Literature DB >> 15259958

Experience and lessons learned from sewage sludge pyrolysis in Australia.

T R Bridle1, S Skrypski-Mantele.   

Abstract

Management of sewage sludge via "publicly acceptable" methods is becoming increasingly difficult, primarily due to health and environmental concerns with respect to reuse of the product in agriculture. Consequently thermal processes are gaining popularity with significantly increased interest being shown in pyrolysis and gasification processes, due to their "non-incineration status". One such process is the ENERSLUDGE technology which has been developed and commercialised by Environmental Solutions International Ltd (ESI). The world's first commercial ENERSLUDGE plant is located at the Subiaco Wastewater Treatment Plant (WWTP) that was handed over to the client, the Water Corporation of Western Australia in June 2001. Extensive design knowledge and operational experience has now been accumulated from this commercial pyrolysis facility and future applications of the technology will benefit immensely from the lessons learned and experience gained from this facility.

Mesh:

Substances:

Year:  2004        PMID: 15259958

Source DB:  PubMed          Journal:  Water Sci Technol        ISSN: 0273-1223            Impact factor:   1.915


  3 in total

1.  Technological options for the management of biosolids.

Authors:  Hailong Wang; Sally L Brown; Guna N Magesan; Alison H Slade; Michael Quintern; Peter W Clinton; Tim W Payn
Journal:  Environ Sci Pollut Res Int       Date:  2008-05-17       Impact factor: 4.223

2.  Characterization of top phase oil obtained from co-pyrolysis of sewage sludge and poplar sawdust.

Authors:  Wu Zuo; Baosheng Jin; Yaji Huang; Yu Sun
Journal:  Environ Sci Pollut Res Int       Date:  2014-04-23       Impact factor: 4.223

Review 3.  Pyrolysis and gasification at water resource recovery facilities: Status of the industry.

Authors:  Lloyd J Winchell; John J Ross; Dominic A Brose; Thaís B Pluth; Xavier Fonoll; John W Norton; Katherine Y Bell
Journal:  Water Environ Res       Date:  2022-03-04       Impact factor: 3.306

  3 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.