| Literature DB >> 8111159 |
Abstract
A general survey of the procedure of the restoration of a school building is presented. The effects of several measures (i.e. ventilation) and restoration steps as well of problems of removal of PCB containing materials and financial charges are discussed and evaluated. It was possible to reduce the indoor air contamination below the value of 300 ng/m3 by removal of the PCB-containing sealants and sealing the secondary contaminated walls with appropriate materials.Entities:
Mesh:
Substances:
Year: 1993 PMID: 8111159
Source DB: PubMed Journal: Gesundheitswesen ISSN: 0941-3790