| Literature DB >> 26744603 |
Piotr Kasina1, Ann Tammelin2, Anne-Marie Blomfeldt1, Bengt Ljungqvist3, Berit Reinmüller3, Carin Ottosson1.
Abstract
BACKGROUND: Lowering air-borne bacteria counts in the operating room is essential in prevention of surgical site infections in orthopaedic joint replacement surgery. This is mainly achieved by decreasing bacteria counts through dilution, with appropriate ventilation and by limiting the bacteria carrying skin particles, predominantly shed by the personnel. The aim of this study was to investigate if a single use polypropylene clothing system or a reusable polyester clothing system could offer similar air quality in the operating room as a mobile laminar airflow device-assisted reusable cotton/polyester clothing system.Entities:
Keywords: Air-borne bacteria; Operating room; Orthopaedic surgery; Surgical clothing; Ventilation
Year: 2016 PMID: 26744603 PMCID: PMC4704420 DOI: 10.1186/s13037-015-0091-4
Source DB: PubMed Journal: Patient Saf Surg ISSN: 1754-9493
Results from 13 operations performed with staff dressed in Mertex P-3477, Textilia AB with two TOUL devices
| Operation | Nr of persons in OR | Operation | CFU/m3 | Measurements/excluded (reason) | ||
|---|---|---|---|---|---|---|
| Median | Mean | Min - Max | ||||
| 1 | 6 | Uncemented THR | 6.0 | 6.5 | 3–12 | 6/0 |
| 2 | 6 | Cemented THR | 55.0 | 63.8 | 23–100 | 7/1 (fluid on filter) |
| 3 | 6 | Cemented THR | 23.0 | 22.7 | 15–30 | 7/1 (fluid on filter) |
| 4 | 6 | Cemented THR | 33.0 | 43.4 | 21–100 | 7/2 (1 condensate, 1 damaged filter) |
| 5 | 6 | Cemented THR | 8.0 | 18.5 | 7–18 | 7/3 (condensate) |
| 6 | 6 | Cemented THR | 15.0 | 22.2 | 8–55 | 6/0 |
| 7 | 6 | Cemented THR | 8.0 | 10.8 | 6–20 | 6/1 (condensate) |
| 8 | 6 | Hybrid THR | 46.0 | 61.3 | 23–148 | 7/0 |
| 9 | 6 | Cemented THR | 42.0 | 40.9 | 17–58 | 7/0 |
| 10 | 6 | Cemented THR | 24.0 | 24.9 | 12–40 | 7/0 |
| 11 | 6 | Cemented THR | 16.0 | 16.3 | 6–24 | 7/1 (condensate) |
| 12 | 6 | Uncemented THR | 8.5 | 10.2 | 6–17 | 7/1 (damaged filter) |
| 13 | 6 | Cemented THR | 13.0 | 12.7 | 1–28 | 7/0 |
OR Operating Room, CRU Colony Forming Units, THR Total Hip Replacement
Results from 13 operations performed with staff dressed in Olefin, Textilia AB
| Operation | Nr of persons in OR | Operation | CFU/m3 | Measurements/excluded (reason) | ||
|---|---|---|---|---|---|---|
| Median | Mean | Min - Max | ||||
| 1 | 6 | Uncemented THR | 36.5 | 37.0 | 20–57 | 6/0 |
| 2 | 6 | Cemented THR | 2.5 | 2.7 | 0–6 | 6/0 |
| 3 | 6 | Cemented THR | 112.0 | 177.0 | 44–188 | 6/0 |
| 4 | 6 | Cemented THR | 66.0 | 106.0 | 50–228 | 6/0 |
| 5 | 6 | Cemented THR | 17.5 | 20.7 | 1–40 | 6/0 |
| 6 | 6 | Cemented THR | 5.0 | 7.3 | 1–18 | 7/1 (fluid on filter) |
| 7 | 8 | Cemented THR | 37.5 | 35.2 | 22–48 | 6/0 |
| 8 | 8 | Hybrid THR | 22.5 | 24.5 | 14–40 | 6/0 |
| 9 | 8 | Cemented THR | 7.0 | 8.0 | 2–16 | 8/2 (1 damaged filter, 1 tactile contamination) |
| 10 | 9 | Cemented THR | a | a | a(2–6) | 7/4 (condensate) |
| 11 | 8 | Cemented THR | a | a | a(2) | 7/6 (condensate) |
| 12 | 6 | Uncemented THR | a | a | a(4–6) | 7/5 (condensate) |
| 13 | 6 | Cemented THR | 22.5 | 25.0 | 10–45 | 7/3 (condensate) |
OR Operating Room, CRU Colony Forming Units, THR Total Hip Replacement
aExcluded from analysis due to >1/2 excluded measurements of each operation
Results from 13 operations performed with staff dressed in BARRIER® Clean Air Suit, Mölnlycke Health Care
| Operation | Nr of persons in OR | Operation | CFU/m3 | Measurements/excluded (reason) | ||
|---|---|---|---|---|---|---|
| Median | Mean | Min - Max | ||||
| 1 | 9 | Uncemented THR | 7.0 | 7.3 | 3–14 | 6/0 |
| 2 | 8 | Cemented THR | 3.0 | 3.0 | 0–8 | 7/1 (fluid on filter) |
| 3 | 8 | Cemented THR | 6.0 | 7.8 | 3–18 | 7/2 (1 fluid on filter, 1 condensate) |
| 4 | 8 | Cemented THR | 6.5 | 7.8 | 2–16 | 6/0 |
| 5a | 8 | Cemented THR | 5.0 | 6.7 | 3–13 | 7/1 (fluid on filter) |
| 6 | 8 | Cemented TKR | 26.0 | 29.3 | 17–45 | 7/1 (fluid on filter) |
| 7 | 8 | Cemented TKR | 28.5 | 30.0 | 11–50 | 6/0 |
| 8 | 8 | Hybrid THR | 22.5 | 20.0 | 5–35 | 6/0 |
| 9 | 8 | Cemented THR | 23.5 | 80.5 | 1–280 | 6/0 |
| 10 | 7 | Cemented THR | 47.5 | 46.3 | 25–71 | 7/1 (damaged filter) |
| 11 | 8 | Cemented THR | 10.0 | 10.0 | 13–19 | 6/0 |
OR Operating Room, CRU Colony Forming Units, THR Total Hip Replacement, TKR Total Knee Replacement
a1 door opening
Comparison of all tree clothing systems
| Clothing system | CFU/m3 |
| ||
|---|---|---|---|---|
| Median | Mean | Min - Max | ||
| Mertex P-3477 + two TOUL devices | 20.0 | 27.9 | 1–148 | - |
| Olefin clothing | 22.5 | 38.8 | 0–228 | 0.622 |
| BARRIER® Clean Air Suit | 12.0 | 22.8 | 0–280 | 0.009 |
CFU Colony Forming Units
aAs compared to TOUL-assisted Mertex P-3477 clothing