Wei Zheng1, Yong Ye1, Hongbing Zang1.
Abstract
Prefabricated construction is an emerging technology in the construction industry, which can effectively meet the construction scale requirements of construction projects. It can also shorten the construction time and reduce unnecessary consumption of construction resources. The introduction of BIM + VR technology into the prefabricated construction industry will improve and improve the construction of the relevant construction industry chain, architectural visualization design, architectural virtualization construction, project cost management, and production operations. In particular, the application of BIM + VR technology to the construction of prefabricated buildings can further refine the entire construction process and improve the overall quality of the project. The application advantages of these two technologies are analyzed, and the practical application of advanced technologies in building construction is discussed for reference.Entities:
Mesh:
Year: 2022 PMID: 36225548 PMCID: PMC9550401 DOI: 10.1155/2022/9756255
Source DB: PubMed Journal: Comput Intell Neurosci
Comparison of traditional construction and assembled construction.
| Construction methods | Stage | Main contents |
|---|---|---|
| Traditional construction method | Design | Only starting from the architectural design structure, without considering the construction method, construction technology, etc. |
| Construction | Workers put production factors on-site by themselves, mainly manual work, and the production efficiency is low | |
| Management and benefits | The design-production-construction links are separated, the industrial chain is scattered, management is difficult, and enterprise efficiency is low | |
|
| ||
| Prefabricated building construction method | Design | The design is matched with standardization and systematic integration technology, pays attention to the coordination and cooperation of the industrial chain, and considers the modules and standards of the components, the integration technology and parameters of the building system, etc. |
| Production | The proportion of components and production factors is carried out according to the design requirements, and the production is unified in the factory, and the production efficiency is high | |
| Construction assembly | On-site assembly of components and building systems, integration of construction and design, and factory production | |
| Management and benefits | The whole process of the design-production-construction link is intensive and information-based, which creates higher corporate benefits | |
Figure 1Split design process of construction engineering.