| Literature DB >> 4046999 |
Abstract
An analysis of unscheduled downtime and of patient treatment data for a 6-MV linear accelerator is presented for a 7-yr period. Following the initial year of clinical use, the unscheduled downtime has averaged 2.4%, with a corresponding loss of 1.3% in patient treatments. The quality assurance, preventive maintenance, and repairs are handled in-house, with an investment of approximately 500 man-hours annually.Entities:
Mesh:
Year: 1985 PMID: 4046999 DOI: 10.1118/1.595764
Source DB: PubMed Journal: Med Phys ISSN: 0094-2405 Impact factor: 4.071