| Literature DB >> 25619513 |
J L Ward1, T C DeFrancesco, S P Tou, C E Atkins, E H Griffith, B W Keene.
Abstract
BACKGROUND: Transvenous pacemaker implantation in dogs is associated with a relatively high complication rate. At our institution, pacemaker implantation in dogs with high-grade atrioventricular block (HG-AVB) frequently is performed as an after-hours emergency. HYPOTHESIS: Among dogs with HG-AVB, the rate of major complications is higher when pacemakers are implanted after hours (AH) compared to during business hours (BH). ANIMALS: Client-owned dogs with HG-AVB that underwent transvenous pacemaker implantation between January 2002 and December 2012 at the North Carolina State University Veterinary Teaching Hospital.Entities:
Keywords: Canine; Heart block; Transvenous
Mesh:
Year: 2015 PMID: 25619513 PMCID: PMC4858108 DOI: 10.1111/jvim.12512
Source DB: PubMed Journal: J Vet Intern Med ISSN: 0891-6640 Impact factor: 3.333
Demographic, clinical, procedural, and survival data for dogs with HG‐AVB undergoing transvenous PAP implantation at NCSU between 2002 and 2012. See text for definitions of individual variables. BH and AH groups are compared with Student's t‐tests (continuous variables) or Fisher's Exact test (categorical variables). All data are given as mean ± standard deviation unless otherwise noted
| Variable | All dogs | BH | AH |
|
|---|---|---|---|---|
| Number of dogs | 97 | 55 | 42 | – |
| Age (years) | 10 ± 3.2 | 10.7 ± 3.2 | 9.0 ± 3.1 | .025 |
| Weight (kg) | 23 ± 10 | 22 ± 9.8 | 25 ± 11 | .43 |
| ECG diagnosis (3rd degree AVB) | 87/97 (90%) | 48/55 (87%) | 39/42 (93%) | .68 |
| Ventricular ectopy | 17/97 (18%) | 7/55 (13%) | 10/42 (24%) | .24 |
| Escape heart rate (bpm) | 42 ± 11 | 43.6 ± 9.6 | 40.8 ± 12.0 | .58 |
| QRS duration (ms) | 61 ± 18 | 58.5 ± 18.2 | 65.1 ± 18.6 | .26 |
| Atropine responsive | 4/77 (5%) | 3/47 (6%) | 1/34 (3%) | .64 |
| Structural heart disease | 55/97 (57%) | 32/55 (58%) | 23/42 (55%) | .38 |
| Mild: 46 | Mild: 29 | Mild: 17 | ||
| Moderate: 5 | Moderate: 2 | Moderate: 3 | ||
| Severe: 4 | Severe: 1 | Severe: 3 | ||
| Congestive heart failure | 9/97 (9%) | 3/55 (5%) | 6/42 (14%) | .40 |
| Left: 4 | Left: 2 | Left: 2 | ||
| Right: 4 | Biventricular: 1 | Right: 4 | ||
| Biventricular: 1 | ||||
| Azotemia | 25/97 (26%) | 15/51 (29%) | 10/41 (24%) | .40 |
| Mild: 17 | Mild: 11 | Mild: 6 | ||
| Moderate: 8 | Moderate: 4 | Moderate: 4 | ||
| Time between referral/pacemaker (days) | 0.52 ± 0.60 | 0.81 ± 0.58 | 0.12 ± 0.32 | <.0001 |
| Lead fixation (% passive) | 88/94 (94%) | 49/54 (91%) | 39/40 (98%) | .31 |
| Operator experience | F: 16/97 | F: 9/55 | F: 7/42 | .57 |
| R3: 22/97 | R3: 13/55 | R3: 9/42 | ||
| R2: 34/97 | R2: 18/55 | R2: 16/42 | ||
| R1: 25/97 | R1: 15/55 | R1: 10/42 | ||
| Faculty present? | 79/97 (81%) | 43/55 (78%) | 36/42 (86%) | .46 |
| Temporary pacing used | 44/97 (45%) | 24/55 (44%) | 20/42 (48%) | .82 |
| Hypotension under anesthesia | 37/97 (38%) | 23/50 (46%) | 14/41 (34%) | .49 |
| Procedure duration (minutes) | 90 ± 27 | 91 ± 27 | 88 ± 26 | .26 |
| Hospitalization (hours) | 39 ± 16 | 45 ± 14 | 32 ± 16 | <.0001 |
| Cost of procedure (US$) | 2414 ± 608 | 2411 ± 644 | 2416 ± 564 | .47 |
| Major complications | 14/79 (17.7%) | 4/43 (9.3%) | 10/36 (27.8%) | .041 |
| Minor complications | 14/79 (17.7%) | 6/43 (14%) | 8/36 (22.2%) | .39 |
| MST (all‐cause) (months) | 27 | 23.5 | 29 | .70 |
| MST (cardiac) (months) | 16 | 18 | 13.5 | .40 |
Indicate statistically significant differences between BH and AH groups.
Figure 1Kaplan–Meier survival curve (all‐cause mortality) for dogs with HG‐AVB undergoing pacemaker implantation during business hours versus after hours. Survival did not differ between groups (P = .70).
Figure 2Kaplan–Meier survival curve (cardiac mortality only) for dogs with HG‐AVB undergoing pacemaker implantation during business hours versus after hours. Survival did not differ between groups (P = .40).