| Literature DB >> 17503146 |
Jian-Ying Xu1, Li-Ding Chen, Yi-He Lu, Bo-Jie Fu.
Abstract
This article examines the sustainability of the Grain for Green Project in the Wolong Nature Reserve. Pertinent data were collected through a questionnaire survey and a spatial analysis of reforested lands. The study results identified four critical issues that may influence the sustainability of the project in the study area. The first issue is concerned with the project's impacts on local sustenance. Because local grain consumption depends greatly on compensation awarded by the project, the potential for sustainability of the project is compromised. The second issue is that the project causes negative effects on local incomes in the Wolong Nature Reserve, which may undermine local economic prospects. The third issue is that the project failed to deliver suitable habitat for the giant panda, although two of the suitability requirements that deal with landform features were met. Lastly, the project neglects great differences among geographical areas in the country, providing the same compensation and length of compensation period to all participants. Appropriate compensation mechanisms should be established and adapted to local economic, environmental, and social conditions. In managing nature reserves and moving toward sustainability, ensuring all aspects of local socioeconomic and ecological/environmental issues are properly addressed is a real challenge. Based on our study, some recommendations for improving sustainability of the project are given.Entities:
Mesh:
Year: 2007 PMID: 17503146 DOI: 10.1007/s00267-006-0113-1
Source DB: PubMed Journal: Environ Manage ISSN: 0364-152X Impact factor: 3.266