| Literature DB >> 24596563 |
Caron A C Clark1, Jennifer Mize Nelson2, John Garza2, Tiffany D Sheffield2, Sandra A Wiebe3, Kimberly Andrews Espy4.
Abstract
Early executive control (EC) predicts a range of academic outcomes and shows particularly strong associations with children's mathematics achievement. Nonetheless, a major challenge for EC research lies in distinguishing EC from related cognitive constructs that also are linked to achievement outcomes. Developmental cascade models suggest that children's information processing speed is a driving mechanism in cognitive development that supports gains in working memory, inhibitory control and associated cognitive abilities. Accordingly, individual differences in early executive task performance and their relation to mathematics may reflect, at least in part, underlying variation in children's processing speed. The aims of this study were to: (1) examine the degree of overlap between EC and processing speed at different preschool age points; and (2) determine whether EC uniquely predicts children's mathematics achievement after accounting for individual differences in processing speed. As part of a longitudinal, cohort-sequential study, 388 children (50% boys; 44% from low income households) completed the same battery of EC tasks at ages 3, 3.75, 4.5, and 5.25 years. Several of the tasks incorporated baseline speeded naming conditions with minimal EC demands. Multidimensional latent models were used to isolate the variance in executive task performance that did not overlap with baseline processing speed, covarying for child language proficiency. Models for separate age points showed that, while EC did not form a coherent latent factor independent of processing speed at age 3 years, it did emerge as a distinct factor by age 5.25. Although EC at age 3 showed no distinct relation with mathematics achievement independent of processing speed, EC at ages 3.75, 4.5, and 5.25 showed independent, prospective links with mathematics achievement. Findings suggest that EC and processing speed are tightly intertwined in early childhood. As EC becomes progressively decoupled from processing speed with age, it begins to take on unique, discriminative importance for children's mathematics achievement.Entities:
Keywords: academic achievement; executive function; mathematics; preschool; processing speed
Year: 2014 PMID: 24596563 PMCID: PMC3925940 DOI: 10.3389/fpsyg.2014.00107
Source DB: PubMed Journal: Front Psychol ISSN: 1664-1078
Figure 1Model of the relations between executive control and processing speed tested at different preschool age points. EC, Executive Control; PS, Processing Speed; 9B, Nine Boxes maximum correct run; DA, Delayed Alternation score; NB, Nebraska Barnyard trials correct; BLc, Big-Little conflict trial accuracy; SD, Snack Delay movement score; SSi, Shape School Inhibit Accuracy; SSs, Shape School Switch accuracy; PT:B, Preschool Trails: B efficiency; SSb, Shape School Baseline naming response time; BLnc, Big-Little non-conflict trail response time; PT:A, Preschool Trails: A response time; WJ VM, Woodcock-Johnson III Visual Matching subtest score; Lang, Woodcock-Johnson III Verbal Comprehension subtest score.
Figure 2Model of executive control, processing speed and language achievement as predictors of mathematics achievement over the preschool period. EC, Executive Control; PS, Processing Speed; 9B, Nine Boxes maximum correct run; DA, Delayed Alternation score; NB, Nebraska Barnyard trials correct; BLc, Big-Little conflict trial accuracy; SD, Snack Delay movement score; SSi, Shape School Inhibit Accuracy; SSs, Shape School Switch accuracy; PT:B, Preschool Trails: B efficiency; SSb, Shape School Baseline naming response time; BLnc, Big-Little non-conflict trail response time; PT:A, Preschool Trails: A response time; WJ VM, Woodcock-Johnson III Visual Matching subtest; Lang, Woodcock-Johnson III Verbal Comprehension subtest score; WJ AP, Woodcock-Johnson III Applied Problems subtest score.
Descriptive statistics and correlations between executive control, processing speed, and language measures across the preschool period.
| Nine boxes maximum correct run | 4.32 (1.60) | |||||||||||||
| Delayed alternation summary score | −0.37 (3.96) | 0.09 | ||||||||||||
| Nebraska barnyard summary score | 2.88 (1.57) | 0.13 | 0.19 | |||||||||||
| Big little % correct conflict trials | 0.29 (0.29) | 0.08 | 0.23 | 0.30 | ||||||||||
| Go/No-Go | 0.26 (0.75) | 0.03 | 0.09 | 0.14 | 0.18 | |||||||||
| Snack delay epochs with no movement | 12.21 (11.42) | 0.07 | 0.04 | 0.26 | 0.24 | 0.23 | ||||||||
| Shape school inhibit % correct | 0.38 (0.42) | −0.02 | 0.18 | 0.27 | 0.36 | 0.28 | 0.26 | |||||||
| Shape school switch % correct | 0.26 (0.26) | 0.03 | 0.15 | 0.58 | 0.25 | 0.15 | 0.17 | 0.50 | ||||||
| Preschool trails B efficiency | 0.70 (0.19) | 0.02 | 0.07 | 0.33 | 0.20 | 0.15 | 0.31 | 0.27 | 0.28 | |||||
| Big little non-conflict response time | 3.21 (8.12) | −0.07 | −0.05 | −0.17 | −0.01 | −0.09 | −0.16 | −0.12 | −0.08 | −0.06 | ||||
| Shape school A response time | 2.30 (2.09) | 0.00 | −0.12 | −0.34 | −0.23 | −0.23 | −0.24 | −0.14 | −0.19 | −0.16 | 0.24 | |||
| Preschool trails A response time | 7.51 (6.18) | −0.14 | −0.18 | −0.24 | −0.17 | −0.10 | −0.04 | −0.14 | −0.17 | 0.22 | −0.02 | 0.24 | ||
| Visual matching study entry | 413.45 (10.70) | 0.07 | 0.10 | 0.41 | 0.30 | 0.16 | 0.33 | 0.24 | 0.28 | 0.19 | −0.16 | −0.32 | −0.22 | |
| Verbal comprehension study entry | 436.60 (6.92) | 0.05 | 0.17 | 0.46 | 0.23 | 0.15 | 0.26 | 0.37 | 0.40 | 0.22 | −0.11 | −0.22 | −0.26 | 0.31 |
| Nine boxes maximum correct run | 4.92 (1.71) | |||||||||||||
| Delayed alternation summary score | 2.61 (4.85) | 0.09 | ||||||||||||
| Nebraska barnyard summary score | 4.90 (2.07) | 0.14 | 0.19 | |||||||||||
| Big little % correct conflict trials | 0.64 (0.34) | 0.08 | 0.22 | 0.43 | ||||||||||
| Go/No-Go | 1.38 (1.01) | 0.11 | 0.11 | 0.25 | 0.27 | |||||||||
| Snack delay epochs with no movement | 17.96 (10.93) | 0.08 | 0.10 | 0.20 | 0.24 | 0.30 | ||||||||
| Shape school inhibit % correct | 0.75 (0.37) | 0.05 | 0.12 | 0.33 | 0.36 | 0.42 | 0.25 | |||||||
| Shape school switch % correct | 0.57 (0.29) | 0.14 | 0.17 | 0.35 | 0.51 | 0.33 | 0.22 | 0.48 | ||||||
| Preschool trails B efficiency | 0.82 (0.13) | 0.04 | 0.07 | 0.18 | 0.13 | 0.09 | 0.10 | 0.28 | 0.20 | |||||
| Big little non-conflict response time | 1.59 (0.83) | −0.04 | −0.03 | −0.16 | 0.11 | −0.21 | −0.11 | −0.13 | −0.10 | −0.05 | ||||
| Shape school A response time | 1.26 (0.60) | −0.06 | −0.13 | −0.26 | −0.18 | −0.31 | −0.16 | −0.33 | −0.22 | −0.02 | 0.30 | |||
| Preschool trails A response time | 4.34 (3.52) | −0.10 | −0.12 | −0.36 | −0.27 | −0.31 | −0.28 | −0.16 | −0.21 | 0.04 | 0.08 | 0.19 | ||
| Visual matching study entry | 416.90 (13.28) | 0.02 | 0.18 | 0.28 | 0.23 | 0.23 | 0.13 | 0.19 | 0.37 | −0.08 | −0.10 | −0.20 | −0.21 | |
| Verbal comprehension study entry | 438.13 (7.74) | 0.09 | 0.06 | 0.32 | 0.30 | 0.26 | 0.22 | 0.31 | 0.42 | 0.06 | −0.11 | −0.20 | −0.34 | 0.48 |
| Nine boxes maximum correct run | 5.23 (1.79) | |||||||||||||
| Delayed alternation summary score | 5.99 (5.51) | 0.09 | ||||||||||||
| Nebraska barnyard summary score | 6.98 (2.60) | 0.17 | 0.23 | |||||||||||
| Big little % correct conflict trials | 0.85 (0.21) | 0.06 | 0.14 | 0.34 | ||||||||||
| Go/No-Go | 2.30 (0.82) | 0.02 | 0.18 | 0.25 | 0.20 | |||||||||
| Snack delay epochs with no movement | 21.85 (9.40) | 0.16 | 0.23 | 0.29 | 0.16 | 0.31 | ||||||||
| Shape school inhibit % correct | 0.92 (0.18) | 0.00 | 0.12 | 0.21 | 0.16 | 0.32 | 0.23 | |||||||
| Shape school switch % correct | 0.73 (0.24) | 0.07 | 0.18 | 0.37 | 0.40 | 0.33 | 0.30 | 0.29 | ||||||
| Preschool trails B efficiency | 0.86 (0.12) | 0.09 | 0.16 | 0.19 | 0.13 | 0.14 | 0.16 | 0.16 | 0.22 | |||||
| Big little non-conflict response time | 1.28 (0.49) | −0.10 | −0.20 | −0.20 | 0.14 | −0.22 | −0.20 | −0.18 | −0.15 | 0.01 | ||||
| Shape school A response time | 1.02 (0.38) | −0.07 | −0.13 | −0.13 | −0.08 | −0.22 | −0.20 | −0.07 | −0.12 | −0.03 | 0.34 | |||
| Preschool trails A response time | 2.21 (1.81) | −0.09 | −0.17 | −0.38 | −0.18 | −0.30 | −0.30 | −0.13 | −0.28 | 0.10 | 0.35 | 0.38 | ||
| Visual matching study exit | 454.77 (11.48) | 0.07 | 0.18 | 0.34 | 0.30 | 0.25 | 0.22 | 0.18 | 0.24 | 0.08 | −0.15 | −0.26 | −0.38 | |
| Verbal comprehension study exit | 463.23 (12.76) | 0.10 | 0.12 | 0.45 | 0.27 | 0.27 | 0.20 | 0.16 | 0.34 | 0.00 | −0.27 | −0.18 | −0.37 | 0.44 |
| Nine boxes maximum correct run | 5.73 (1.87) | |||||||||||||
| Delayed alternation summary score | 7.53 (5.81) | 0.11 | ||||||||||||
| Nebraska barnyard summary score | 8.91 (2.41) | 0.17 | 0.14 | |||||||||||
| Big little % correct conflict trials | 0.95 (0.08) | 0.15 | 0.11 | 0.38 | ||||||||||
| Go/No-Go | 2.74 (0.49) | 0.17 | 0.24 | 0.28 | 0.25 | |||||||||
| Snack delay epochs with no movement | 25.51 (9.85) | 0.23 | 0.03 | 0.24 | 0.21 | 0.20 | ||||||||
| Shape school inhibit % correct | 0.96 (0.10) | 0.03 | 0.05 | 0.13 | 0.17 | 0.09 | 0.15 | |||||||
| Shape school switch % correct | 0.84 (0.17) | 0.12 | 0.07 | 0.28 | 0.28 | 0.23 | 0.19 | 0.23 | ||||||
| Preschool trails B efficiency | 0.90 (0.11) | 0.09 | 0.13 | 0.17 | 0.19 | 0.11 | 0.12 | 0.12 | 0.22 | |||||
| Big little non-conflict response time | 1.12 (0.33) | −0.10 | −0.11 | −0.25 | −0.05 | −0.19 | −0.17 | −0.06 | −0.17 | −0.06 | ||||
| Shape school A response time | 0.88 (0.25) | −0.02 | −0.06 | −0.16 | 0.04 | −0.15 | −0.09 | 0.05 | −0.12 | 0.04 | 0.21 | |||
| Preschool trails A response time | 1.28 (0.68) | −0.07 | −0.13 | −0.31 | −0.22 | −0.29 | −0.11 | −0.02 | −0.03 | 0.10 | 0.19 | 0.24 | ||
| Visual matching study exit | 456.18 (11.99) | 0.06 | 0.05 | 0.34 | 0.26 | 0.27 | 0.13 | 0.05 | 0.30 | 0.05 | −0.15 | −0.23 | −0.33 | |
| Verbal comprehension study exit | 464.28 (13.12) | 0.03 | −0.02 | 0.53 | 0.34 | 0.28 | 0.14 | 0.15 | 0.27 | 0.13 | −0.18 | −0.14 | −0.24 | 0.45 |
p < 0.05;
p < 0.01;
p < 0.001.
Response times presented in seconds, where a longer response indicates slower speed. The Visual Matching score is a Rasch-based, positively scaled w score (Woodcock et al., .
Summary of standardized coefficients for multidimensional model by age group.
| Nine boxes maximum correct run | 0.11 | 0.16 | 0.14 | 0.16 | 0.03 | 0.06 | 0.06 | 0.01 | −0.09 | 0.01 | 0.07 | 0.31 |
| (0.08) | (0.08) | (0.08) | (0.07) | (0.07) | (0.06) | (0.06) | (0.06) | (0.10) | (0.09) | (0.08) | (0.07) | |
| Delayed alternation correct-incorrect runs | 0.21 | 0.32 | 0.28 | 0.26 | 0.15 | −0.01 | 0.03 | −0.06 | 0.02 | 0.08 | 0.22 | 0.20 |
| (0.08) | (0.07) | (0.07) | (0.07) | (0.07) | (0.06) | (0.06) | (0.05) | (0.09) | (0.09) | (0.08) | (0.08) | |
| Nebraska barnyard summary score | 0.57 | 0.52 | 0.31 | 0.32 | 0.40 | 0.21 | 0.39 | 0.48 | −0.58 | 0.18 | 0.32 | 0.31 |
| (0.08) | (0.07) | (0.07) | (0.06) | (0.06) | (0.06) | (0.05) | (0.04) | (0.27) | (0.11) | (0.07) | (0.07) | |
| Big-Little conflict trials % correct | 0.48 | 0.51 | 0.11 | 0.17 | 0.18 | 0.21 | 0.31 | 0.32 | 0.12 | 0.25 | 0.39 | 0.44 |
| (0.07) | (0.12) | (0.08) | (0.07) | (0.07) | (0.06) | (0.06) | (0.05) | (0.12) | (0.19) | (0.07) | (0.07) | |
| Go/No-Go | 0.34 | 0.40 | 0.36 | 0.39 | 0.11 | 0.18 | 0.31 | 0.20 | 0.18 | 0.30 | 0.31 | 0.26 |
| (0.08) | (0.08) | (0.07) | (0.07) | (0.07) | (0.06) | (0.06) | (0.05) | (0.11) | (0.10) | (0.07) | (0.08) | |
| Snack delay movement score | 0.40 | 0.31 | 0.39 | 0.19 | 0.20 | 0.15 | 0.17 | 0.08 | −0.12 | 0.17 | 0.31 | 0.41 |
| (0.08) | (0.08) | (0.07) | (0.07) | (0.07) | (0.06) | (0.06) | (0.06) | (0.09) | (0.11) | (0.07) | (0.08) | |
| Shape school condition B % correct | 0.43 | 0.21 | 0.19 | 0.03 | 0.34 | 0.26 | 0.11 | 0.16 | 0.23 | 0.85 | 0.37 | 0.36 |
| (0.08) | (0.12) | (0.08) | (0.08) | (0.07) | (0.06) | (0.06) | (0.06) | (0.15) | (0.38) | (0.10) | (0.07) | |
| Shape school condition D % correct | 0.42 | 0.46 | 0.26 | 0.19 | 0.35 | 0.35 | 0.30 | 0.25 | −0.30 | 0.35 | 0.62 | 0.37 |
| (0.10) | (0.15) | (0.08) | (0.07) | (0.07) | (0.06) | (0.06) | (0.05) | (0.12) | (0.23) | (0.08) | (0.07) | |
| Preschool trails B efficiency | 0.32 | 0.12 | 0.07 | 0.04 | 0.29 | 0.08 | 0.04 | 0.16 | −0.06 | 0.32 | 0.38 | 0.37 |
| (0.08) | (0.16) | (0.09) | (0.09) | (0.07) | (0.07) | (0.06) | (0.05) | (0.10) | (0.18) | (0.08) | (0.07) | |
| Big little non-conflict Trial | 0.27 | 0.31 | 0.49 | 0.37 | ||||||||
| (0.08) | (0.08) | (0.06) | (0.07) | |||||||||
| Shape school condition A | 0.50 | 0.47 | 0.54 | 0.39 | ||||||||
| (0.07) | (0.08) | (0.06) | (0.07) | |||||||||
| Preschool trails A response time | 0.24 | 0.43 | 0.70 | 0.62 | ||||||||
| (0.08) | (0.08) | (0.06) | (0.07) | |||||||||
| Woodcock-Johnson visual matching score | 0.49 | 0.25 | 0.36 | 0.37 | ||||||||
| (0.07) | (0.07) | (0.07) | (0.07) | |||||||||
p < 0.05;
p < 0.01;
p < 0.001. All response times are reverse scored for interpretability.
Summary of relations of processing speed, language, and executive control to mathematics outcomes across the preschool period.
| 3 Years | 0.48 | 0.44 | −0.12 | |||||||||
| (0.06) | (0.06) | (0.09) | ||||||||||
| 3.75 Years | 0.47 | 0.71 | 0.51 | 0.30 | −0.16 | 0.18 | ||||||
| (0.07) | (0.05) | (0.05) | (0.05) | (0.10) | (0.08) | |||||||
| 4.5 Years | 0.45 | 0.59 | 0.60 | 0.40 | 0.32 | 0.43 | −0.19 | 0.23 | 0.14 | |||
| (0.07) | (0.07) | (0.07) | (0.06) | (0.06) | (0.05) | (0.10) | (0.09) | (0.11) | ||||
| 5.25 Years | 0.35 | 0.61 | 0.46 | 0.47 | 0.38 | 0.24 | 0.46 | 0.48 | −0.11 | 0.15 | 0.19 | 0.37 |
| (0.07) | (0.06) | (0.06) | (0.06) | (0.06) | (0.06) | (0.06) | (0.04) | (0.10) | (0.10) | (0.08) | (0.06) | |
| 3.75 Years | 0.34 | 0.50 | 0.60 | 0.45 | −0.06 | 0.31 | ||||||
| (0.07) | (0.07) | (0.05) | (0.06) | (0.09) | (0.08) | |||||||
| 4.5 Years | 0.43 | 0.52 | 0.51 | 0.45 | 0.38 | 0.46 | −0.03 | 0.40 | 0.35 | |||
| (0.06) | (0.08) | (0.08) | (0.06) | (0.06) | (0.05) | (0.10) | (0.08) | (0.10) | ||||
| 5.25 Years | 0.35 | 0.59 | 0.47 | 0.48 | 0.39 | 0.31 | 0.47 | 0.50 | −00.09 | 0.21 | 0.30 | 0.27 |
| (0.07) | (0.06) | (0.06) | (0.06) | (0.06) | (0.06) | (0.05) | (0.04) | (0.11) | (0.10) | (0.07) | (0.07) | |
p < 0.05;
p < 0.001.
Separate models were constructed for each EC assessment and mathematics outcome age.