| Literature DB >> 19826555 |
John J Graff1, Nalini Sathiakumar, Maurizio Macaluso, George Maldonado, Robert Matthews, Elizabeth Delzell.
Abstract
In a follow-up study of mortality among North American synthetic rubber industry workers, cumulative exposure to 1,3-butadiene was positively associated with leukemia. Problems with historical exposure estimation, however, may have distorted the association. To evaluate the impact of potential inaccuracies in exposure estimation, we conducted uncertainty analyses of the relation between cumulative exposure to butadiene and leukemia. We created the 1,000 sets of butadiene estimates using job-exposure matrices consisting of exposure values that corresponded to randomly selected percentiles of the approximate probability distribution of plant-, work area/job group-, and year specific butadiene ppm. We then analyzed the relation between cumulative exposure to butadiene and leukemia for each of the 1,000 sets of butadiene estimates. In the uncertainty analysis, the point estimate of the RR for the first non zero exposure category (>0-<37.5 ppm-years) was most likely to be about 1.5. The rate ratio for the second exposure category (37.5-<184.7 ppm-years) was most likely to range from 1.5 to 1.8. The RR for category 3 of exposure (184.7-<425.0 ppm-years) was most likely between 2.1 and 3.0. The RR for the highest exposure category (425.0+ ppm-years) was likely to be between 2.9 and 3.7. This range off RR point estimates can best be interpreted as a probability distribution that describes our uncertainty in RR point estimates due to uncertainty in exposure estimation. After considering the complete probability distributions of butadiene exposure estimates, the exposure-response association of butadiene and leukemia was maintained. This exercise was a unique example of how uncertainty analyses can be used to investigate and support an observed measure of effect when occupational exposure estimates are employed in the absence of direct exposure measurements.Entities:
Keywords: 1,3-butadiene; epidemiology; leukemia; methods; uncertainty analysis; workplace exposures
Mesh:
Substances:
Year: 2009 PMID: 19826555 PMCID: PMC2760421 DOI: 10.3390/ijerph6092436
Source DB: PubMed Journal: Int J Environ Res Public Health ISSN: 1660-4601 Impact factor: 3.390
Figure 1.Creation of 1,000 datasets for uncertainty analyses.
Summary of relative rates for butadiene ppm-years and leukemia from uncertainty analyses of 1,000 alternative datasets of exposure estimates.
| 0 | 1.0 | 1.0 | 1.0 | 1.0 |
| >0–<33.7 | 1.2 | 1.8 | 1.5 | 1.5 |
| 33.7–<184.7 | 1.1 | 2.2 | 1.6 | 1.6 |
| 184.7–<425.0 | 1.2 | 3.8 | 2.6 | 2.6 |
| 425.0+ | 2.4 | 4.3 | 3.3 | 3.3 |
Categories based on quartiles of exposed leukemia decedents, used in main analyses, in which exposure estimates derived from a job-exposure matrix containing eight-hour time-weighted average butadiene intensities that corresponded to the mean of the approximate probability distribution of estimates for each plant/work area/job group/calendar year combination.
Figure 2.Distribution of leukemia relative rate by category of butadiene ppm-years*, 1,000 uncertainty analysis Poisson regression models.
* Categories were quartiles of BD ppm-years among exposed leukemia decedents, used in main analyses, in which exposure estimates were derived from a job-exposure matrix containing eight-hour time weighted average butadiene intensities corresponding to the mean of the approximate probability distribution of estimates for each plant/work area/job group/calendar year combination.
† Leukemia relative rate and 95% CI for BD ppm-years in the main analysis.
Number of datasets displaying an nonmonotonic dose-response pattern by type of pattern.
| RR2 = RR1 | 116 |
| RR3 = RR2 | 19 |
| RR3 = RR2 = RR1 | 1 |
| RR4 = RR3 | 20 |
| RR4 = RR3 & RR2 = RR1 | 10 |
| RR4 < RR3 | 59 |
| RR4 < RR3 & RR2 = RR1 | 20 |
| RR3 < RR2 | 43 |
| RR3 < RR2 = RR1 | 1 |
| RR2 < RR1 | 182 |
| RR4 = RR3 & RR2 < RR1 | 17 |
| RR4 < RR3 & RR2 < RR1 | 38 |
| RR3 < RR2 < RR1 | 1 |
RR1, relative rate for >0–<33.7 butadiene ppm-years; RR2, relative rate for 33.7–<184.7 butadiene ppm-years; RR3, relative rate for 184.7–<425.1 butadiene ppm-years; RR4, relative rate for 425+ butadiene ppm-years.
Work history of one subject with butadiene (BD) ppm used in main analyses.
| 1 | 812 | 08/27/1943 | 09/24/1943 | 28 | 36.0066 | 2.76 |
| 2 | 812 | 09/24/1943 | 12/31/1943 | 98 | 36.0066 | 12.42 |
| 3 | 812 | 12/31/1943 | 01/23/1944 | 23 | 36.2725 | 14.71 |
| 4 | 812 | 01/23/1944 | 10/01/1944 | 252 | 36.2725 | 39.73 |
| 5 | 817 | 10/01/1944 | 12/31/1944 | 91 | 43.1242 | 50.48 |
| 6 | 816 | 12/31/1944 | 12/12/1945 | 346 | 42.9674 | 91.18 |
| 7 | 816 | 12/12/1945 | 12/31/1945 | 19 | 42.9674 | 93.41 |
| 8 | 816 | 12/31/1945 | 01/06/1946 | 6 | 42.5815 | 94.11 |
| 9 | 816 | 01/06/1946 | 12/31/1946 | 359 | 42.5815 | 135.97 |
| 10 | 816 | 12/31/1946 | 12/31/1947 | 365 | 42.7788 | 178.72 |
| 11 | 816 | 12/31/1947 | 10/31/1948 | 305 | 37.3081 | 209.87 |
| 12 | 817 | 10/31/1948 | 12/31/1948 | 61 | 43.1242 | 217.07 |
| 13 | 817 | 12/31/1948 | 12/31/1949 | 365 | 43.1242 | 260.17 |
| 14 | 817 | 12/31/1949 | 10/22/1950 | 295 | 43.1242 | 295.00 |
| 15 | 817 | 10/22/1950 | 12/31/1950 | 70 | 43.1242 | 303.26 |
| 16 | 817 | 12/31/1950 | 12/31/1951 | 365 | 43.1242 | 346.36 |
| 17 | 817 | 12/31/1951 | 12/31/1952 | 366 | 43.1242 | 389.57 |
| 18 | 817 | 12/31/1952 | 12/31/1953 | 365 | 43.1242 | 432.66 |
| 19 | 817 | 12/31/1953 | 12/31/1954 | 365 | 43.1242 | 475.76 |
| 20 | 817 | 12/31/1954 | 12/31/1955 | 365 | 43.1242 | 518.85 |
| 21 | 817 | 12/31/1955 | 12/31/1956 | 366 | 43.1242 | 562.06 |
| 22 | 817 | 12/31/1956 | 12/31/1957 | 365 | 43.1242 | 605.16 |
| 23 | 817 | 12/31/1957 | 12/31/1958 | 365 | 43.1242 | 648.25 |
| 24 | 817 | 12/31/1958 | 12/31/1959 | 365 | 43.1242 | 691.35 |
| 25 | 817 | 12/31/1959 | 12/31/1960 | 366 | 40.4189 | 731.85 |
| 26 | 817 | 12/31/1960 | 12/31/1961 | 365 | 40.4189 | 772.24 |
| 27 | 817 | 12/31/1961 | 12/31/1962 | 365 | 40.4189 | 812.63 |
| 28 | 817 | 12/31/1962 | 03/14/1963 | 74 | 40.4189 | 820.82 |
| 29 | 817 | 04/30/1963 | 12/31/1963 | 245 | 40.4189 | 847.93 |
| 30 | 817 | 12/31/1963 | 12/31/1964 | 366 | 40.4189 | 888.44 |
| 31 | 817 | 12/31/1964 | 12/31/1965 | 365 | 40.4189 | 928.83 |
| 32 | 817 | 12/31/1965 | 12/31/1966 | 365 | 40.4189 | 969.22 |
| 33 | 817 | 12/31/1966 | 12/31/1967 | 365 | 40.4189 | 1009.61 |
| 34 | 817 | 12/31/1967 | 12/31/1968 | 366 | 40.4189 | 1050.11 |
| 35 | 817 | 12/31/1968 | 10/31/1969 | 304 | 40.4189 | 1083.75 |
| 36 | 817 | 10/31/1969 | 12/31/1969 | 61 | 40.4189 | 1090.50 |
| 37 | 817 | 12/31/1969 | 12/31/1970 | 365 | 40.4189 | 1130.89 |
| 38 | 817 | 12/31/1970 | 04/29/1971 | 120 | 40.4189 | 1144.17 |
Work area/job group 812 = polymerization operative, unspecified; 816 = Polymerization reactor recovery; 817 = recovery in SBR polymerization.
Component tasks entailing butadiene exposure, work area/job group 817 (recovery in SBR polymerization, including compressor house and high solids recovery operations), plant 4.
| 301 | Recovery area background |
| 303 | Water draw-off from vacuum pumps |
| 305 | Minor maintenance of recovery compressor house |
| 312 | Drain water from butadiene decanter (recycle tanks) |
| 315 | Minor maintenance of butadiene pumps |
Description of task 305, exposure scenario, and parameters used to estimate exposure to butadiene.
| • Butadiene emission rate, Q | |
– Lower limit = 18 lb/day – Upper limit = 27 lb/day | |
| • Duration of task (minutes) | |
– Lower limit = 10 – Upper limit = 20 | |
| • Duration of exposure | |
– Lower limit = 10 – Upper limit = 20 | |
| • Frequency of task = 4 times/shift | |
| • Distance of the operator = 1 meter | |
| • Wind speed (meters/second) | |
– Upper limit = 0.42 – Lower limit = 1.44 | |
| • Probability of operator standing directly in the plume | |
– Lower limit = 0.125 – Upper limit = 0.25 | |
Upper limit is lower than lower limit because the lower the wind speed, the higher the exposure.
Exposure estimation model and calculation of lower and upper limits of nonzero butadiene partial TWA, task 305.
| Lower limit (LL): | |
| Point source exposure, if operator was in the emission plume: | Eppm = [1000 * 24.45 * 0.09458/(54.1 * 0.136 * 11.84 * 1.44)] = 218.2627 |
| Partial time-weighted average (ppm) if in the plume: | TWA (task 305) = [Eppm(LL) * duration (LL) * frequency (LL)]/480 = [218.2627 * 10 * 4]/480 = 18.1886 ppm |
| Upper limit (UL): | |
| Point source exposure if operator was in the emission plume: | Eppm = [1000 * 24.45 * 0.141875 /(54.1 * 0.136 * 11.84 * 0.42)] = 1122.5334 |
| Partial time-weighted average (ppm) if in the plume: | TWA (task 305) = [Eppm(UL) * duration (UL) * frequency (UL)]/480 = [1122.5334 * 20 * 4]/480 = 187.0889 ppm |
Distribution of butadiene (BD) ppm-minutes, 1943–1983, task 305, plant four.
| 1–80 | 0 | 87 | 21850.47 | 94 | 28984.96 |
| 81 | 5866.33 | 88 | 22790.27 | 95 | 30450.26 |
| 82 | 12203.21 | 89 | 23681.70 | 96 | 32126.42 |
| 83 | 17268.85 | 90 | 24669.88 | 97 | 34454.32 |
| 84 | 18717.13 | 91 | 25609.69 | 98 | 37932.57 |
| 85 | 19896.17 | 92 | 26594.45 | 99 | 45111.79 |
| 86 | 20910.66 | 93 | 27721.00 | ||
Combination of task-specific butadiene exposure estimates to obtain the distribution of eight-hour time-weighted average estimates (BD ppm) for work area/job group 817, plant four, 1950.
| 5 | 9213.70 | 45 | 14415.39 | 85 | 33112.75 |
| 10 | 10208.70 | 50 | 15007.26 | 90 | 38563.94 |
| 15 | 10920.08 | 55 | 15666.86 | 95 | 45231.64 |
| 20 | 11557.11 | 60 | 16382.51 | ||
| 25 | 12149.74 | 65 | 17295.72 | min | 5435.93 |
| 30 | 12718.85 | 70 | 18323.38 | mean | 20699.60 |
| 35 | 13283.74 | 75 | 19912.71 | max | 130474.33 |
| 40 | 13788.17 | 80 | 23472.45 | ||
Work history of one subject with butadiene (BD) ppm used in dataset 70 of uncertainty analysis.
| 1 | 812 | 08/27/1943 | 09/24/1943 | 28 | 18.5570 | 1.42 |
| 2 | 812 | 09/24/1943 | 12/31/1943 | 98 | 18.5570 | 6.40 |
| 3 | 812 | 12/31/1943 | 01/23/1944 | 23 | 18.5622 | 7.57 |
| 4 | 812 | 01/23/1944 | 10/01/1944 | 252 | 18.5622 | 20.38 |
| 5 | 817 | 10/01/1944 | 12/31/1944 | 91 | 25.3114 | 26.68 |
| 6 | 816 | 12/31/1944 | 12/12/1945 | 346 | 16.4205 | 42.24 |
| 7 | 816 | 12/12/1945 | 12/31/1945 | 19 | 16.4205 | 43.09 |
| 8 | 816 | 12/31/1945 | 01/06/1946 | 6 | 16.4347 | 43.36 |
| 9 | 816 | 01/06/1946 | 12/31/1946 | 359 | 16.4347 | 59.52 |
| 10 | 816 | 12/31/1946 | 12/31/1947 | 365 | 16.4499 | 75.96 |
| 11 | 816 | 12/31/1947 | 10/31/1948 | 305 | 16.6307 | 89.84 |
| 12 | 817 | 10/31/1948 | 12/31/1948 | 61 | 25.3126 | 94.07 |
| 13 | 817 | 12/31/1948 | 12/31/1949 | 365 | 25.3045 | 119.36 |
| 14 | 817 | 12/31/1949 | 10/22/1950 | 295 | 25.3120 | 139.80 |
| 15 | 817 | 10/22/1950 | 12/31/1950 | 70 | 25.3120 | 144.65 |
| 16 | 817 | 12/31/1950 | 12/31/1951 | 365 | 25.3614 | 169.20 |
| 17 | 817 | 12/31/1951 | 12/31/1952 | 366 | 25.3120 | 195.36 |
| 18 | 817 | 12/31/1952 | 12/31/1953 | 365 | 25.3366 | 220.68 |
| 19 | 817 | 12/31/1953 | 12/31/1954 | 365 | 25.3100 | 245.97 |
| 20 | 817 | 12/31/1954 | 12/31/1955 | 365 | 25.3139 | 271.27 |
| 21 | 817 | 12/31/1955 | 12/31/1956 | 366 | 25.3084 | 296.63 |
| 22 | 817 | 12/31/1956 | 12/31/1957 | 365 | 25.3092 | 321.92 |
| 23 | 817 | 12/31/1957 | 12/31/1958 | 365 | 25.3137 | 347.22 |
| 24 | 817 | 12/31/1958 | 12/31/1959 | 365 | 25.3126 | 372.51 |
| 25 | 817 | 12/31/1959 | 12/31/1960 | 366 | 23.7432 | 396.30 |
| 26 | 817 | 12/31/1960 | 12/31/1961 | 365 | 23.7102 | 415.00 |
| 27 | 817 | 12/31/1961 | 12/31/1962 | 365 | 23.7005 | 443.68 |
| 28 | 817 | 12/31/1962 | 03/14/1963 | 74 | 23.6767 | 448.41 |
| 29 | 817 | 04/30/1963 | 12/31/1963 | 245 | 23.6767 | 464.30 |
| 30 | 817 | 12/31/1963 | 12/31/1964 | 366 | 23.7113 | 488.06 |
| 31 | 817 | 12/31/1964 | 12/31/1965 | 365 | 23.6885 | 511.73 |
| 32 | 817 | 12/31/1965 | 12/31/1966 | 365 | 23.6767 | 535.39 |
| 33 | 817 | 12/31/1966 | 12/31/1967 | 365 | 23.6888 | 559.06 |
| 34 | 817 | 12/31/1967 | 12/31/1968 | 366 | 23.6718 | 582.78 |
| 35 | 817 | 12/31/1968 | 10/31/1969 | 304 | 23.7432 | 602.54 |
| 36 | 817 | 10/31/1969 | 12/31/1969 | 61 | 23.7432 | 606.51 |
| 37 | 817 | 12/31/1969 | 12/31/1970 | 365 | 23.6718 | 630.16 |
| 38 | 817 | 12/31/1970 | 04/29/1971 | 120 | 23.7115 | 637.89 |
Work area/job group 812 = polymerization operative, unspecified; 816 = polymerization reactor recovery; 817 = recovery in SBR polymerization.