| Literature DB >> 24859645 |
Dirk M Ditchen1, Rolf P Ellegast, Tom Gawliczek, Bernd Hartmann, Monika A Rieger.
Abstract
OBJECTIVES: As knee-straining postures such as kneeling and squatting are known to be risk factors for knee disorders, there is a need for effective exposure assessment at the workplace. Therefore, the aim of this study was to develop a method to capture knee-straining postures for entire work shifts by combining measurement techniques with the information obtained from diaries, and thus avoiding measuring entire work shifts. This approach was applied to various occupational tasks to obtain an overview of typical exposure values in current specific occupations.Entities:
Mesh:
Year: 2014 PMID: 24859645 PMCID: PMC4305088 DOI: 10.1007/s00420-014-0946-5
Source DB: PubMed Journal: Int Arch Occup Environ Health ISSN: 0340-0131 Impact factor: 3.015
Fig. 1Knee-straining postures: a unsupported kneeling (roofer); b supported kneeling (tiler), c sitting on heels (installer), d squatting (reinforcement ironworker); and e crawling (floor layer). Subjects b–d are equipped with the CUELA measuring system
Fig. 2Screenshot of the analysis software depicting a measuring-based vector puppet (top left), the synchronised video sequence (top right), angular-time-graphs of the measured knee flexion (for both knees), and automatic identification codes for various postures (colour bars, bottom)
Example of a diary and measuring schedule of a floor layer with two measuring samples used for reconstruction of a whole shift (task module: laying carpet; M1 and M2 = measurement samples)
| Time | Task (derived from the diary) | Measurement | Kneeling/squatting | Reconstruction |
|---|---|---|---|---|
| 07.00–07.30 | Approach (driving) | – | Non relevant | |
| 07.30–08.00 | Preparation of worksite | – | Non relevant | |
| 08.00–08.30 | Application of glue | M1 | × | M1 |
| 08.30–10.30 | Laying carpet | M2 | × | M2 |
| 10.30–11.00 | Application of glue | × | M1 copy | |
| 11.00–12.30 | Laying carpet | × | M2 copy | |
| 12.30–13.00 | Break | – | Break | |
| 13.00–13.30 | Preparation work | – | Non relevant | |
| 13.30–14.00 | Application of glue | × | M1 copy | |
| 14.00–15.30 | Laying carpet | × | M2 copy | |
| 15.30–16.00 | Clearing of worksite | – | Non relevant |
Non relevant = none of the defined knee-straining postures occurred
Occupations with number of subjects (and their average age), work shifts, and task modules in the study
| Occupation |
| Age (years) | Work shifts ( | Task modules ( |
|---|---|---|---|---|
| Floor layers | 15 | 43.9 (10.8) | 16 | 4 |
| Installers/plumbers | 34 | 36.6 (13.7) | 40 | 12 |
| Mould makers | 4 | 29.5 (10.3) | 4 | 1 |
| Painters and decorators | 18 | 32.7 (13.2) | 19 | 7 |
| Parquet layers | 14 | 32.1 (9.5) | 28 | 7 |
| Pavers | 7 | 35.6 (4.8) | 7 | 3 |
| Pipe layers | 9 | 37.3 (12.8) | 9 | 4 |
| Ramp agents | 8 | 28.5 (6.6) | 8 | 2 |
| Reinforcing ironworkers | 6 | 33.2 (5.8) | 6 | 2 |
| Roofers | 34 | 34.8 (10.9) | 36 | 14 |
| Screed layers | 17 | 35.7 (10.2) | 20 | 7 |
| Shipyard workers | 6 | 32.5 (7.7) | 6 | 3 |
| Stone layers | 15 | 39.0 (8.7) | 15 | 5 |
| Tilers | 19 | 35.2 (12.2) | 20 | 8 |
| Truck tarp makers | 4 | 37.5 (11.3) | 5 | 1 |
| Welders | 3 | 32.0 (19.1) | 3 | 1 |
| Total | 213 | 35.5 (11.3) | 242 | 81 |
Values for age are mean values (SD)
Fig. 3Pilot study: comparison of measured (white) and “reconstructed” (black) exposure to the knee: time intervals spent in knee-straining postures during an entire work shift (n = 14) in three occupations (subject ID 1–8 service technicians, ID 9–12 ramp agents, ID 13–14 nursery nurses)
Fig. 4Distribution of daily time intervals spent in five different knee-straining postures over all measurements (box-plots showing percentiles 5, 25, 50, 75, and 95; N = 242 work shifts)
Mean time proportions spent in the five knee-straining postures in 81 task modules of 16 occupations (N = 242 work shifts, n = examined work shift per task module)
| Occupation | Task module |
| Total exposure (% work shift) | Squatting (% work shift) | Sitting on heels (% work shift) | Unsupported kneeling (% work shift) | Supported kneeling (% work shift) | Crawling (% work shift) |
|---|---|---|---|---|---|---|---|---|
| Floor layers | Installing carpets | 6 | 48.2 (5.9) | 0.3 (0.3) | 4.7 (2.7) | 23.1 (4.7) | 16.6 (8.4) | 3.5 (4.1) |
| Carpet removal | 3 | 44.5 (0.7) | 0.8 (0.3) | 5.1 (2.0) | 18.6 (7.1) | 17.1 (5.6) | 2.9 (0.9) | |
| Preparation work | 4 | 22.0 (23.0) | 0.1 (0.1) | 1.9 (2.7) | 5.8 (4.6) | 13.8 (16.1) | 0.4 (0.5) | |
| Installing carpets (vehicles) | 3 | 37.7 (15.2) | 3.3 (4.3) | 2.8 (2.4) | 20.4 (5.5) | 8.8 (4.6) | 2.4 (4.0) | |
| Installers | Preparing underfloor heating | 3 | 65.8 (21.7) | 2.8 (1.2) | 8.9 (9.7) | 32.6 (2.0) | 20.7 (12.6) | 0.9 (1.1) |
| Installing underfloor heating | 5 | 40.3 (14.8) | 3.1 (5.5) | 4.1 (3.0) | 18.3 (6.6) | 14.8 (16.1) | 0.0 (0.1) | |
| Installing heating system | 3 | 7.7 (4.7) | 1.8 (1.4) | 1.6 (2.8) | 4.0 (3.5) | 0.2 (0.4) | 0.0 (0.0) | |
| Installing radiators | 3 | 51.0 (5.2) | 1.4 (1.8) | 14.8 (16.3) | 34.1 (10.6) | 0.7 (0.2) | 0.0 (0.0) | |
| Installing pipe | 6 | 37.8 (12.6) | 2.7 (2.8) | 5.5 (6.2) | 26.3 (14.1) | 3.4 (4.0) | 0.0 (0.0) | |
| Installing sewer pipe | 2 | 52.3 (6.7) | 7.9 (2.7) | 7.0 (7.3) | 32.9 (14.8) | 4.6 (1.9) | 0.0 (0.0) | |
| Installing concealed cistern | 2 | 34.5 (26.0) | 1.3 (0.4) | 0.5 (0.7) | 30.2 (21.4) | 2.5 (3.5) | 0.0 (0.0) | |
| Installing toilets and wash basins | 4 | 41.5 (1.9) | 2.5 (4.3) | 5.8 (5.4) | 28.1 (7.8) | 5.2 (4.1) | 0.0 (0.0) | |
| Installing roof flashing | 4 | 20.3 (17.7) | 11.1 (18.0) | 0.1 (0.3) | 6.3 (4.4) | 2.8 (3.7) | 0.0 (0.0) | |
| Installing gutters | 3 | 5.7 (7.5) | 0.2 (0.1) | 0.0 (0.0) | 2.6 (2.8) | 2.8 (4.8) | 0.0 (0.0) | |
| Installing PV-system (flat roof) | 3 | 5.3 (5.0) | 1.5 (1.2) | 0.1 (0.2) | 3.0 (3.3) | 0.7 (1.2) | 0.0 (0.0) | |
| Installing PV-system (steep roof) | 2 | 25.6 (3.4) | 2.0 (1.3) | 1.4 (0.2) | 15.6 (9.6) | 6.7 (5.1) | 0.0 (0.0) | |
| Mould makers | Mould making | 4 | 6.5 (3.0) | 0.2 (0.3) | 0.3 (0.2) | 2.5 (0.8) | 3.6 (3.0) | 0.0 (0.1) |
| Painters and decorators | Preparing masonry painting | 3 | 35.0 (21.4) | 7.9 (6.0) | 5.6 (5.6) | 20.3 (13.6) | 1.4 (1.7) | 0.0 (0.0) |
| Masonry painting | 3 | 9.0 (5.2) | 5.3 (6.9) | 0.6 (1.1) | 2.7 (1.4) | 0.4 (0.6) | 0.0 (0.0) | |
| Installing external wall insulation | 5 | 8.9 (12.2) | 4.5 (9.4) | 2.3 (4.9) | 2.1 (2.4) | 0.1 (0.1) | 0.0 (0.0) | |
| Wallpapering | 3 | 24.2 (7.1) | 1.6 (2.4) | 6.3 (5.1) | 15.5 (4.0) | 0.7 (0.6) | 0.0 (0.0) | |
| Interior painting (brush) | 2 | 35.4 (8.5) | 9.2 (11.7) | 1.1 (0.6) | 23.6 (5.8) | 1.5 (2.1) | 0.0 (0.0) | |
| Interior painting (paint roller) | 1 | 3.0 (–) | 1.7 (–) | 0.0 (–) | 1.3 (–) | 0.0 (–) | 0.0 (–) | |
| Painting a stairwell | 2 | 14.0 (6.8) | 1.5 (1.4) | 5.1 (3.9) | 7.3 (4.5) | 0.1 (0.2) | 0.0 (0.0) | |
| Parquet layers | Laying strip parquet | 3 | 74.1 (7.5) | 0.6 (0.4) | 2.2 (1.7) | 58.5 (10.4) | 12.7 (17.5) | 0.2 (0.2) |
| Laying mosaic parquet | 8 | 52.4 (5.9) | 2.6 (2.8) | 3.0 (1.3) | 28.6 (9.2) | 18.1 (7.3) | 0.1 (0.1) | |
| Sanding finish (grinding) | 10 | 34.9 (14.2) | 0.3 (0.4) | 1.4 (1.4) | 21.1 (13.2) | 12.1 (7.9) | 0.1 (0.1) | |
| Preparation work | 2 | 2.5 (3.1) | 0.3 (0.1) | 0.0 (0.0) | 2.3 (3.2) | 0.0 (0.0) | 0.0 (0.0) | |
| Installing board parquet (planks) | 1 | 33.7 (–) | 5.3 (–) | 7.4 (–) | 11.4 (–) | 9.3 (–) | 0.2 (–) | |
| Preparing strip parquet | 3 | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | |
| Installing base | 1 | 61.8 (–) | 0.5 (–) | 5.4 (–) | 29.2 (–) | 26.1 (–) | 0.5 (–) | |
| Pavers | Laying interlocking paving stones | 3 | 17.8 (3.1) | 3.5 (5.4) | 0.5 (0.9) | 10.5 (6.2) | 3.2 (3.1) | 0.0 (0.0) |
| Laying cobblestones | 3 | 82.5 (5.9) | 80.2 (2.5) | 0.0 (0.0) | 2.3 (4.0) | 0.0 (0.0) | 0.0 (0.0) | |
| Laying cobblestones (using stool) | 1 | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | |
| Pipe layers | Sewer construction | 3 | 2.0 (1.3) | 0.8 (0.3) | 0.1 (0.1) | 0.8 (0.8) | 0.3 (0.4) | 0.0 (0.0) |
| Pipe laying (welding) | 3 | 13.9 (5.9) | 2.3 (2.1) | 0.8 (1.4) | 7.2 (4.6) | 3.5 (2.9) | 0.1 (0.1) | |
| Pipe laying (PE welding) | 2 | 21.9 (10.6) | 0.1 (0.1) | 4.3 (4.3) | 16.1 (7.4) | 1.4 (1.4) | 0.0 (0.0) | |
| Digging | 1 | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | 0.0 (–) | |
| Ramp agents | Wide and narrow body aircrafts | 3 | 5.8 (3.4) | 0.4 (0.6) | 1.9 (2.3) | 1.8 (1.3) | 1.6 (0.4) | 0.1 (0.0) |
| Narrow body aircrafts | 5 | 17.4 (3.8) | 0.1 (0.1) | 2.6 (1.0) | 9.1 (2.4) | 5.0 (3.3) | 0.6 (0.4) | |
| Reinforcing ironworkers | Rebar tying | 3 | 16.7 (12.6) | 8.3 (3.1) | 0.5 (0.9) | 7.4 (11.9) | 0.5 (0.9) | 0.0 (0.0) |
| Form working | 3 | 14.2 (11.4) | 5.1 (1.1) | 0.5 (0.7) | 5.6 (6.8) | 3.0 (3.7) | 0.0 (0.1) | |
| Roofers (steep roofs) | Installing battens | 4 | 4.2 (4.0) | 0.3 (0.3) | 0.1 (0.1) | 2.9 (2.6) | 0.9 (1.8) | 0.0 (0.0) |
| Installing insulation | 2 | 48.9 (13.5) | 2.6 (2.0) | 1.0 (0.9) | 36.8 (5.7) | 8.2 (5.1) | 0.2 (0.2) | |
| Installing roof tiles | 3 | 7.2 (7.6) | 0.5 (0.6) | 1.3 (2.2) | 3.5 (3.9) | 1.9 (1.8) | 0.1 (0.2) | |
| Installing plain tiles | 4 | 27.2 (18.8) | 2.0 (2.6) | 0.7 (0.8) | 17.4 (16.0) | 7.2 (5.7) | 0.0 (0.0) | |
| Slate roofing | 2 | 48.7 (16.1) | 0.3 (0.1) | 3.1 (2.6) | 29.2 (9.5) | 16.1 (9.1) | 0.0 (0.0) | |
| Mansard slate roofing | 3 | 18.7 (8.3) | 2.1 (2.5) | 9.5 (5.2) | 6.8 (5.9) | 0.2 (0.2) | 0.0 (0.0) | |
| Installing corrugated panels | 3 | 7.0 (6.0) | 2.7 (3.6) | 0.3 (0.6) | 3.8 (6.6) | 0.2 (0.3) | 0.0 (0.0) | |
| Reed roofing | 3 | 3.7 (6.0) | 0.1 (0.1) | 0.0 (0.0) | 3.6 (6.0) | 0.0 (0.0) | 0.0 (0.0) | |
| Reed removal | 1 | 3.0 (–) | 0.2 (–) | 0.6 (–) | 1.6 (–) | 0.6 (–) | 0.0 (–) | |
| Roof tile transport | 1 | 2.8 (–) | 0.3 (–) | 0.0 (–) | 1.6 (–) | 0.9 (–) | 0.0 (–) | |
| Wood framing work (carpenter) | 1 | 14.6 (–) | 0.3 (–) | 0.2 (–) | 7.1 (–) | 6.9 (–) | 0.1 (–) | |
| Roofers (flat roofs) | Torch-on roofing | 4 | 18.1 (10.9) | 1.7 (3.0) | 1.3 (1.5) | 11.5 (6.5) | 3.6 (2.4) | 0.0 (0.1) |
| Sealing roof to wall | 2 | 64.7 (0.7) | 0.4 (0.3) | 3.5 (0.8) | 39.9 (21.4) | 20.8 (20.1) | 0.0 (0.0) | |
| Installing PVC membranes | 3 | 22.1 (17.4) | 10.5 (14.5) | 0.6 (0.6) | 8.5 (4.7) | 2.5 (3.7) | 0.1 (0.1) | |
| Screed layers (flowing screed) | Installing insulation | 4 | 49.3 (7.3) | 3.3 (3.8) | 3.3 (2.9) | 27.2 (12.4) | 12.3 (8.4) | 3.2 (2.6) |
| Installing flowing screed | 5 | 7.3 (6.5) | 3.3 (4.7) | 0.4 (0.9) | 3.2 (3.2) | 0.4 (0.7) | 0.0 (0.0) | |
| Screed layers (sand and cement screed) | Screeding the floor (team of 3) | 3 | 52.2 (8.0) | 0.4 (0.3) | 2.1 (1.6) | 14.0 (3.6) | 35.4 (6.3) | 0.2 (0.2) |
| Screeding the floor (team of 2) | 1 | 55.2 (–) | 1.6 (–) | 2.1 (–) | 31.0 (–) | 20.5 (–) | 0.0 (–) | |
| Planing the screed (team of 3) | 3 | 33.3 (13.6) | 1.0 (0.9) | 2.7 (1.9) | 9.4 (6.7) | 19.6 (11.8) | 0.5 (0.4) | |
| Mixing the screed (team of 3) | 2 | 0.4 (0.1) | 0.0 (0.0) | 0.0 (0.1) | 0.3 (0.1) | 0.0 (0.0) | 0.0 (0.0) | |
| Mixing the screed (team of 2) | 2 | 17.7 (2.5) | 1.3 (0.3) | 0.2 (0.1) | 8.4 (0.1) | 7.8 (2.1) | 0.0 (0.0) | |
| Shipyard workers | Welding | 3 | 61.2 (33.9) | 3.8 (4.0) | 4.0 (5.6) | 45.5 (28.4) | 7.9 (8.0) | 0.1 (0.1) |
| Mechanic work | 2 | 31.5 (10.7) | 4.3 (4.0) | 2.9 (0.3) | 20.1 (1.0) | 2.2 (2.7) | 2.1 (2.8) | |
| Grinding | 1 | 33.3 (–) | 10.3 (–) | 0.0 (–) | 17.0 (–) | 6.1 (–) | 0.0 (–) | |
| Stone layers | Staircase laying | 5 | 29.7 (10.2) | 11.0 (9.2) | 3.3 (3.6) | 14.6 (17.4) | 0.9 (0.6) | 0.0 (0.0) |
| Cladding facades | 5 | 16.2 (8.2) | 7.3 (4.7) | 0.1 (0.3) | 8.1 (5.7) | 0.6 (0.6) | 0.0 (0.0) | |
| Setting floor tiles | 3 | 32.8 (6.5) | 1.8 (1.3) | 1.4 (1.3) | 15.7 (5.7) | 13.9 (2.0) | 0.0 (0.0) | |
| Vacuum lifter operator | 1 | 1.4 (–) | 0.9 (–) | 0.0 (–) | 0.1 (–) | 0.5 (–) | 0.0 (–) | |
| Stone layer with vacuum lifter | 1 | 52.3 (–) | 0.3 (–) | 3.0 (–) | 26.7 (–) | 22.3 (–) | 0.0 (–) | |
| Tilers | Floor tiling (thin-bed method) | 5 | 63.7 (9.3) | 0.3 (0.3) | 10.5 (2.5) | 24.3 6.6 | 28.5 (5.6) | 0.0 (0.1) |
| Wall tiling (thin-bed method) | 3 | 28.9 (16.7) | 5.8 (5.3) | 5.5 (3.4) | 13.6 (9.0) | 4.1 (2.0) | 0.0 (0.0) | |
| Grouting floor tiles | 2 | 66.7 (2.8) | 7.3 (10.2) | 11.9 (3.5) | 17.3 (3.8) | 29.7 (5.0) | 0.5 (0.6) | |
| Grouting wall tiles | 5 | 29.0 (5.7) | 6.3 (7.3) | 6.9 (6.3) | 13.9 (7.6) | 1.9 (1.8) | 0.0 (0.0) | |
| Preparation work | 2 | 27.3 (7.0) | 0.3 (0.2) | 2.9 (2.4) | 19.1 (9.4) | 4.9 (0.2) | 0.2 (0.3) | |
| Floor tiling (thick bed method) | 1 | 61.8 (–) | 2.3 (–) | 5.7 (–) | 23.4 (–) | 30.4 (–) | 0.0 (–) | |
| Siliconing bath room | 1 | 33.1 (–) | 13.9 (–) | 0.0 (–) | 18.3 (–) | 0.9 (–) | 0.0 (–) | |
| Wall and floor tiling (thin bed) | 1 | 48.3 (–) | 0.0 (–) | 7.8 (–) | 32.6 (–) | 7.8 (–) | 0.0 (–) | |
| Truck tarp makers | Producing truck tarps | 5 | 21.9 (5.1) | 3.6 (4.8) | 0.4 (0.5) | 13.1 (3.1) | 2.0 (2.3) | 2.9 (3.4) |
| Welders (container) | Welding partition walls | 3 | 40.9 (12.1) | 0.4 (0.4) | 2.1 (2.4) | 14.6 (17.5) | 23.9 (8.7) | 0.0 (0.0) |
Values are mean values (standard deviations)
PV photovoltaic, PE polyethylene