Literature DB >> 25838919

Pharmaceutical supply chain risk assessment in Iran using analytic hierarchy process (AHP) and simple additive weighting (SAW) methods.

Mona Jaberidoost1, Laya Olfat2, Alireza Hosseini3, Abbas Kebriaeezadeh4, Mohammad Abdollahi4, Mahdi Alaeddini5, Rassoul Dinarvand6.   

Abstract

OBJECTIVES: Pharmaceutical supply chain is a significant component of the health system in supplying medicines, particularly in countries where main drugs are provided by local pharmaceutical companies. No previous studies exist assessing risks and disruptions in pharmaceutical companies while assessing the pharmaceutical supply chain. Any risks affecting the pharmaceutical companies could disrupt supply medicines and health system efficiency. The goal of this study was the risk assessment in pharmaceutical industry in Iran considering process's priority, hazard and probability of risks.
METHODS: The study was carried out in 4 phases; risk identification through literature review, risk identification in Iranian pharmaceutical companies through interview with experts, risk analysis through a questionnaire and consultation with experts using group analytic hierarchy process (AHP) method and rating scale (RS) and risk evaluation of simple additive weighting (SAW) method.
RESULTS: In total, 86 main risks were identified in the pharmaceutical supply chain with perspective of pharmaceutical companies classified in 11 classes. The majority of risks described in this study were related to the financial and economic category. Also financial management was found to be the most important factor for consideration.
CONCLUSION: Although pharmaceutical industry and supply chain were affected by current political conditions in Iran during the study time, but half of total risks in the pharmaceutical supply chain were found to be internal risks which could be fixed by companies, internally. Likewise, political status and related risks forced companies to focus more on financial and supply management resulting in less attention to quality management.

Entities:  

Keywords:  Iran pharmaceutical industry; Pharmaceutical supply chain; Risk assessment; Simple additive weighting (SAW) method; analytic hierarchy process (AHP) method

Year:  2015        PMID: 25838919      PMCID: PMC4354976          DOI: 10.1186/s40545-015-0029-3

Source DB:  PubMed          Journal:  J Pharm Policy Pract        ISSN: 2052-3211


Introduction

Medicines Supply is one of the major priorities in developing countries. Therefore efficient pharmaceutical supply chain management is of high importance [1,2]. The efficient pharmaceutical supply chain supplies medicines in the right quantity, and to the customers with the acceptable quality, at the proper time and with optimum price to produce benefits for all the stakeholders [2,3]. The pharmaceutical supply chain is a significant component of the health scheme which includes all procedures, information, resources and players such as suppliers, manufacturers, intermediaries, third-party service providers, logistics activities, merchandising and sales activities, finance and information technology [2,4]. Pharmaceutical companies play an important role in supplying medicines, particularly in countries where the volume is supplied by local companies [5]. Pharmaceutical companies in Iran are important players in the supply chain as more than 95% of drug market in Iran (in terms of volume) is supplied by local manufacturers [6]. In this context, any risks affecting the pharmaceutical companies could disrupt the supply of medicines and affect the health system efficiency [7,8]. Local pharmaceutical companies face several risks and vulnerabilities due to nature of Pharmaceutical industry and its complex processes in one hand and political condition of Iran in the other hand [2,6,9,10]. In addition, medicine is a highly regulated good and under the controls and restrictions of public regulatory authorities [2,11,12]. To overcome supply chain vulnerabilities, it is essential to identify and prioritize obstacles to create best practice for proper configuration and adaptability in pharmaceutical industry [13,14]. Supply chain risk management can help organizations to monitor the expecting hazards and control possible risks and thus improve efficiency of the supply chain [15]. This approach can help to improve and build up business processes, prevent potential problems, minimize loss of commercial enterprise, reduce costs and liability, protect the supply chain and avoid waste [16,17]. Referring to International Conference on Harmonization (ICH) Q9 definition; risk assessment is defined as “A systematic process of organizing information to support a risky decision to be made within a risk management process. It consists of the identification of hazards and the analysis and evaluation of risks associated with exposure to those hazards.” The risk identification stage represents an important initiating point in the overall risk management process and forms the basis for the next stages [18]. Potential hazards which are outputs from the risk identification stage will be subject to detailed scrutiny during the hazard analysis and evaluation stages [19,20]. At the following step as risk analysis, level of risk in terms of severity of hazard, the likelihood of occurrence and detection should be estimated that provides a quantitative idea of each risk. And at the last step of risk assessment, output of risk analysis should be organized (filtered, ranked and etc.) and most significant risks should be highlighted and identified for risk management strategies [21-23]. There are several reports which report risks in the pharmaceutical supply chain and some of them attempted to quantify or measure them [2,6,16,24]. Supply and supplier issue, fragmentation, delivery reliability, information flow, quality management system, inventory management, customer service disruption, research and development, skill of workers, planning, organization and processes, company strategies, production cost and waste management, fiscal management, currency rate, logistic, demand, regulations are some topics which were described in previous studies as source of risks for pharmaceutical companies. The objectives of this study were to identify and categorize pharmaceutical supply chain risks with perspective of local companies. In addition, main risks of supply chain functions in local companies were measured considering priority of functions, hazard and probability of risks in pharmaceutical supply chain.

Methods

This study was carried out in four phases; risk identification through literature review (carried out on September 2012), risk identification in Iranian pharmaceutical companies through interview with experts, risk analysis through questionnaire, risk evaluation (carried out from November 2012 till December 2013). Phase 1: A literature review to identify pharmaceutical supply chain risks; a systematic review via scientific search engines, Scopus, PubMed, Web of Science and Google scholar, was done for risk identification by several keywords; Supply chain management, risk, risk management, risk assessment, pharmaceutical, pharmaceutical industry, Iran. Also investigating in each data base was done based on data base characteristics and Medical Subject Headings (MeSH) was noted when searching via PubMed. In addition, categorization of pharmaceutical supply chain processes and functions was investigated in the literatures, in this phase. All studies were screened through 4 steps: Reviewing reports and non-relevant articles were excluded considering outcome of interests and scope of the study; Excluding duplicated articles; Excluding non-relevant articles, based on abstract review Finally, full texts of all remained studies were investigated and some of articles were excluded by outcome of interest. This study focused on pharmaceutical supply chain risk management with perspective of the production manufacturers so, studies with consumer safety, environmental risk management, health policy and third parties’ subject were eliminated. Phase 2: Risk identification in Iran pharmaceutical companies through expert opinion with an open questionnaire; for identifying pharmaceutical supply chain risks in Iran, investigation risks through expert opinion was carried out. In this step, a group of 16 experts who had at least 5 years experience in pharmaceutical industry management was selected to interview for risk identification. It is trying to select experts from different kind of companies and organizations with different ownerships and field of work to cover all points of view in the Iran’s pharmaceutical industry. Before each interview, an introductory letter and open questionnaire, which was validated in the pilot study, were sent to experts. 1–2.5 hour interview with each expert was carried out and the questions related to risks and best practice for categorization of pharmaceutical supply chain processes and functions were asked. After coding and extracting risks from questionnaires, a summary of interview and identified risks were sent to interviewees for review and final confirmation. Phase 3: Risk analysis through a questionnaire and interview with experts; all risks extracted from literature review and expert interview (phase 1 and 2) collected in a questionnaire for risk analysis. The questionnaire was designed in two parts with two tables; first part included a table for pair wise comparison to prioritize supply chain functions based on group AHP method and the second part included a table for scoring hazard of risks on supply chain functions and probability of risks in Iran pharmaceutical industry simultaneously by 0–10 rating scale. A questionnaire was validated by 3 experts in the pilot study before sending a questionnaire to the experts. After sending questionnaires to the experts, an interview meeting was set with each expert to fill questionnaire in the face to face interview meeting. Except one, all questionnaires were responded by the expert team. Phase 4: Risk evaluation; risk evaluation was based on considering three factors; probability of risks, hazards of risks on each function in supply chain and priority of managing supply chain functions. AHP group decision making method was selected for prioritizing functions in the supply chain and rating scale was selected for scoring hazard of risks on functions of the supply chain and probability of risks in Iran pharmaceutical industry. After gathering the data, simple additive weighting (SAW) method was applied for evaluation. Figure 1 shows a risk assessment process which is applied in this study.
Figure 1

Risk assessment process.

Risk assessment process. Rating scale: A rating scale is widely used in studies by applying questionnaires to elicit information about a quantitative or a qualitative attribute. In this method, a person selects the number which is considered to reflect the intensity to an item [25]. AHP group decision making: AHP is a type of multi attribute decision making (MADM) introduced by Thomas L Saaty (1971) which helps in complex decision making involving multiple scenarios, criteria and actors [26]. AHP is selected because it allows decision-makers to model a complex problem in a hierarchical structure with considering goals and criteria [27]. In AHP, pairwise comparisons are used to determine preferences between criteria or alternatives [28] (Table 1).
Table 1

The AHP Pair-wise comparison values or scale of preference between two elements

Preference weights or level of importance (value of a ij ) Definition of verbal scale Explanation
aij = 1If the two criteria are equally preferredTwo activities or criteria contribute equally to the objective or goal
aij = 3If criteria i is moderately preferred than criteria jExperience and judgment slightly favor criteria over another
aij = 5If criteria i is strongly preferred than criteria jExperience and judgment strongly favor one criteria over another
aij = 7If criteria i is very strongly preferred than criteria jAn criteria is strongly favored over another and its importance demonstrated in practice
aij = 9If criteria i is absolutely preferred than criteria jThe evidence favoring one criteria over another is of the highest degree possible of affirmation
2,4,6,8Intermediate valuesUse to compromise between two judgments
The AHP Pair-wise comparison values or scale of preference between two elements In this study group, decision AHP is applied in which comparative judgment of all decision makers gathered and aggregated. So, using aggregation functions in group AHP method makes it more applicable than AHP [29]. Four basic steps are needed to apply the AHP method; hierarchy construction, individual comparative judgments (pairwise comparison), aggregation of judgment by the geometric average between each judgment of decision makers, and then synthesizing the results [30]. Typically, hierarchy is structured from the top (goal) to the end (criteria or alternative) which the goal is finding the most appropriate criteria or alternative among others based on the weight of each criteria or alternative. In fact the group AHP method based on the pairwise comparison tries to find differences between criteria or alternatives and obtain the weight of each objective. The goal of this research was to evaluate and prioritize management of supply chain functions from a pharmaceutical production company perspective. Below steps are defined based on the group AHP approach, to prioritize pharmaceutical supply chain functions: Hierarchy construction: hierarchy structure of supply chain functions which categorized into 5 group ups by experts was drawn (Figure 2).
Figure 2

Hierarchy structure of pharmaceutical supply chain risks.

Hierarchy structure of pharmaceutical supply chain risks. Comparative judgments (pairwise comparison): after developing the structure, pairwise comparisons were done by experts through questionnaires to determine the relative importance of the function management in the pharmaceutical supply chain. Aggregation of comparative judgment: using geometric average Synthesize the results to find the overall score of each function [31] Simple additive weighting (SAW) method: SAW is a simple and most applicable multi-attribute decision method which is known as a weighted linear combination or scoring technique. This method is based on the weighted average and an evaluation score is measured by multiplying the normalized value of each criteria for the objectives with the importance of the criteria. Then the objectives could be ranked and objective with the highest score is selected as the preferred one [32]. Based on SAW technique, final score of each risk is calculated and ranked as follow [33]: Where Si is total score of the ith objective; rijis the normalized rating of the ith objective for the jth criterion, wi is the importance (weight) of the ith criterion; N is the number of objectives; M is the number of criterion; Based on this method, final risk scores were calculated considering the average probability of risks, the average hazard of risks on each function and priority of supply chain functions. Expert choice version 11 was applied for AHP analysis and Microsoft Excel was applied to calculations based on SAW method.

Results

Outcome of interest

Supply chain risk identification and assessment from pharmaceutical production company’ perspective was defined as the outcome of interest in this study. So, consumer safety, environmental, health policy and third party perspective were not considered. Phase 1: based on the systematic review on risk identification which was done, after reviewing abstracts, none-relevant studies were excluded. Finally, 28 studies from Google scholar, 10 studies from Web of Science, 44 studies from Scopus and 12 studies from PubMed were evaluated. Full 94 studies were reviewed and 85 out of 94 were eliminated by outcomes of interest. At the end, 9 articles included in the analysis for risk extraction. Out of these 9 studies, 50 “risks” were identified from the literature from the literature which categorized into 7 main categories; categories were systematic review; supply and supplier issues, organization and strategy issues, financial, logistical, political, market and regulatory issues. Most mentioned items in articles which reported as risk were related to supply and suppliers [33] (Table 2).
Table 2

Risks identified through systematic review with their frequency of reporting

Category Risks No. Category Risks No. Category Risks No.
Supply & suppliers issuesSupply and supplier issue6Supply & suppliers issuesFlexibility in product variety1Financial issuesTax payable change3
Partnership with supplier3Timely delivery1Currency rate3
Raw material quality2Quality management system1Financial risks3
Ordering cycle time2Organization & strategies issuesCustomer services disruption1Tariff policies changes1
Contract & agreements2Inventory management4Costs related to supply1
Customization of supplier2Operation issues3Cash Flow1
Certificate of good manufacturing practices (GMP)2R & D2Interest rate1
Flexibility of supplier2Skill of workers2Market issuesMarket2
Fragmentation1Strategy2Consumers taste2
Delivery reliability1Planning issues2Demand2
Environmental assessment1Information flow1Political issuesNatural disasters & Terrorism3
Technology level1Visibility on stock1Political issues1
Information systems1Organization & process2Sanction1
Good will1Mergers and acquisition1logistic issuesCounterfeit4
Technology development1Time to market1Transportation3
Flexibility in delivering1waste management1RegulationRegulation6
Flexible quantities1Production cost1
Risks identified through systematic review with their frequency of reporting Phase 2: Totally 442 items as pharmaceutical supply chain risk were mentioned in interviews by experts. After coding and rewording items, 83 items were extracted and considered as “risks” in the pharmaceutical supply chain from production manufacturers perspective. Forty seven out of 83 mentioned risks were reported in the literatures in phase 1. And 36 items out of 83 were new items. After syncing risks from literature and interviews, a list of 86 risks which categorized in 11 groups were identified. Categorization of risks was based on expert opinions which include financial and economic, politics and government, regulatory, company strategies, research and development, supply and suppliers, market and competitors, operation and processes, logistic, human resource, and disaster and accidents. Also, based on the expert’s opinion, supply chain functions in pharmaceuticals were categorized into five groups; financial management, supply management, operation management, sales and quality management. Phase 3: Risk assessment was done by considering 3 factors in second questionnaire. These three factors were priority of supply chain functions, probability of risks and hazard of risks on each function. The pair wise comparison of the supply chain functions shown in Table 3 as well as in Figure 3 indicated that financial management is the most important function to be managed with a priority of 0.380 followed by supply management (0.253), sales management (0.214), operation management (0.092) and quality management (0.062). Overall inconsistency was in the acceptable range (0.02) (Figure 3).
Table 3

All supply chain risks and ranks

Rank Risk Probability(%) Weight Rank Risk Probability(%) Weight
1Sanctions63.930.854311Operational cost53.570.5819
2Money transfer71.070.803612Ordering cycle time48.850.5732
3Interest rate60.360.748213Material cost45.360.5639
4Currency fluctuation62.500.740114MOH policy fluctuation57.860.5368
5Cash flow51.790.715815Money collection44.290.5154
6Unstable policies63.570.676616Banking regulation46.430.5142
7Pricing policies58.930.661617Suppliers conditions43.460.4841
8Inflation rate56.070.641118Managerial knowledge38.850.4812
9Information flow48.570.619019Strategies36.790.4703
10Regulation transparency56.430.607420Economic stagnation48.860.4670
Figure 3

Major decision objectives priorities.

All supply chain risks and ranks Major decision objectives priorities. Average of probability and hazard of risks of supply chain factors which scored by experts through rating scale, were measured. Then, based on SAW method, the weight of each risk considering the priority of supply chain functions (priorities were measured by AHP method), probability of risks and hazard of risks on each function (which obtained from expert opinion through rating scale) was calculated. Table 4 shows a list of risks with their rank, probability and weight.
Table 4

Top 20 risks of financial management function

Rank Risks Weight Rank Risks Weight
1Interest rate1.000011Operational cost0.6728
2Currency fluctuation0.901912Material cost0.6000
3Money transfer0.864113Regulation transparency0.5881
4Sanctions0.862714Ordering cycle time0.5417
5Cash flow0.837215Economic stagnation0.5222
6Inflation rate0.766516Information flow0.4867
7Pricing policies0.700817Suppliers conditions0.4820
8Unstable policies0.688018Return of investment0.4810
9Banking regulation0.676219Managerial knowledge0.4568
10Money collection0.674620Biased interpretation of regulations0.4279
Top 20 risks of financial management function The results showed that the average probability of risks in the pharmaceutical supply chain in Iran is 35.05% and major risks are related to the financial and economical category with a weight of 0.5542, and followed politics and government (0.5171), regulatory (0.3911), strategies (0.3723), research and development (0.3247), supply and suppliers (0.2907), market and competitors (0.2868), operation and process (0.2765), logistic (0.2728), human resource (0.2462) and disaster and accidents (0.0896).51 out of 86 risks are external with an average probability of 36.59% and average weight of 0.3607 and probabilities of internal risk is 32.81% with average weight of 0.3397. Considering probability and hazard of each risk and normalizing numbers, high important risks in each function of supply chain in pharmaceutical companies were measured as below: Interest rate [1], currency fluctuation (0.9018), money transfer (0.8641), sanctions (0.8627), cash flow (0.8372), inflation rate (0.7664), pricing policies (0.7007), unstable policies (0.6880), banking regulation (0.6761) and money collection (0.6745) are top ten risks which have more impact on financial management function in Iran pharmaceutical supply chain. Table 5 shows top 20 risks with high impact on financial management function.
Table 5

Top 20 risks of supply management function

Rank Risks Weight Rank Risks Weight
1Money transfer1.000011Information flow0.5289
2Sanctions0.868212Inflation rate0.5246
3Currency fluctuation0.703513Commercial regulation0.5170
4Cash flow0.639914Limited suppliers0.5125
5Ordering cycle time0.627515MOH policy fluctuation0.4743
6Unstable policies0.614516Banking regulation0.4601
7Interest rate0.612917Biased interpretation of regulations0.4317
8Regulation transparency0.579918Customs regulations0.4237
9Material cost0.566019Supplier commitments0.4047
10Suppliers conditions0.537120Medicine regulations0.4011
Top 20 risks of supply management function Money transfer (1), sanctions (0.8682), currency fluctuation (0.7035), cash flow (0.6399), ordering cycle time (0.6275), unstable policies (0.6144), interest rates (0.6129), regulatory transparency (0.5799), operational cost (0.5660) and suppliers’ conditions (0.5370) are top ten risks which have more impact on supply management function in Iran pharmaceutical supply chain. Table 6 shows top 20 risks with high effect on supply management function.
Table 6

Top 20 risks of sales management function

Rank Risks Weight Rank Risks Weight
1Pricing policies1.000011Operational cost0.6636
2Lobbing0.819912Currency fluctuation0.6576
3Inflation rate0.799313Cash flow0.6503
4Distribution & coverage0.788314New competitors (new medicine or new company)0.6485
5Unstable policies0.776715Interest rate0.6350
6Sanctions0.748516Time to market0.6240
7MOH policy fluctuation0.716717Managerial knowledge0.6197
8Information flow0.692418Strategies0.6180
9Regulation transparency0.689519Competition0.6177
10Product selection0.673320Demand forecasting0.5939
Top 20 risks of sales management function Pricing policies (1), lobbying (0.8199), inflation rate (0.7992), distribution & coverage (0.7883), unstable policies (0.7767), sanctions (0.7485), (Ministry of Health) MOH policy fluctuation (0.7167), information flow (0.6924), regulatory transparency, (0.6895) and product selection (0.6733) are top ten risks which have more impact on sales management in Iran pharmaceutical supply chain. Table 7 shows top 20 risks with high effect on sales management function.
Table 7

Top 20 risks of operation management function

Rank Risks Weight Rank Risks Weight
1Sanctions1.000011Regulation transparency0.6388
2Information flow0.909712Motivation0.6357
3Money transfer0.819213Planning & ordering0.6355
4Operation standers0.757414Currency fluctuation0.6303
5Cash flow0.735415Medicine regulations0.6252
6Inappropriate production process and technology0.688816Location0.6111
7Unstable policies0.680417Raw material quality0.5972
8Ordering cycle time0.663518Human errors0.5948
9Operational cost0.661619Strategies0.5906
10MOH policy fluctuation0.643020Material cost0.5881
Top 20 risks of operation management function Sanctions (1), information flow (0.9097), money transfer (0.8191), operation standers (0.7574), cash flow (0.7354), inappropriate production process and technology (0.6887), unstable policies (0.6803), ordering cycle time (0.6635), operational cost (0.6615) and MOH policy fluctuation (0.6430) are top ten risks which have an impact on operations management function in Iran pharmaceutical supply chain. Table 8 shows top 20 risks with high effect on operations management function.
Table 8

Top 20 risks of quality management function

Rank Risks Weight Rank Risks Weight
1Operation standers1.000011Human errors0.7650
2Raw material quality0.930212knowledge of regulatory people0.7397
3Information flow0.914113Motivation0.7107
4Inappropriate production process and technology0.824814Good storage practices (GSP)0.7022
5Sanctions0.808115Pricing policies0.6952
6Location0.807016Supplier quality specifications0.6638
7In Process quality0.789717Formulation0.6606
8MOH policy fluctuation0.780118Business awareness of regulators0.6156
9Skilled workers0.775319Strategies0.5890
10Medicine regulations0.772020Biased interpretation of regulations0.5490
Top 20 risks of quality management function Operation standers (1), raw material quality (0.9302), information flow (0.9141) inappropriate production process and technology (0.8247), sanctions (0.8080), location (0.8070), in process quality (0.7897), MOH policy fluctuation (0.7800) and skilled workers (0.7752) are top ten risks which were found to have an impact on quality management function in Iran pharmaceutical supply chain. Table 9 shows top 20 risks with high effect on quality management function.
Table 9

Risks probability-hazard chart

High Probability Low Probability
High hazard SanctionCivil war
Cash flowIn process contamination
Information flowNatural disasters
Ordering cycle timeAccidents
Counterfeit
Low hazard Biased interpretation of regulationsHuman resource turnover
Government dependencySupplier agent
LobbingVacations
Mergers and acquisition
Risks probability-hazard chart For more focus on probability and hazard, the risk map was developed to show the location of each risk based on its probability and hazard. This map was divided into 16 areas based on 4 divisions on each axis. The risks that are located in 4 extreme areas on the corner of the map have been reported in the table 10 as risks Probability-Hazard chart. High Probability/High Hazard: sanction, cash flow, information flow and ordering cycle time are top priorities to manage and should be highly considered. High Probability/Low Hazard: biased interpretation of regulations, government dependency and lobbing are external risks which are not really in control of pharmaceutical companies. Low Probability/High Hazard: civil war, in process contamination, natural disasters, accidents and counterfeit are high impact on supply chain function if it does happen. So building infrastructures to prevent and minimizing hazards are highly noticeable issue. Low Probability/Low Hazard: human resource turnover, supplier agent, vacations and mergers and acquisition are considered low priority risks for pharmaceutical supply chain management.

Discussion

The top risks were t financial and economic parameters, politics and then the government. The result of this study shows pharmaceutical industry and supply chain were affected by political condition of Iran, in the study period. In addition, based on expert opinions, financial function is the first priority to manage in the pharmaceutical industry with a priority of 0.380 and this result is inline with the top rank risks identified. Political status and related risks forcing companies to focus on financial and supply management so quality issues are the last priority to manage. It could contribute to compromising quality which is one of the primary objectives of supply chain management and national drug policy in Iran. Fifty one out of 86 risk items were external and after ranking it was also observed that top 20 risks were also external. But average weight and probability of internal and external risks have no significant differences statistically. It stands for that half of the total risks in the pharmaceutical supply chain in Iran are internal risks which could be mitigated by companies, internally. It is interesting to note that this work carried out when Iran was facing rigorous international sanctions. Since the method of risk identification and hazard assessment were based on expert judgment; hence political issues and related risks may get a higher grade than others especially in the case of normal conditions. Also challenges which each expert had faced at the time of field could affect on highlighting or dismissing some items during questionnaire responding. Considering most important risks affecting on each function, companies could draw mitigation plan to minimize top rank risks based on company’s strategies. The result shows, top rank risks with high effect on financial management and supply management are closely similar to top rank risks in the pharmaceutical supply chain. But ranking in operation management and quality management are different. These results confirm the result of AHP method that showed financial and supply management are extremely challenging. Operation standers, processes and human resource issues becoming in top rank risks with high effect on quality management and operation management which most of them are internal risks that could be managed inter company. And operation and quality management are affecting internal risk more than external ones and could be easier to manage.

Conclusions

After financial and supply risks which most of them are external issues, the top risk identified in pharmaceutical supply chain include regulation issues. As one of the most significant goals of MOH is to support supply of medicine, also not addressing those risks could potentially harm supply chain. Then efficient relationship between MOH and the pharmaceutical industry could help both MOH and industry to review and mitigate regulatory risks.
  4 in total

Review 1.  The pharmaceutical industry as a medicines provider.

Authors:  David Henry; Joel Lexchin
Journal:  Lancet       Date:  2002-11-16       Impact factor: 79.321

2.  Essential medicines and human rights: what can they learn from each other?

Authors:  Hans V Hogerzeil
Journal:  Bull World Health Organ       Date:  2006-05-17       Impact factor: 9.408

3.  Pharmaceutical supply chain risks: a systematic review.

Authors:  Mona Jaberidoost; Shekoufeh Nikfar; Akbar Abdollahiasl; Rassoul Dinarvand
Journal:  Daru       Date:  2013-12-19       Impact factor: 3.117

4.  Developing a suitable model for supplier selection based on supply chain risks: an empirical study from Iranian pharmaceutical companies.

Authors:  Gholamhossein Mehralian; Ali Rajabzadeh Gatari; Mohadese Morakabati; Hossein Vatanpour
Journal:  Iran J Pharm Res       Date:  2012       Impact factor: 1.696

  4 in total
  6 in total

1.  Developing a Risk Reduction Support System for Health System in Iran: A Case Study in Blood Supply Chain Management.

Authors:  Ali Sibevei; Adel Azar; Mostafa Zandieh; Seyed Mohammad Khalili; Maziar Yazdani
Journal:  Int J Environ Res Public Health       Date:  2022-02-14       Impact factor: 3.390

Review 2.  Risk Management in Executive Levels of Healthcare Organizations: Insights from a Scoping Review (2018).

Authors:  Masoud Ferdosi; Reza Rezayatmand; Yasamin Molavi Taleghani
Journal:  Risk Manag Healthc Policy       Date:  2020-03-19

3.  Challenge of Politico-Economic Sanctions on Pharmaceutical Procurement in Iran: A Qualitative Study.

Authors:  Peivand Bastani; Zahra Dehghan; Seyyed Mansoor Kashfi; Hesam Dorosti; Mohammadtagi Mohammadpour; Gholamhossein Mehralian
Journal:  Iran J Med Sci       Date:  2022-03

4.  Evaluating the impacts of COVID-19 outbreak on supply chain risks by modified failure mode and effects analysis: a case study in an automotive company.

Authors:  Amir Hossein Ghadir; Hadi Rezaei Vandchali; Masoud Fallah; Erfan Babaee Tirkolaee
Journal:  Ann Oper Res       Date:  2022-03-31       Impact factor: 4.854

5.  Application of Analytical Hierarchy Process Approach for Service Quality Evaluation in Radiology Departments: A Cross-Sectional Study.

Authors:  Khalil Alimohammadzadeh; Mohammadkarim Bahadori; Fariba Hassani
Journal:  Iran J Radiol       Date:  2016-01-20       Impact factor: 0.212

Review 6.  Applying the Analytic Hierarchy Process in healthcare research: A systematic literature review and evaluation of reporting.

Authors:  Katharina Schmidt; Ines Aumann; Ines Hollander; Kathrin Damm; J-Matthias Graf von der Schulenburg
Journal:  BMC Med Inform Decis Mak       Date:  2015-12-24       Impact factor: 2.796

  6 in total