| Literature DB >> 26949488 |
June Sang Chun1, Alix Har2, Hyun-Pil Lim3, Hoi-Jeong Lim4.
Abstract
PURPOSE: This study conducted an analysis of cost-effectiveness of the implant and conventional fixed dental prosthesis (CFDP) from a single treatment perspective.Entities:
Keywords: CFDP; Cost-effectiveness; Cost-effectiveness acceptability curve; Implant; Markov model; Monte-Carlo simulation; QAPY
Year: 2016 PMID: 26949488 PMCID: PMC4769890 DOI: 10.4047/jap.2016.8.1.53
Source DB: PubMed Journal: J Adv Prosthodont ISSN: 2005-7806 Impact factor: 1.904
Fig. 1Markov model framework.
QAPY evaluated from patient's satisfaction survey on Implant, CFDP, and Missing Tooth
| Level of Satisfaction (Score) | Implant | CFDP* | Missing Tooth | ||||||
|---|---|---|---|---|---|---|---|---|---|
| A (%)† | F (%)† | P (%)† | A (%)† | F (%)† | P (%)† | A (%)† | F (%)† | P (%)† | |
| Strongly satisfied (5)‡ | 92 | 82 | 92 | 26 | 32 | 44 | 6 | 8 | 28 |
| Satisfied (4)‡ | 8 | 8 | 8 | 54 | 38 | 48 | 34 | 20 | 52 |
| Neutral (3)‡ | 0 | 10 | 0 | 18 | 24 | 8 | 20 | 22 | 14 |
| Dissatisfied (2)‡ | 0 | 0 | 0 | 2 | 6 | 0 | 38 | 50 | 6 |
| Strongly dissatisfied (1)‡ | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 |
| Total Score = ∑(Score × percent) | 492 | 472 | 492 | 404 | 396 | 436 | 304 | 286 | 402 |
| WA = ∑(Score × percent) / 1500 | WA (I) = 0.97067 | WA (C) = 0.82400 | WA (M) = 0.66133 | ||||||
| QAPY§ | 0.91339 | 0.48031 | 0 | ||||||
*CFDP (conventional fixed dental prosthesis).
†A (aesthetic), F (function), P (phonation)
‡Referred to Al-Quran et al. (2011)
§QAPY = (WA (I) - WA (M)) / (1 - WA (M)) for Implant; QAPY = (WA (C) - WA (M)) / (1 - WA (M)) for CFDP
Where WA: Weighted Average
Fig. 2Cost-effectiveness acceptability curve according to time horizon up to 5 year, 10 year, 20 year, 50 year; (A) Direct cost, (B) Total cost.
Average management cost of the complications (Korean Won)
| Complications | Treatments | Direct Costs† | Indirect Costs | Total Costs | |
|---|---|---|---|---|---|
| Implant | Bone loss > 2 mm | GBR*, etc | 252,638 | 86,580.9 | 339,218.9 |
| Soft tissue complications | Curettage, Laser therapy | 20,176 | 38,735.23 | 58,911.23 | |
| Aesthetic complications | Crown remake | 740,850 | 66,071.26 | 806,921.26 | |
| Implant fracture | Failure | 57,330 | 35,005.16 | 92,335.16 | |
| Abutment or screw fracture | Abutment or screw changing | 16,000 | 35,005.16 | 51,005.16 | |
| Loose abutments or screw | Tightening | 10,000 | 35,005.16 | 45,005.16 | |
| Loss of retention | Re-cementation | 10,000 | 35,005.16 | 45,005.16 | |
| Ceramic chipping | Crown remake | 740,850 | 66,071.26 | 806,921.26 | |
| Framework fracture | Crown remake | 740,850 | 66,071.26 | 806,921.26 | |
| CFDP* | Caries of abutment teeth | Caries removal & re-CFDP* | 1,360,615 | 56,639.68 | 1,417,254.68 |
| CFDPs* lost (caries) | Failure | 17,526 | 28,799.43 | 46,325.43 | |
| Loss of abutment teeth vitality | RCT* & re-CFDP* | 1,370,492 | 145,430.65 | 1,515,922.65 | |
| CFDPs* lost (periodontal disease) | Failure | 17,526 | 28,799.43 | 46,325.43 | |
| Loss of retention | Re-cementation | 7,636 | 35,625.16 | 43,261.16 | |
| CFDPs* lost (abutment tooth fracture) | Failure | 17,526 | 28,799.43 | 46,325.43 | |
| Fractures of material | Re-CFDP* | 1,300,492 | 57,867.12 | 1,358,359.12 |
*CFDP (conventional fixed dental prosthesis), GBR (guided bone regeneration), RCT (root canal therapy)
†The costs were averaged over all the management costs of specialist and generalist. These were calculated from medical histories of outpatients which were collected for a period of one year (2013) at Chonnam National University Dental Hospital. The number of patients was 3,051.
Incremental cost-effectiveness ratios of implant versus conventional fixed dental prosthesis
| (a) Direct cost | |||||||
|---|---|---|---|---|---|---|---|
| Cost* | Effectiveness† | CE‡ | IC* | IE† | ICER‡ | ||
| 0 year | Implant | 1,441,776 | 0.91 | 1,587,379 | 83,608 | 0.43 | 194,437 |
| CFDP | 1,358,168 | 0.47 | 2,860,876 | ||||
| 5 year | Implant | 1,539,254 | 5.06 | 303,946 | 34,082 | 2.45 | 13,911 |
| CFDP | 1,505,172 | 2.62 | 575,537 | ||||
| 10 year | Implant | 1,623,212 | 8.64 | 187,788 | -5,443 | 4.23 | -1,287 |
| CFDP | 1,628,655 | 4.41 | 369,037 | ||||
| 20 year | Implant | 1,757,813 | 14.38 | 122,218 | -61,693 | 7.19 | -8,580 |
| CFDP | 1,819,506 | 7.19 | 252,983 | ||||
| 50 year | Implant | 1,981,918 | 24.94 | 79,476 | -128,604 | 12.63 | -10,182 |
| CFDP | 2,110,522 | 12.43 | 169,797 | ||||
| *Korean won; †Quality-adjusted prosthesis year; ‡Korean won per Quality-adjusted prosthesis year | |||||||
*Korean won; †Quality-adjusted prosthesis year; ‡Korean won per Quality-adjusted prosthesis year
Fig. 3(A) Cost-effectiveness acceptability curve according to time horizon up to 5 year, (B) Scatter plot of the bootstrapped incremental cost and incremental effectiveness (QAPY) pairs for Implant vs. CFDP.