| Literature DB >> 16811583 |
Abstract
Human subjects given choices among 10 different pairs of concurrent fixed-ratio schedules preferred the smaller ratio. After a preference had been determined, timeout of increasing duration followed the completion of the preferred schedule. The larger the fixed-ratio difference, the longer the timeout necessary to produce the shift to the previously nonpreferred ratio. Responses by two of three subjects were unaffected by changes from response-dependent to response-independent pay.Entities:
Year: 1972 PMID: 16811583 PMCID: PMC1333961 DOI: 10.1901/jeab.1972.17-213
Source DB: PubMed Journal: J Exp Anal Behav ISSN: 0022-5002 Impact factor: 2.468