Literature DB >> 24175411

Accuracy of a stormwater monitoring program for urban landuses.

Krish Madarang1, Joo-Hyon Kang.   

Abstract

This study examined the accuracy of an urban stormwater monitoring program in estimating the annual discharge load (L(T)) and the annual reduction rate by a stormwater treatment device (R(T)) for total suspended solids. A calibrated stormwater management model was used to generate the entire stormwater runoff events in one year and was used to estimate L(T) and R(T) under different monitoring strategies having limited numbers of runoff events, including random, wet season, antecedent dry days (ADD)-based, monthly, and seasonally weighted. For random monitoring, 12 storms were required to estimate the values of L(T) and R(T) with mean relative errors of 13.98 and 0.24%, respectively. Monthly monitoring had slightly greater mean relative errors compared to random monitoring. Wet season and ADD-based monitoring under- or overestimated both L(T) and R(T). Monitoring with equal numbers of storms from the wet and dry seasons best estimated L(T) and R(T).

Mesh:

Substances:

Year:  2013        PMID: 24175411     DOI: 10.2175/106143013x13736496908942

Source DB:  PubMed          Journal:  Water Environ Res        ISSN: 1061-4303            Impact factor:   1.946


  1 in total

1.  Temporal variability of suspended solids in construction runoff and evaluation of time-paced sampling strategies.

Authors:  Raja Umer Sajjad; Ma Cristina Paule-Mercado; Imran Salim; Sheeraz Memon; Chinzorig Sukhbaatar; Chang-Hee Lee
Journal:  Environ Monit Assess       Date:  2019-01-28       Impact factor: 2.513

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.