| Literature DB >> 25774677 |
Bruce Larson1, Allan Tindikahwa2, George Mwidu2, Hannah Kibuuka2, Fred Magala2.
Abstract
BACKGROUND: The Ugandan Ministry of Health has endorsed voluntary medical male circumcision as an HIV prevention strategy and has set ambitious goals (e.g., 4.2 million circumcisions by 2015). Innovative strategies to improve access for hard to reach, high risk, and poor populations are essential for reaching such goals. In 2009, the Makerere University Walter Reed Project began the first facility-based VMMC program in Uganda in a non-research setting. In addition, a mobile clinic began providing VMMC services to more remote, rural locations in 2011. The primary objective of this study was to estimate the average cost of performing VMMCs in the mobile clinic compared to those performed in health facilities (fixed sites). The difference between such costs is the cost of improving access to VMMC.Entities:
Mesh:
Year: 2015 PMID: 25774677 PMCID: PMC4361173 DOI: 10.1371/journal.pone.0119484
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Preliminary information for mobile program and fixed sites.
|
| |
| Costing year | 2012 |
| Total number of VMMCs performed during year in mobile unit | 3605 |
| Today days mobile unit used during year (when circumcisions performed) | 120 |
| Days mobile unit used on average per month | 10 |
| Average working days unit stays at one location (same fixed and camping) | 12 |
| Number of locations with staff camping | 4 |
| Days staff camping with mobile unit (circumcision days) | 48 |
| Days mobile unit at site but staff return each day (circumcision days) | 72 |
| Number of locations with staff returning daily | 6 |
| Total locations annually | 10 |
| Clients per day completing VMMC | 30 |
| Proportion of recruited clients who do not complete procedure | 0.01 |
| Clients per day recruited for VMMC | 30 |
| Discount rate used | 0.03 |
| Average distance site from mobile unit base (Kayunga) if location with staff returning daily (one way, kilometers) | 45 |
| Average distance site from mobile unit base (Kayunga) if location with staff camping (one way, kilometers) | 120 |
| Total distance mobile unit moves if location with staff returning daily (per location) | 90 |
| Total distance additional staff vehicle travels with staff returning daily (per location)* | 1260 |
| Total distance mobile unit travels if location with staff camping (per location) | 240 |
| Total distance additional staff vehicle moves with staff camping (per location) | 264 |
| Average cost of fuel per liter (UGX) | 2800 |
| * Assumes 2 extra travel days per staff returning site for the staff vehicle to assist with set up and take down. | |
|
| |
| Costing year | 2012 |
| VMMCs completed annually (2012 fixed site) | 3298 |
| VMMCs completed monthly | 274.8 |
| Days providing VMMC services annually | 247 |
| Clients per day completing VMMC | 13 |
| Proportion of recruited clients who do not complete procedure | 0.01 |
| Total individuals recruited for MC (number rounded) | 13 |
| Discount rate used | 0.03 |
|
|
|
| Exchange rates (Oanda.com annual average) | |
| UGX/$ 2012 | 2469 |
| UGX/$ 2010 | 2153 |
| UGX/$ 2011 | 2493 |
| ZAR/$ (South Africa Rand) 2011 | 7.23 |
| Inflation index numbers | |
| Year | |
| 2009 | 139.6 |
| 2010 | 145.2 |
| 2011 | 172.3 |
| 2012 | 196.4 |
| Source: Uganda Bureau of Statistics |
Estimated cost per VMMC for 2012 program conditions (USD).
|
|
|
|
|
|
|
|---|---|---|---|---|---|
| Step 0 | Community Mobilization | 1.91 | 3% | 1.91 | 3% |
| Step 1 | VMMC Education and HCT | 3.41 | 6% | 3.41 | 5% |
| Step 2 | Exam | 0.56 | 1% | 0.56 | 1% |
| Step 3 | Staff | 8.86 | 15% | 20.89 | 29% |
| Step 3 | Vehicle, Equipment and Other Supplies | 18.34 | 30% | 17.74 | 25% |
| Step 3 | Supplies for VMMC procedure | 27.70 | 46% | 27.70 | 38% |
| Estimated cost per VMMC (2012) | 60.79 | 100% | 72.21 | 100% | |
|
|
|
|
| ||
| Step 0 | Community Mobilization | 0.29 | 1% | ||
| Step 1 | VMMC Education and HCT | 2.98 | 9% | ||
| Step 2 | Exam | 0.31 | 1% | ||
| Step 3 | Staff | 12.40 | 36% | ||
| Step 3 | Facility costs | 12.02 | 35% | ||
| Step 3 | Equipment and Supplies | 6.19 | 18% | ||
| Estimated cost per VMMC (2012) | 34.20 | 100% |
1 The worksheets are found in the supplemental digital content (S1 Costs Mobile and S1 Costs Fixed).