| Literature DB >> 20644619 |
Jan H Kolaczinski1, Kara Hanson, Emily Robinson, Diana Picon, Anthony Sabasio, Martin Mpakateni, Mounir Lado, Stephen Moore, Nora Petty, Simon Brooker.
Abstract
BACKGROUND: Increasing emphasis on integrated control of neglected tropical diseases (NTDs) requires identification of co-endemic areas. Integrated surveys for lymphatic filariasis (LF), schistosomiasis and soil-transmitted helminth (STH) infection have been recommended for this purpose. Integrated survey designs inevitably involve balancing the costs of surveys against accuracy of classifying areas for treatment, so-called implementation units (IUs). This requires an understanding of the main cost drivers and of how operating procedures may affect both cost and accuracy of surveys. Here we report a detailed cost analysis of the first round of integrated NTD surveys in Southern Sudan. METHODS ANDEntities:
Mesh:
Year: 2010 PMID: 20644619 PMCID: PMC2903472 DOI: 10.1371/journal.pntd.0000745
Source DB: PubMed Journal: PLoS Negl Trop Dis ISSN: 1935-2727
Reference case scenario.
| Parameter | Suggested Reference Scenario | Explanation |
| Perspective | Provider | Use provider perspective unless considerable survey contributions were made by other parties and resources are available to measure all of these inputs, including the opportunity cost of survey participants. In this case present results from both the provider and societal viewpoints. |
| Output | Implementation unit surveyed | Implementation unit (e.g. district) surveyed to allow classification for intervention according to WHO recommended thresholds |
| Cost data | Include:All survey costs (e.g. wages, transport)Time cost of survey staff, including volunteersTransportation and other non-medical servicesDonated itemsOverhead costs | Use ingredient approach with cost categories as suggested in |
| Currency | US$ | Costs should be presented in US$, indicating the year of conversion. |
| Lifespan of capital items | Vehicles: 4 yearsOther equipment: 2 years | Establish average lifespan of capital items under local conditions and provide details on these in the narrative. Explore the impact of these assumptions in the sensitivity analysis. |
| Adjustment of financial costs to calculated economic costs | ||
| Annualisation | Lifespan of capital items as specified above | To obtain an equivalent annual cost for each capital outlay, an annualisation procedure needs to be followed. This requires an estimate of the lifespan of each capital item and a decision on the discount rate to be used (see below).A proportion of the annualised costs should be included as economic costs. We recommend that time (i.e. days of use of the equipment) is used for this calculation. |
| Discount rate | 3% | Base-case calculations should use 3%, to be consistent with World Bank recommendations |
| Reporting of results | ||
| Cost estimate | Cost per implementation unit surveyed | Provide costs in US$Specify year in which costs were calculated or adjusted to |
Financial and economic costs, and cost profiles, for an integrated NTD survey in Northern Bahr-el-Ghazal State.
| Total financial cost (USD) | % of financial cost | Total economic cost (USD) | % of economic cost | |
|
| ||||
| Vehicles | 4,187 | 2.9% | 4,504 | 2.7% |
| Communication & IT equipment | 858 | 0.6% | 906 | 0.6% |
| Accommodation equipment | 378 | 0.3% | 395 | 0.2% |
| Survey equipment | 776 | 0.5% | 1,206 | 0.7% |
|
|
|
|
|
|
|
| ||||
| Travel | 15,183 | 10.4% | 18,688 | 11.4% |
| Vehicle fuel & maintenance | 10,635 | 7.3% | 10,635 | 6.5% |
| Accommodation & sustenance | 18,188 | 12.5% | 20,688 | 12.6% |
| Survey consumables | 44,346 | 30.4% | 44,346 | 26.9% |
| Communication | 1,019 | 0.7% | 1,019 | 0.6% |
| Personnel | 50,084 | 34.4% | 62,230 | 37.8% |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
| ||
|
|
|
| ||
| Counties surveyed | 5 | |||
| Payams surveyed | 21 | |||
|
|
| |||
|
|
| |||
*: Proportions were calculated on the subtotal, i.e. excluding the overhead.
Sensitivity of cost estimates to underlying assumptions or modification of routine operating procedures.
| Assumptions tested | USD/county classified | % deviation from base case | USD/payam classified | % deviation from base case |
| Base case | 40,206 | - | 9,573 | - |
| Discount rate: | ||||
| 0% | 40,119 | −0.2% | 9,552 | −0.2% |
| 10% | 40,417 | +0.5% | 9,623 | +0.5% |
| Vehicle lifespan: | ||||
| 7.5 years | 39,721 | −1.2% | 9,457 | −1.2% |
| Urinary schistosomiasis diagnosis: | ||||
| Dipstick test only | 39,379 | −2.1% | 9,376 | −2.1% |
| Testing for LF infection: | ||||
| County level only | 30,291 | −24.7% | 7,212 | −24.7% |
| Type/Category | Ingredients |
|
| |
| Vehicles |
Vehicles, including freight charges Vehicle parts with a unit cost of USD 100 or more Any vehicle equipment expected to last for more than one year (e.g. first aid kits) |
| Communications & IT Equipment |
High Frequency (HF) and Very High Frequency (VHF) radios Phones (fixed, mobile, satellite) Global Positioning System (GPS) devices, Geographic Information Systems (GIS) software and manuals Computers |
| Accommodation equipment |
Camping equipment estimated to last >1 year Generator |
| Survey equipment |
Microscopes Laboratory glassware and storage containers Furniture (i.e. plastic tables and chairs) All durable equipment for Kato-Katz test and urine filtration |
|
| |
| Travel |
Airfares & short-term vehicle hire (e.g. during preparatory activities) Per-diems Visas and other in-country registration fees Accommodation during travel to survey area Travel insurance and pre-travel medical expenses Fuel costs associated with moving vehicles to survey area |
| Fuel/Maintenance |
Fuel for vehicles during field work & all costs associated with obtaining the fuel, such as loading/unloading of fuel barrels Any maintenance costs, including parts with a unit cost below USD 100 Vehicle insurance |
| Accommodation & sustenance |
Rental of guesthouse Hotel bills All costs associated with purchasing and preparing food Cook and guesthouse guards Camping equipment estimated to last <1 year |
| Survey consumables |
Laboratory consumables, including rapid diagnostic tests and drugs to treat survey participants Freight charges for import of consumables Stationary items T-shirts and other types of identification worn by members of survey team |
| Communication |
Mobile and satellite phone credit |
| Personnel |
Salaries paid to drivers, supervisors, laboratory staff, village guides and consultants Field allowances Staff time for cross-checking of slides Technical support time for data entry and analysis |