| Literature DB >> 36141651 |
Xiaodong Hu1, Ximing Zhang2, Lei Dong1, Hujun Li3, Zheng He4, Huihua Chen1.
Abstract
Carbon emissions have become a focus of political and academic concern in the global community since the launch of the Kyoto Protocol. As the largest carbon emitter, China has committed to reaching the carbon peak by 2030 and carbon neutrality by 2060 in the 75th United Nations High-level Meeting. The transport sector needs to be deeply decarbonized in China to achieve this goal. Previous studies have shown that the carbon emissions of the railway sector are small compared to highways, waterways, and civil aviation. However, these studies only consider the operation stage and do not consider the carbon emissions caused by large-scale railway infrastructure construction during the construction stage. As an essential source of carbon emissions and the focus of emissions reduction, the carbon emission of railway construction projects (RCPs) is in urgent need of relevant research. Based on a systematic literature review (SLR), this paper sorts out the carbon emission factors (CEFs) related to RCPs; combines semi-structured expert interviews to clarify the carbon emissions measurement boundary of RCPs; modifies and calibrates CEFs; constructs the carbon emission measurement model of RCPs including building material production stage, building material transportation stage, and construction stage; and conducts empirical analysis to validate carbon emission factors and measurement models. This study effectively complements the theoretical research on CEFs and measurement models in the construction stage of railway engineering and contributes to guiding the construction of low-carbon railways practically.Entities:
Keywords: carbon emission factors; carbon emission measurement model; railway construction projects; semi-structured expert interview; systematic literature review
Mesh:
Substances:
Year: 2022 PMID: 36141651 PMCID: PMC9516995 DOI: 10.3390/ijerph191811379
Source DB: PubMed Journal: Int J Environ Res Public Health ISSN: 1660-4601 Impact factor: 4.614
Energy CEFs based on SLR.
| Energy Types | Source |
|---|---|
| Raw coal | Chi et al. [ |
| Coal | Du et al. [ |
| Other coal washings | Chi et al. [ |
| Briquette | |
| Coke | Du et al. [ |
| Other coking products | Chi et al. [ |
| Crude oil | Du et al. [ |
| Gasoline | Du et al. [ |
| Kerosene | |
| Diesel oil | Du et al. [ |
| Solvent oil | Chi et al. [ |
| Petroleum | Chen et al. [ |
| Liquefied petroleum gas | Du et al. [ |
| Fuel oil | Chi et al. [ |
| Lubricating oil | Chi et al. [ |
| Natural gas | Du et al. [ |
| Electricity | Lin et al. [ |
| Biomass | Chen et al. [ |
| Solar PV | Chen et al. [ |
| Hydropower | Chen et al. [ |
| Wind | |
| nuclear |
Building materials CEFs based on SLR.
| Material Types | Source |
|---|---|
| Water | Chang et al. [ |
| Sand | |
| Polyvinyl chloride (PVC) pipe | Chang et al. [ |
| Polyethylene (PE) pipe | Chang et al. [ |
| Waterproof rubber belt | Kaewunruen et al. [ |
| Steel | Chang et al. [ |
| Geogrid | Chang et al. [ |
| Rubble and gravel | Chang et al. [ |
| Cement | Chang et al. [ |
| Concrete | Kaewunruen et al. [ |
| Accelerator | Kaewunruen et al. [ |
| Binder | |
| Clay | Chang et al. [ |
| Wood | Chang et al. [ |
| Timber-hardwood | Crawford [ |
| Lime | Chang et al. [ |
| Bricks | |
| Cable | Lee et al. [ |
Construction equipment CEFs based on SLR.
| Construction Equipment Types | Source |
|---|---|
| Concrete distributor | Kaewunruen et al. [ |
| Concrete mixing plant | |
| CNC grinding machine | |
| Gantry crane | |
| Two-way transporter | |
| CA mortar truck | |
| Track laying machine | |
| Spiral drilling machine | |
| Excavator | |
| Loading machine | |
| Concrete pump | |
| Sleeper-laying machine | Ortega et al. [ |
| Rail-laying machine | |
| Ballast-spreading machine | |
| Tamping machine | |
| Ballast-changing machine | |
| Ballast-cleaning machine | |
| Dump truck | Lin et al. [ |
| Loader | |
| Crane | |
| Drill | |
| Bulldozer | |
| Water tank | |
| Air compressor | |
| Lift truck | |
| Concrete pump | |
| Generator | |
| Tractor | |
| Trainer | |
| Excavator | |
| Rammer | |
| Concrete transportation vehicle | Liu et al. [ |
| Gantry crane | |
| Low-speed winch | |
| Steel binding machine | |
| Steel cutting machine | |
| Steel straightening machine |
Figure 1Relationship between energy, transportation, building materials, and construction equipment CEFs.
Critical fossil energy CEFs.
| Material Name | Default Net Calorific Value (kJ) [ | Default Carbon Content (kg C/GJ) [ | Default CO Factor | Unit | CEFs (kg CO2/Unit) |
|---|---|---|---|---|---|
| Raw coal | 20,908 | 25.8 | 100% | kg | 1.978 |
| Clean coal | 26,344 | 25.8 | 100% | kg | 2.492 |
| Coke | 28,435 | 29.2 | 100% | kg | 3.044 |
| Crude | 41,816 | 20.0 | 100% | kg | 3.067 |
| Kerosene | 43,070 | 19.5 | 100% | kg | 3.080 |
| Gasoline | 43,070 | 18.9 | 100% | kg | 2.985 |
| Diesel fuel | 42,652 | 20.2 | 100% | kg | 3.159 |
| Liquefied Petroleum Gas | 50,179 | 17.2 | 100% | kg | 3.165 |
| Natural gas | 38,931 | 15.3 | 100% | m3 | 1.996 |
| Coke oven gas | 16,726 | 12.1 | 100% | m3 | 0.770 |
Critical electricity CEFs in six major regions in China in 2019.
| Area | OM Electricity Carbon Emission Factor (kg CO2/kWh) [ | BM Electricity Carbon Emission Factor (kg CO2/kWh) [ |
|---|---|---|
| North China Power Grid | 0.9419 | 0.4819 |
| Northeast Power Grid | 1.0826 | 0.2399 |
| Northwest Power Grid | 0.8922 | 0.4407 |
| East China Power Grid | 0.7921 | 0.3870 |
| Central China Power Grid | 0.8587 | 0.2854 |
| China Southern Power Grid | 0.8042 | 0.2135 |
Critical building materials CEFs.
| Classification | Building Materials Name | Unit | CEFs (kg CO2/Unit) |
|---|---|---|---|
| Non-revolving material | Stone | m3 | 31.2 |
| Sand | m3 | 72.5 | |
| Bentonite | kg | 0.041 | |
| Mineral powder | kg | 0.05692 | |
| Fly ash | kg | 0.0015 | |
| Ordinary Cement Grade 32.5 | t | 802.259 | |
| Ordinary Cement Grade 42.5 | t | 1103.707 | |
| Ordinary Cement Grade 52.5 | t | 1254.874 | |
| C20 Concrete | m3 | 306.192 | |
| C25 Concrete | m3 | 336.680 | |
| C30 Concrete | m3 | 371.654 | |
| C35 Concrete | m3 | 389.568 | |
| C40 Concrete | m3 | 419.599 | |
| C50 Concrete | m3 | 502.819 | |
| C60 Concrete | m3 | 549.342 | |
| 1:1 Cement mortar | m3 | 829.388 | |
| 1:2 Cement mortar | m3 | 636.038 | |
| 1:2.5 Cement mortar | m3 | 581.347 | |
| 1:3 Cement mortar | m3 | 532.518 | |
| Large steel | t | 3612.011 | |
| Middle and small steel | t | 2895.229 | |
| Hot rolled steel bar | t | 3041.139 | |
| Cold rolled steel bar | t | 3786.384 | |
| Iron product | t | 2084.565 | |
| Wood | m3 | 120.924 | |
| Waterproof coating | kg | 0.89 | |
| Modified Asphalt | m2 | 3.53 | |
| PVC waterproof board | m2 | 19.553 | |
| Rubber Waterstop | m | 4.608 | |
| Reusable materials | Turnover Steel | t | 1331.805 |
| Turnover wood | m3 | 12.092 |
Critical construction equipment CEFs.
| Equipment Category | Construction Equipment | Energy Consumption per Shift | CEFs (kg CO2/per Shift) | ||
|---|---|---|---|---|---|
| Gasoline (kg) | Diesel Fuel (kg) | Electricity (kWh) | |||
| Earth-moving machinery | Crawler hydraulic single bucket excavator ≤ 0.4 m3 | - | 35.48 | - | 112.08 |
| Crawler hydraulic single bucket excavator ≤ 0.6 m3 | - | 44.08 | - | 139.25 | |
| Crawler hydraulic single bucket excavator ≤ 1 m3 | - | 62.90 | - | 198.70 | |
| Crawler Bulldozer ≤ 75 kW | - | 49.73 | - | 157.10 | |
| Crawler Bulldozer ≤ 300 kW | - | 197.57 | - | 624.12 | |
| Self-propelled vibratory roller ≤ 12 t | - | 75.00 | - | 236.93 | |
| Frog rammer ≤ 700 Nm | - | - | 20.40 | 16.41 | |
| Tire loader ≤ 2 m3 | - | 56.45 | - | 178.33 | |
| Hoisting Machinery | Crane ≤ 8 t | - | 35.28 | - | 111.45 |
| Crane ≤ 16 t | - | 57.15 | - | 180.54 | |
| Gantry crane ≤ 10 t-22 m | - | - | 61.44 | 49.41 | |
| Gantry crane ≤ 20 t-22 m | - | - | 109.44 | 88.01 | |
| Gantry crane ≤ 50 t-40 m | - | - | 176.64 | 142.05 | |
| Crawler crane ≤ 10 t | - | 31.75 | - | 100.30 | |
| Crawler crane ≤ 15 t | - | 38.81 | - | 122.60 | |
| Crawler crane ≤ 40 t | - | 47.63 | - | 150.46 | |
| Crawler crane ≤ 250 t | - | 352.80 | - | 1114.50 | |
| Single drum slow speed winch ≤ 30 kN | - | - | 38.40 | 30.88 | |
| Single drum slow speed winch ≤ 50 kN | - | - | 56.32 | 45.29 | |
| Transport machinery | Dump Truck ≤ 4 t | - | 34.27 | - | 108.26 |
| Dump Truck ≤ 8 t | - | 47.58 | - | 150.31 | |
| Dump Truck ≤ 12 t | - | 61.29 | - | 193.62 | |
| Truck ≤ 4 t | 26.61 | - | - | 79.43 | |
| Truck ≤ 6 t | 34.56 | - | - | 103.16 | |
| Sprinkler ≤ 5000 L | 34.56 | - | - | 103.16 | |
| Small transporter ≤ 1 t | - | 7.26 | - | 22.93 | |
| Belt conveyor ≤ 10 m | - | - | 15.36 | 12.35 | |
| Concrete mixer truck ≤ 6 m3 | - | 88.70 | - | 280.20 | |
| Concrete mixer truck ≤ 8 m3 | - | 100.80 | - | 318.43 | |
| Concrete mixer truck ≤ 10 m3 | - | 106.85 | - | 337.54 | |
| Concrete and Mortar Machinery | Concrete mixer ≤ 250 L | - | - | 15.68 | 12.61 |
| Concrete mixer ≤ 400 L | - | - | 21.56 | 17.34 | |
| Concrete mixer ≤ 800 L | - | - | 86.24 | 69.35 | |
| Concrete batching plant ≤ 60 m3/h | - | - | 636.16 | 511.60 | |
| Concrete batching plant ≤ 100 m3/h | - | - | 913.92 | 734.97 | |
| Concrete batching plant ≤ 120 m3/h | - | - | 1008.00 | 810.63 | |
| Concrete insertion vibrator | - | - | 5.38 | 4.33 | |
| Concrete attached vibrator | - | - | 6.72 | 5.40 | |
| Suspended pulp leveling machine | - | - | 105.28 | 84.67 | |
| Concrete wet spraying machine ≤ 5 m3/h | - | - | 24.64 | 19.82 | |
| Hydraulic grouting pump ≤ 50 L/min | - | - | 30.80 | 24.77 | |
| Concrete pump ≤ 60 m3/h | - | - | 492.80 | 396.31 | |
| Concrete delivery pump truck ≤ 90 m3/h | - | 61.74 | - | 195.04 | |
| Concrete placing machine ≤ 21 m | - | - | 21.84 | 17.56 | |
| Mortar mixer ≤ 200 L | - | - | 13.44 | 10.81 | |
| Mortar mixer ≤ 400 L | - | - | 20.16 | 16.21 | |
| Prestressed rebar hydraulic tensioning equipment ≤ 1200 kN | - | - | 38.40 | 30.88 | |
| Foundation and Pump Machinery | Hydraulic vibratory pile driver ≤ 320 t | - | 650.92 | - | 2056.26 |
| Hydraulic static pile driver ≤ 1200 kN | - | - | 138.60 | 111.46 | |
| Hydraulic static pile driver ≤ 1600 kN | - | - | 189.00 | 151.99 | |
| Impact hole forming machine d ≤ 1.5 m | - | - | 177.60 | 142.83 | |
| Crawler hydraulic grab grooving machine ≤ 1.2 m | - | 194.04 | - | 612.97 | |
| Dynamic compaction machinery ≤ 1200 kNm | - | 56.70 | - | 179.12 | |
| Dynamic compaction machinery ≤ 2000 kNm | - | 69.30 | - | 218.92 | |
| Single stage centrifugal water pump ≤ 12.5 m3/h-20 m | - | - | 8.98 | 7.22 | |
| Single stage centrifugal water pump ≤ 50 m3/h-38 m | - | - | 44.88 | 36.09 | |
| Multistage centrifugal clean water pump ≤ 85 m3/h-180 m | - | - | 224.40 | 180.46 | |
| Multistage centrifugal clean water pump ≤ 155 m3/h-185 m | - | - | 538.56 | 433.11 | |
| Sewage pump ≤ 90 m3/h-26 m | - | - | 89.76 | 72.18 | |
| Centrifugal mud pump ≤ 108 m3/h-21 m | - | - | 89.76 | 72.18 | |
| Slurry treatment centrifuge ≤ 100 m3/h | - | - | 326.40 | 262.49 | |
| Slurry separation equipment ≤ 1500 m3/h | - | - | 1836.00 | 1476.51 | |
| Slurry production cycle equipment ≤ 500 m3/h | - | - | 136.00 | 109.37 | |
| welding machinery | AC arc welding machine ≤ 42 kVA | - | - | 144.00 | 115.80 |
| DC arc welding machine ≤ 32 kW | - | 102.40 | 82.35 | ||
| Butt welding machine ≤ 100 kVA | - | - | 288.00 | 231.61 | |
| Paving machinery | Track laying machine 25 m | - | 193.64 | - | 611.71 |
| Ballastless track long rail laying unit 500 m | - | 94.25 | - | 297.74 | |
| Turnout tamping car | - | 298.17 | - | 941.92 | |
| Long rail line laying and rolling mill | - | 182.50 | - | 576.52 | |
| Erecting machine ≤ 900 t | - | 642.03 | - | 2028.17 | |
| Box girder truck ≤ 900 t | - | 913.92 | - | 2887.07 | |
| Wheel-rail beam moving machine ≤ 900 t | - | 188.50 | - | 595.47 | |
| Wheel-rail beam lifter ≤ 2 × 450 t | - | 188.50 | - | 595.47 | |
| Track slab steel bar tensioning equipment | - | - | 105.60 | 84.92 | |
| Type I double block sleeper concrete pouring production line | - | - | 384.00 | 308.81 | |
| Processing and other machinery | Steel bar straightening machine d ≤ 14 | - | - | 18.70 | 15.04 |
| Rebar cutting machine d ≤ 40 | - | - | 33.32 | 26.80 | |
| Steel bending machine d ≤ 40 | - | - | 14.28 | 11.48 | |
| Woodworking circular saw d ≤ 500 | - | - | 16.32 | 13.12 | |
| Jaw Crusher ≤ 250 × 400 | - | - | 81.60 | 65.62 | |
| Vertical drilling machine d ≤ 25 | - | - | 8.98 | 7.22 | |
| Pipe cutting machine d ≤ 150 | - | - | 13.60 | 10.94 | |
Main building materials data.
| Serial Number | Material Name | Unit | Consumption |
|---|---|---|---|
| 1 | Ordinary cement grade 32.5 | kg | 123,992,044 |
| 2 | Ordinary cement grade 42.5 | kg | 213,179,751 |
| 3 | white cement | kg | 13,420.27 |
| 4 | double-fast cement | kg | 1497.61 |
| 5 | Ordinary Cement grade 42.5 (High Performance Concrete) | kg | 248,951,256 |
| 6 | log | m3 | 2151.04 |
| 7 | sawn timber | m3 | 11,093.86 |
| 8 | Water-emulsion polymer cement-based composite waterproof coating | kg | 148.26 |
| 9 | Water-based primer (common) | kg | 176.04 |
| 10 | Acrylic primer | kg | 1287.21 |
| 11 | Acrylic Elastic Premium Coating | kg | 12,521.26 |
| 12 | bentonite | kg | 2,702,413.99 |
| 13 | Slag Powder (High Performance Concrete) | kg | 74,204,928.9 |
| 14 | boulder | m3 | 10,368.25 |
| 15 | flakes | m3 | 224,682.25 |
Building materials transportation data.
| Serial Number | Material Name | Transport Distance (km) | Transport Mode |
|---|---|---|---|
| 1 | sand | 80 | Road Diesel Transport |
| 2 | stone | 60.48 | Road Diesel Transport |
| 3 | cement | 203.38 | Road Diesel Transport |
| 4 | steel | 206.5 | Road Diesel Transport |
| 5 | other metal materials | 200 | Road Diesel Transport |
| 6 | wood | 65.74 | Road Diesel Transport |
| 7 | other building materials | 234.85 | Road Diesel Transport |
| 8 | waste | 1 | Road Diesel Transport |
Mechanical shift data.
| Serial Number | Construction Equipment | Unit | Quantity |
|---|---|---|---|
| 1 | Crawler hydraulic single bucket excavator ≤ 0.6 m3 | per shift | 2090 |
| 2 | Crawler hydraulic single bucket excavator ≤ 0.8 m3 | per shift | 17.56 |
| 3 | Crawler hydraulic single bucket excavator ≤ 1.0 m3 | per shift | 539.11 |
| 4 | Crawler hydraulic single bucket excavator ≤ 2.0 m3 | per shift | 3597.28 |
| 5 | Crawler hydraulic single bucket excavator ≤ 2.5 m3 | per shift | 3.14 |
| 6 | Crawler Bulldozer ≤ 75 kW | per shift | 2737.35 |
| 7 | Crawler Bulldozer ≤ 90 kW | per shift | 430.11 |
| 8 | Crawler Bulldozer ≤ 105 kW | per shift | 2615.76 |
| 9 | Static Roller ≤ 8 t | per shift | 104.03 |
| 10 | Static Roller ≤ 12 t | per shift | 928.16 |
| 11 | Static Roller ≤ 15 t | per shift | 107.38 |
| 12 | Self-propelled vibratory roller ≤ 0.7 t | per shift | 364.58 |
| 13 | Self-propelled vibratory roller ≤ 15 t | per shift | 5440.65 |
| 14 | Self-propelled vibratory roller ≤ 20 t | per shift | 427.96 |
| 15 | Grader ≤ 120 kW | per shift | 790.86 |
| 16 | frog rammer ≤ 250 Nm | per shift | 113.56 |
| 17 | frog rammer ≤ 700 Nm | per shift | 3588.54 |
| 18 | Stabilized soil mixer ≤ 120 kW | per shift | 0.23 |
| 19 | tire loader ≤ 2 m3 | per shift | 29,912.48 |
| 20 | crawler loader ≤ 2 m3 | per shift | 4955.27 |
Energy data.
| Serial Number | Energy Name | Unit | Quantity |
|---|---|---|---|
| 1 | coal tar | kg | 11,988.08 |
| 2 | coke | kg | 386.04 |
| 3 | coal | t | 5.13 |
| 4 | gasoline | kg | 2013.35 |
| 5 | kerosene | kg | 239.7 |
| 6 | water | t | 2,064,227 |
| 7 | electricity | kWh | 6,508,482 |