the findings, managerial suggestions are proposed.Entities:
Mesh:
Year: 2016 PMID: 27139697 PMCID: PMC4854457 DOI: 10.1371/journal.pone.0154071
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Importance–performance grid.
Importance and performance of R&D personnel job satisfaction criteria.
| Item | Criteria | Importance | Performance | Management Strategy |
|---|---|---|---|---|
| a1 | Compensation | 7.8 | 6.2 | Concentrate Here |
| a2 | Promotion | 7.5 | 7.3 | Keep up the Good Work |
| a3 | Supervisors | 6.7 | 6.8 | Possible Overkill |
| a4 | Fringe benefits | 6.9 | 6.5 | Concentrate Here |
| a5 | Recognition | 6.7 | 6.8 | Possible Overkill |
| a6 | Work environment | 6.9 | 6.9 | Keep up the Good Work |
| a7 | Regulations and policies | 6.4 | 6.5 | Low Priority |
| a8 | Coworkers | 6.3 | 6.4 | Low Priority |
| a9 | Job nature | 7.0 | 6.8 | Keep up the Good Work |
| a10 | Communication | 6.6 | 6.2 | Low Priority |
| Mean | 6.88 | 6.64 |
Initial direct-relation matrix X.
| Criteria | a1 | a2 | a3 | a4 | a5 | a6 | a7 | a8 | a9 | a10 |
|---|---|---|---|---|---|---|---|---|---|---|
| a1 | 0 | 5.2 | 6.8 | 7.8 | 6.8 | 3.2 | 4.1 | 2.4 | 7.3 | 5.2 |
| a2 | 7.4 | 0 | 6.2 | 6.1 | 8.2 | 2.8 | 5.8 | 4.2 | 7.3 | 3.7 |
| a3 | 4.8 | 2.7 | 0 | 6.6 | 4.3 | 0.8 | 4.1 | 1.7 | 4.7 | 3.8 |
| a4 | 4.4 | 1.9 | 4.9 | 0 | 0.7 | 0.8 | 0 | 0 | 1.4 | 1.0 |
| a5 | 0 | 0 | 1.2 | 3.3 | 0 | 1.8 | 0.9 | 3.4 | 0 | 0 |
| a6 | 1.8 | 1.9 | 2.3 | 1.9 | 0 | 0 | 0 | 0 | 2.7 | 2.2 |
| a7 | 0 | 0 | 2.1 | 0 | 0.9 | 0 | 0 | 1.2 | 0 | 0 |
| a8 | 0 | 0 | 2.4 | 0 | 2.3 | 0 | 0 | 0 | 1.2 | 1.7 |
| a9 | 8.2 | 7.9 | 7.8 | 8.2 | 5.2 | 2.8 | 4.3 | 4.1 | 0 | 4.9 |
| a10 | 0 | 0 | 4.7 | 3.3 | 4.1 | 2.1 | 2.4 | 1.7 | 2.8 | 0 |
Normalized direct-relation matrix T.
| Criteria | a1 | a2 | a3 | a4 | a5 | a6 | a7 | a8 | a9 | a10 |
|---|---|---|---|---|---|---|---|---|---|---|
| a1 | 0.00 | 0.10 | 0.13 | 0.15 | 0.13 | 0.06 | 0.08 | 0.04 | 0.14 | 0.10 |
| a2 | 0.14 | 0.00 | 0.12 | 0.11 | 0.15 | 0.05 | 0.11 | 0.08 | 0.14 | 0.07 |
| a3 | 0.09 | 0.05 | 0.00 | 0.12 | 0.08 | 0.01 | 0.08 | 0.03 | 0.09 | 0.07 |
| a4 | 0.08 | 0.04 | 0.09 | 0.00 | 0.01 | 0.01 | 0.00 | 0.00 | 0.03 | 0.02 |
| a5 | 0.00 | 0.00 | 0.02 | 0.06 | 0.00 | 0.03 | 0.02 | 0.06 | 0.00 | 0.00 |
| a6 | 0.03 | 0.04 | 0.04 | 0.04 | 0.00 | 0.00 | 0.00 | 0.00 | 0.05 | 0.04 |
| a7 | 0.00 | 0.00 | 0.04 | 0.00 | 0.02 | 0.00 | 0.00 | 0.02 | 0.00 | 0.00 |
| a8 | 0.00 | 0.00 | 0.04 | 0.00 | 0.04 | 0.00 | 0.00 | 0.00 | 0.02 | 0.03 |
| a9 | 0.15 | 0.15 | 0.15 | 0.15 | 0.10 | 0.05 | 0.08 | 0.08 | 0.00 | 0.09 |
| a10 | 0.00 | 0.00 | 0.09 | 0.06 | 0.08 | 0.04 | 0.04 | 0.03 | 0.05 | 0.00 |
Total-relation criteria matrix T.
| Criteria | a1 | a2 | a3 | a4 | a5 | a6 | a7 | a8 | a9 | a10 | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| a1 | 0.11 | 0.17 | 0.25 | 0.27 | 0.23 | 0.11 | 0.15 | 0.11 | 0.22 | 0.17 | 1.80 |
| a2 | 0.23 | 0.08 | 0.25 | 0.25 | 0.26 | 0.10 | 0.18 | 0.15 | 0.22 | 0.15 | 1.88 |
| a3 | 0.15 | 0.10 | 0.10 | 0.21 | 0.16 | 0.05 | 0.13 | 0.08 | 0.15 | 0.12 | 1.25 |
| a4 | 0.12 | 0.07 | 0.14 | 0.06 | 0.06 | 0.04 | 0.04 | 0.03 | 0.07 | 0.06 | 0.69 |
| a5 | 0.01 | 0.01 | 0.04 | 0.07 | 0.01 | 0.04 | 0.02 | 0.07 | 0.01 | 0.01 | 0.31 |
| a6 | 0.07 | 0.06 | 0.09 | 0.08 | 0.04 | 0.02 | 0.03 | 0.02 | 0.08 | 0.07 | 0.58 |
| a7 | 0.01 | 0.00 | 0.05 | 0.01 | 0.02 | 0.00 | 0.01 | 0.03 | 0.01 | 0.01 | 0.14 |
| a8 | 0.01 | 0.01 | 0.06 | 0.02 | 0.06 | 0.01 | 0.01 | 0.01 | 0.03 | 0.04 | 0.28 |
| a9 | 0.26 | 0.22 | 0.29 | 0.30 | 0.22 | 0.11 | 0.17 | 0.15 | 0.12 | 0.18 | 2.00 |
| a10 | 0.04 | 0.03 | 0.13 | 0.11 | 0.11 | 0.06 | 0.07 | 0.06 | 0.08 | 0.03 | 0.71 |
| 1.02 | 0.75 | 1.40 | 1.40 | 1.19 | 0.54 | 0.81 | 0.70 | 1.00 | 0.83 |
Prominence and relation results obtained through DEMATEL.
| Criteria | ||||
|---|---|---|---|---|
| a1 | 1.80 | 1.02 | 2.81 | 0.78 |
| a2 | 1.88 | 0.75 | 2.63 | 1.13 |
| a3 | 1.25 | 1.40 | 2.65 | -0.15 |
| a4 | 0.69 | 1.40 | 2.09 | -0.71 |
| a5 | 0.31 | 1.19 | 1.50 | -0.88 |
| a6 | 0.58 | 0.54 | 1.11 | 0.04 |
| a7 | 0.14 | 0.81 | 0.95 | -0.67 |
| a8 | 0.28 | 0.70 | 0.98 | -0.42 |
| a9 | 2.00 | 1.00 | 3.00 | 1.00 |
| a10 | 0.71 | 0.83 | 1.55 | -0.12 |
| Mean | 1.93 | 0.00 |
Fig 2Interactive influence among the 10 criteria.