| Literature DB >> 21961846 |
Hiroshi Muto1, Yuji Tani, Shigemasa Suzuki, Yuki Yokooka, Tamotsu Abe, Yuji Sase, Takayoshi Terashita, Katsuhiko Ogasawara.
Abstract
BACKGROUND: Since the shift from a radiographic film-based system to that of a filmless system, the change in radiographic examination costs and costs structure have been undetermined. The activity-based costing (ABC) method measures the cost and performance of activities, resources, and cost objects. The purpose of this study is to identify the cost structure of a radiographic examination comparing a filmless system to that of a film-based system using the ABC method.Entities:
Mesh:
Year: 2011 PMID: 21961846 PMCID: PMC3205032 DOI: 10.1186/1472-6963-11-246
Source DB: PubMed Journal: BMC Health Serv Res ISSN: 1472-6963 Impact factor: 2.655
Annual number of radiographic examinations
| Cost objects | New patients | Re-examined patients |
|---|---|---|
| Lumbar (six views) | 900 | 600 |
| Knee (three views) | 600 | 400 |
| Wrist (two views) | 600 | 400 |
| Other | 900 | 600 |
| Total | 3,000 | 2,000 |
Estimation of length of examination in minutes
| Lumbar | Knee | Wrist | Other | |
|---|---|---|---|---|
| Typically | ||||
| Transportation of film/order slip | 0.50 | 0.50 | 0.50 | 0.50 |
| Registration of patient information | 0.50 | 0.50 | 0.50 | 0.50 |
| Preparing room | 0.25 | 0.25 | 0.25 | 0.25 |
| Calling patient | 0.50 | 0.50 | 0.50 | 0.50 |
| Explanation of scan | 0.50 | 0.50 | 0.50 | 0.50 |
| Changing clothes | 2.00 | 2.00 | 0.00 | 1.33 |
| Positioning | 4.50 | 3.00 | 1.50 | 3.00 |
| Irradiation | 1.50 | 0.75 | 0.50 | 0.92 |
| Reading image | 6.00 | 3.00 | 2.00 | 3.67 |
| Aftercare | 0.50 | 0.50 | 0.50 | 0.50 |
| Changing clothes | 2.00 | 2.00 | 0.00 | 1.33 |
| Opinion/transmission | 1.50 | 0.75 | 0.50 | 0.92 |
| Transportation of film/order slip | 0.50 | 0.50 | 0.50 | 0.50 |
| Filmless system only | ||||
| Searching/checking previous image | 1.00 | 1.00 | 1.00 | 1.00 |
| Film-based system only | ||||
| Preparation of previous film image | 2.00 | 2.00 | 2.00 | 2.00 |
| Checking previous film image | 1.00 | 1.00 | 1.00 | 1.00 |
| Printing film | 6.00 | 3.00 | 2.00 | 3.67 |
| Preparation of film envelope | 0.50 | 0.50 | 0.50 | 0.50 |
| Checking film image | 1.50 | 0.75 | 0.50 | 0.92 |
Estimation of length of activity and machine per annum in minutes
| Filmless system | Film-based system | |
|---|---|---|
| CR system | 30,500 | 30,500 |
| X-ray equipment | 43,375 | 43,375 |
| Viewbox | 6,875 | |
| Radiologic technologist | 48,250 | 72,625 |
| Medical office personnel | 2,500 | 6,500 |
Resources per annum and resource drivers for a filmless system
| Cost (yen) | Resource driver (yen) | ||
|---|---|---|---|
| Direct costs | |||
| Total | 0 | ||
| Indirect costs | |||
| CR system | 1,600,000 | 52.5 | /minute |
| Depreciation of CR system | 1,000,000 | 2000 | /examination |
| X-ray equipment | 600,000 | 13.8 | /minute |
| Depreciation of X-ray equipment | 1,000,000 | 200.0 | /examination |
| Information system | 1,000,000 | 50.0 | /view |
| Depreciation of information system | 500,000 | 100.0 | /examination |
| Radiologic technologist | 2,412,500 | 50.0 | /minute |
| Medical office personnel | 41,667 | 16.7 | /minute |
| Administration | 200,000 | 40.0 | /examination |
| Total | 8,354,167 | ||
| Total cost | 8,354,167 | ||
Resources per annum and resource drivers for a film-based system
| Cost (yen) | Resource driver (yen) | ||
|---|---|---|---|
| Direct costs | |||
| Film (B5) | 3,180,000 | 159.0 | /film |
| Film envelope | 100,000 | 20.0 | /examination |
| Film disposal | 600,000 | 30.0 | /film |
| Total | 3,880,000 | ||
| Indirect costs | |||
| CR system | 1,600,000 | 52.5 | /minute |
| Depreciation of CR system | 1,000,000 | 2000 | /examination |
| X-ray equipment | 600,000 | 13.8 | /minute |
| Depreciation of X-ray equipment | 1,000,000 | 200.0 | /examination |
| Dry film imager | 400,000 | 20.0 | /film |
| Depreciation of dry film imager | 300,000 | 60.0 | /examination |
| Viewbox | 30,000 | 4.4 | /minute |
| Radiologic technologist | 3,631,250 | 50.0 | /minute |
| Medical office personnel | 108,333 | 16.7 | /minute |
| Administration | 200,000 | 40.0 | /examination |
| Total | 8,869,583 | ||
| Total cost | 12,749,583 | ||
Cost of radiographic examination for a filmless system
| Cost objects | Lumbar (6 views) | Knee (3 views) | Wrist (2 views) | Other | Total | |||
|---|---|---|---|---|---|---|---|---|
| Indirect costs | ||||||||
| Activity (Cost pool) | Activity driver | Cost (yen) | Cost (yen) | Cost (yen) | Cost (yen) | Cost (yen) | Rate | |
| Main activity | ||||||||
| Transportation of order slip | 8.33 | /examination | 12,500 | 8,333 | 8,333 | 12,500 | 41,667 | 0.5% |
| Registration of patient information | 51.23 | /examination | 76,844 | 51,230 | 51,230 | 76,844 | 256,148 | 3.1% |
| Searching/checking previous image | 50.00 | /examination | 30,000 | 20,000 | 20,000 | 30,000 | 100,000 | 1.2% |
| Preparating room | 63.83 | /minute | 23,937 | 15,958 | 15,958 | 23,937 | 79,791 | 1.0% |
| Calling patient | 63.83 | /minute | 47,875 | 31,916 | 31,916 | 47,875 | 159,582 | 1.9% |
| Explanation of scan | 63.83 | /minute | 47,875 | 31,916 | 31,916 | 47,875 | 159,582 | 1.9% |
| Changing clothes | 63.83 | /minute | 191,499 | 127,666 | 0 | 127,666 | 446,830 | 5.3% |
| Take photographs (reading image) | 116.29 | /minute | 1,046,627 | 436,095 | 232,584 | 683,215 | 2,398,520 | 28.7% |
| Aftercare | 116.29 | /minute | 87,219 | 58,146 | 58,146 | 87,219 | 290,730 | 3.5% |
| Changing clothes | 13.83 | /minute | 41,499 | 27,666 | 0 | 27,666 | 96,830 | 1.2% |
| Opinion/Transmission | 24.97 | /view | 224,769 | 74,923 | 49,949 | 149,846 | 499,488 | 6.0% |
| Transportation of order slip | 25.00 | /examination | 37,500 | 25,000 | 25,000 | 37,500 | 125,000 | 1.5% |
| Support activity | ||||||||
| Imaging administration by PACS | 50.00 | /view | 450,000 | 150,000 | 100,000 | 300,000 | 1,000,000 | 12.0% |
| Maintenance of the equipment/system | 500.00 | /examination | 750,000 | 500,000 | 500,000 | 750,000 | 2,500,000 | 29.9% |
| Other administration | 40.00 | /examination | 60,000 | 40,000 | 40,000 | 60,000 | 200,000 | 2.4% |
| Indirect costs total | 3,128,143 | 1,598,849 | 1,165,032 | 2,462,142 | 8,354,167 | 100.0% | ||
| Direct cost | ||||||||
| Direct costs total | 0 | 0 | 0 | 0 | 0 | 0.0% | ||
| Total cost | 3,128,143 | 1,598,849 | 1,165,032 | 2,462,142 | 8,354,167 | 100.0% | ||
| Cost of radiographic examination | 2,085 | 1,599 | 1,165 | 1,641 | ||||
Cost of radiographic examination for a film-based system
| Cost objects | Lumbar (6 views) | Knee (3 views) | Wrist (2 views) | Other | Total | |||
|---|---|---|---|---|---|---|---|---|
| Indirect costs | ||||||||
| Activity (Cost pool) | Activity driver | Cost (yen) | Cost (yen) | Cost (yen) | Cost (yen) | Cost (yen) | Rate | |
| Main activity | ||||||||
| Prepare previous film image | 33.33 | /examination | 20,000 | 13,333 | 13,333 | 20,000 | 66,667 | 0.5% |
| Transportation of film/order slip | 8.33 | /examination | 12,500 | 8,333 | 8,333 | 12,500 | 41,667 | 0.3% |
| Registration of patient information | 51.23 | /examination | 76,844 | 51,230 | 51,230 | 76,844 | 256,148 | 2.0% |
| Checking previous film image | 54.36 | /examination | 32,618 | 21,745 | 21,745 | 32,618 | 108,727 | 0.9% |
| Preparing room | 63.83 | /minute | 23,937 | 15,958 | 15,958 | 23,937 | 79,791 | 0.6% |
| Calling patient | 63.83 | /minute | 47,875 | 31,916 | 31,916 | 47,875 | 159,582 | 1.3% |
| Explanation of scan | 63.83 | /minute | 47,875 | 31,916 | 31,916 | 47,875 | 159,582 | 1.3% |
| Changing clothes | 63.83 | /minute | 191,499 | 127,666 | 0 | 127,666 | 446,830 | 3.5% |
| Take photographs (reading image) | 116.29 | /minute | 1,046,627 | 436,095 | 232,584 | 683,215 | 2,398,520 | 18.8% |
| Aftercare | 116.29 | /minute | 87,219 | 58,146 | 58,146 | 87,219 | 290,730 | 2.3% |
| Changing clothes | 13.83 | /minute | 41,499 | 27,666 | 0 | 27,666 | 96,830 | 0.8% |
| Opinion/Transmission | 24.97 | /view | 224,769 | 74,923 | 49,949 | 149,846 | 499,488 | 3.9% |
| Printing film (preparation of film envelope) | 68.75 | /view | 618,750 | 206,250 | 137,500 | 412,500 | 1,375,000 | 10.8% |
| Checking film image | 13.25 | /view | 119,260 | 39,753 | 26,502 | 79,507 | 265,023 | 2.1% |
| Transportation of film/order slip | 25.00 | /examination | 37,500 | 25,000 | 25,000 | 37,500 | 125,000 | 1.0% |
| Support activity | ||||||||
| Maintenance of the equipment/system | 460.00 | /examination | 690,000 | 460,000 | 460,000 | 690,000 | 2,300,000 | 18.0% |
| Other administration | 40.00 | /examination | 60,000 | 40,000 | 40,000 | 60,000 | 200,000 | 1.6% |
| Indirect costs total | 3,378,772 | 1,669,931 | 1,204,113 | 2,616,767 | 8,869,583 | 69.6% | ||
| Direct costs | ||||||||
| Film (B5) | 159.0 | /film | 1,431,000 | 477,000 | 318,000 | 954,000 | 3,180,000 | 24.9% |
| Film envelope | 20.0 | 30,000 | 20,000 | 20,000 | 30,000 | 100,000 | 0.8% | |
| Film disposal | 30.0 | /film | 270,000 | 90,000 | 60,000 | 180,000 | 600,000 | 4.7% |
| Direct costs total | 1,731,000 | 587,000 | 398,000 | 1,164,000 | 3,880,000 | 30.4% | ||
| Total cost | 5,109,772 | 2,256,931 | 1,602,113 | 3,780,767 | 12,749,583 | 100.0% | ||
| Cost of radiographic examination | 3,407 | 2,257 | 1,602 | 2,521 | ||||
Sensitivity analyses of examination costs for a filmless system
| Lumbar(yen) | Knee(yen) | List(yen) | Other(yen) | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Number of examinations | 80% | 2,447 | 117.3% | 1,876 | 117.3% | 1,384 | 118.8% | 1,933 | 117.7% |
| 120% | 1,844 | 88.4% | 1,414 | 88.4% | 1,019 | 87.5% | 1,447 | 88.2% | |
| Labor costs | 80% | 1,958 | 93.9% | 1,501 | 93.9% | 1,107 | 95.0% | 1,546 | 94.2% |
| 120% | 2,213 | 106.1% | 1,697 | 106.1% | 1,223 | 105.0% | 1,737 | 105.8% | |
| Depreciation costs of equipment | 80% | 1,964 | 94.2% | 1,515 | 94.8% | 1,118 | 96.0% | 1,557 | 94.8% |
| 120% | 2,207 | 105.8% | 1,683 | 105.2% | 1,212 | 104.0% | 1,726 | 105.2% | |
| Depreciation costs of system | 80% | 2,025 | 97.1% | 1,569 | 98.1% | 1,145 | 98.3% | 1,601 | 97.6% |
| 120% | 2,145 | 102.9% | 1,629 | 101.9% | 1,185 | 101.7% | 1,681 | 102.4% | |
| Maintenance costs of equipment | 80% | 1,985 | 95.2% | 1,499 | 93.7% | 1,065 | 91.4% | 1,541 | 93.9% |
| 120% | 2,185 | 104.8% | 1,699 | 106.3% | 1,265 | 108.6% | 1,741 | 106.1% | |
| Maintenance costs of system | 80% | 2,065 | 99.0% | 1,579 | 98.7% | 1,145 | 98.3% | 1,621 | 98.8% |
| 120% | 2,105 | 101.0% | 1,619 | 101.3% | 1,185 | 101.7% | 1,661 | 101.2% | |
| Time (skill of personnel) | 80% | 1,978 | 94.9% | 1,524 | 95.3% | 1,103 | 94.7% | 1,559 | 95.0% |
| 120% | 2,193 | 105.1% | 1,675 | 104.7% | 1,226 | 105.2% | 1,724 | 105.0% | |
| Time (disease severity of patients) | 80% | 2,006 | 96.2% | 1,530 | 95.7% | 1,137 | 97.6% | 1,583 | 96.5% |
| 120% | 2,165 | 103.8% | 1,667 | 104.2% | 1,194 | 102.5% | 1,700 | 103.5% | |
| Other administrative expenses | 80% | 2,077 | 99.6% | 1,591 | 99.5% | 1,157 | 99.3% | 1,633 | 99.5% |
| 120% | 2,093 | 100.4% | 1,607 | 100.5% | 1,173 | 100.7% | 1,649 | 100.5% | |
Sensitivity analyses of examination costs for a film-based system
| Lumbar(yen) | Knee(yen) | List(yen) | Other(yen) | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Number of examinations | 80% | 3,715 | 109.1% | 2,503 | 110.9% | 1,797 | 112.2% | 2,773 | 110.0% |
| 120% | 3,201 | 94.0% | 2,093 | 92.7% | 1,472 | 91.9% | 2,352 | 93.3% | |
| Labor costs | 80% | 3,203 | 94.0% | 2,120 | 93.9% | 1,517 | 94.7% | 2,374 | 94.2% |
| 120% | 3,610 | 106.0% | 2,394 | 106.1% | 1,687 | 105.3% | 2,667 | 105.8% | |
| Depreciation costs of equipment | 80% | 3,260 | 95.7% | 2,160 | 95.7% | 1,546 | 96.5% | 2,418 | 96.0% |
| 120% | 3,553 | 104.3% | 2,354 | 104.3% | 1,658 | 103.5% | 2,623 | 104.0% | |
| Maintenance costs of equipment | 80% | 3,315 | 97.3% | 2,165 | 95.9% | 1,510 | 94.3% | 2,429 | 96.3% |
| 120% | 3,499 | 102.7% | 2,349 | 104.1% | 1,694 | 105.7% | 2,613 | 103.7% | |
| Time (skill of personnel) | 80% | 3,320 | 97.5% | 2,196 | 97.3% | 1,542 | 96.3% | 2,449 | 97.2% |
| 120% | 3,531 | 103.7% | 2,343 | 103.8% | 1,671 | 104.3% | 2,615 | 103.8% | |
| Time (disease severity of patients) | 80% | 3,328 | 97.7% | 2,188 | 97.0% | 1,574 | 98.2% | 2,462 | 97.7% |
| 120% | 3,486 | 102.3% | 2,325 | 103.0% | 1,631 | 101.8% | 2,579 | 102.3% | |
| Other administrative expenses | 80% | 3,399 | 99.8% | 2,249 | 99.6% | 1,594 | 99.5% | 2,513 | 99.7% |
| 120% | 3,415 | 100.2% | 2,265 | 100.4% | 1,610 | 100.5% | 2,529 | 100.3% | |