Sisi Yao1,2,3,4, Biao Peng5,6,7, Luyao Wang5,6,7, Hengda Chen8.
Abstract
Continuous rigid-frame bridges are widely used, but the large deflection in the mid-span during operation has always been their disease. This problem is generally solved by setting the finished bridge pre-camber. There are many calculation methods for pre-camber, and the effects are different. In this paper, based on a large number of design parameters of continuous rigid-frame bridges obtained from the investigation, 18 finite element analysis models of different span combinations were established, and 30 sets of valid data were obtained under the action of multi-factor. The results show that the shrinkage and creep of concrete is the most important factor for the mid-span deflection of continuous rigid frame bridges, and the deflection amount has an obvious functional relationship with the span. The effect of prestress loss on mid-span deflection is second, and stiffness reduction has little effect on mid-span long-term deflection. In this paper, the least-squares method is used to perform polynomial fitting, and the fitting formula for the mid-span finished bridge pre-camber is finally obtained. The applicability of the calculation formula is proved by comparing it with the specification solution, the empirical solution, and the measured value.Entities:
Mesh:
Year: 2022 PMID: 36163366 PMCID: PMC9513072 DOI: 10.1038/s41598-022-20449-4
Source DB: PubMed Journal: Sci Rep ISSN: 2045-2322 Impact factor: 4.996
Figure 1Pre-camber of continuous rigid frame bridges.
Figure 2Composition of prestress loss.
Figure 3Elevation of Xushuihe bridge (m).
Figure 4Finite element model of Xushuihe bridge.
List of calculation conditions.
| Number | Calculate Content | Symbol | Target value |
|---|---|---|---|
| 1 | Deflection value at the completion of bridge construction | y0 | – |
| 2 | Deflection value of the bridge after the stiffness is reduced by 10% | yE | VE = yE – y0 |
| 3 | Deflection value of the bridge after the effective stress of the prestress is reduced by 30% | yp | Vp = yp – y0 |
| 4 | Considering shrinkage and creep, deflection value after 3 years of operation | yc | Vc = yc – y0 |
| 5 | Deflection value under the coupling action of three factors | ym | Vm = ym – y0 |
Finite element calculation results (mm).
| Number | Bridge name | Span combination (m) | Main beam concrete | Tensile strength of prestressed steel (MPa) | VE | Vp | Vc | Vm | Live load deflection, |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Hanguguan Bridge | 45 + 80 + 45 | C55 | 1860 | − 0.10 | − 11.69 | − 2.93 | − 25.18 | − 14.97 |
| 2 | Yangjiabian Bridge | 56 + 90 + 56 | C50 | 1860 | 0.67 | − 7.65 | 0.99 | − 18.87 | − 27.83 |
| 3 | Qingcheng River Bridge | 57 + 100 + 57 | C50 | 1860 | 2.80 | − 12.50 | 1.70 | − 17.04 | − 8.20 |
| 4 | Qiyuan Yellow River Bridge | 62.5 + 4 × 110 + 62.5 | C50 | 1860 | 0.00 | − 12.01 | − 9.69 | − 33.07 | − 18.74 |
| 5 | 0.00 | − 9.53 | − 7.35 | − 25.27 | − 19.95 | ||||
| 6 | Juhe Bridge | 62.5 + 4 × 115 + 62.5 | C55 | 1860 | 0.00 | − 30.00 | − 12.68 | − 61.71 | − 27.97 |
| 7 | 0.00 | − 19.48 | − 18.68 | − 50.80 | − 26.49 | ||||
| 8 | Hongqi Village Yellow River Bridge | 75 + 2 × 120 + 75 | C55 | 1860 | 0.23 | − 24.91 | − 10.67 | − 46.80 | − 48.99 |
| 9 | 0.25 | − 24.88 | − 10.44 | − 46.46 | − 49.20 | ||||
| 10 | Bridge 1 | 65 + 6 × 120 + 65 | C50 | 1860 | 0.77 | − 13.52 | − 23.55 | − 53.52 | − 22.05 |
| 11 | 0.82 | − 12.95 | − 21.90 | − 48.95 | − 23.36 | ||||
| 12 | 0.23 | − 12.21 | − 24.87 | − 52.14 | − 24.25 | ||||
| 13 | Kuye River Bridge | 68 + 4 × 130 + 68 | C55 | 1860 | 2.17 | − 15.40 | − 10.33 | − 34.39 | − 49.25 |
| 14 | 0.80 | − 18.61 | − 10.19 | − 36.80 | − 42.38 | ||||
| 15 | Han River Bridge | 75 + 140 + 75 | C50 | 1860 | 0.00 | − 12.51 | 1.88 | − 32.11 | − 21.57 |
| 16 | Yijiahe Bridge | 75 + 140 + 75 | C50 | 1860 | 3.86 | − 24.64 | − 2.04 | − 54.40 | − 33.38 |
| 17 | Biandangou Bridge | 75 + 3 × 140 + 75 | C55 | 1860 | 0.00 | − 27.22 | − 9.49 | − 56.56 | − 38.55 |
| 18 | 0.24 | − 15.45 | − 14.45 | − 40.33 | − 30.11 | ||||
| 19 | Nujiang Bridge | 88 + 160 + 88 | C55 | 1860 | − 0.32 | − 11.53 | − 55.99 | − 82.85 | − 22.59 |
| 20 | Bridge 3 | 85 + 3 × 160 + 85 | C50 | 1860 | 1.49 | − 20.95 | − 19.21 | − 66.94 | − 29.22 |
| 21 | 1.36 | − 16.36 | − 14.02 | − 54.98 | − 30.09 | ||||
| 22 | Wulipo Bridge | 85 + 4 × 160 + 85 | C50 | 1860 | 0.00 | − 15.60 | − 16.24 | − 62.68 | − 42.04 |
| 23 | 0.00 | − 15.74 | − 16.68 | − 52.87 | − 44.13 | ||||
| 24 | Ziyang Han River Bridge | 95 + 2 × 170 + 95 | C50 | 1860 | − 2.32 | − 18.59 | − 36.34 | − 87.75 | − 57.36 |
| 25 | − 1.84 | − 18.66 | − 34.38 | − 85.62 | − 57.88 | ||||
| 26 | Bridge 2 | 95 + 4 × 180 + 95 | C50 | 1860 | 1.46 | − 28.57 | − 59.32 | − 103.96 | − 37.90 |
| 27 | 2.15 | − 27.63 | − 56.61 | − 99.76 | − 46.40 | ||||
| 28 | Duifang River Bridge | 100 + 180 + 100 | C55 | 1860 | − 0.62 | − 14.56 | − 58.68 | − 90.80 | − 26.06 |
| 29 | Xushuihe Bridge | 110 + 2 × 200 + 110 | C50 | 1670 | 0.00 | − 12.29 | − 58.36 | − 98.54 | − 35.01 |
| 30 | 0.00 | − 10.64 | − 61.34 | − 101.71 | − 37.76 |
Figure 5Influence of various factors on mid-span deflection.
Figure 6Fitting polynomial curve of the bridge deflection.
Figure 7Comparison of model calculation value, fitting formula value and empirical formula value.
Structural parameters of real bridge (mm).
| Examples | Span combination (m) | Main beam concrete | Tensile strength of prestressed steel (MPa) | ||||
|---|---|---|---|---|---|---|---|
| 1 | 56 + 90 + 56 | C50 | 1860 | 1.43 | 27.41 | 12.40 | − 27.83 |
| 2 | 75 + 2 × 120 + 75 | C55 | 1860 | 1.41 | 78.95 | 47.03 | − 48.99 |
| 3 | 88 + 160 + 88 | C55 | 1860 | 1.41 | 50.59 | 30.65 | − 22.59 |
| 4 | 100 + 180 + 100 | C55 | 1860 | 1.41 | 65.34 | 37.15 | − 26.06 |
Comparison of mid-span pre-camber (mm).
| Examples | Specification solution (7) | Empirical solution (1) | Fitting solution (6) | Measured deflection | Deviation 1 (%) | Deviation 2 (%) | Deviation 3 (%) |
|---|---|---|---|---|---|---|---|
| 1 | 14.40 | 103.92 | 39.86 | 43 | 0.33 | 2.42 | 0.93 |
| 2 | 17.26 | 144.50 | 65.20 | 50 | 0.35 | 2.89 | 1.30 |
| 3 | 10.03 | 171.30 | 80.08 | 69 | 0.15 | 2.48 | 1.16 |
| 4 | 17.83 | 193.03 | 99.46 | 114 | 0.16 | 1.69 | 0.87 |
Deviation 1 = specification solution/measured deflection × 100%; deviation 2 = empirical solution/measured deflection × 100%; deviation 3 = fitting solution / measured deflection × 100%.
Figure 8Comparison of mid-span pre-camber.