A K Mishra1, J S Sudarsan2, S Nithiyanantham3.
Abstract
Ready mix concrete (RMC) is a new concreting concept in the Nepali construction industry introduced before one decade. The paper aims to assess the acceptance of ready mix for residential buildings of Nepal. The relation was developed for average compressive strength with slump value and water cement ratio based on laboratory test nominal mix M20 (1:1.5:3) and M25 (1:1:2) along with questionnaire survey. The result also shows that the compressive strength of RMC is higher in comparison with the SMC (site mix concrete). During questionnaire, more than 60% of users prefer the RMC over SMC. The merit and demerit of construction projects using RMC and SMC are discussed and interpreted.Entities:
Keywords: Acceptance; Cost variations; Green marketing; Ordinary concrete; Ready mix; Strength
Year: 2022 PMID: 35891802 PMCID: PMC9302957 DOI: 10.1007/s13762-022-04380-9
Source DB: PubMed Journal: Int J Environ Sci Technol (Tehran) ISSN: 1735-1472 Impact factor: 3.519
Fig.1Location map of construction site in Kathmandu Valley
Fig.2Location map of construction site in Kathmandu valley
Cost for concrete for SMC: M25 and M20
| S. No. | Category | Unit | Rate | SMC/RMC |
|---|---|---|---|---|
| a | Supply of material and cement concrete work for superstructure, deck slab, beam including 30 m transportation in valley for M20 | Cu.m | 18, 380.4 | SMC |
| b | Supply of material and cement concrete work for superstructure, deck slab, beam including 30 m transportation in valley for M25 | Cu.m | 22, 424.98 | SMC |
| c | Ready mix concrete including 3 km outside ring road for M20 | Cu.m | 14, 500 | RMC |
| d | Ready mix concrete including 3 km outside ring road for M25 | Cu.m | 15, 500 | RMC |
Slump test and compressive strength test for site 1
| 1 Site: Construction of auditor general building supreme audit institution of Nepal | ||||||
|---|---|---|---|---|---|---|
| Code | 1B1-20 | 1B2-20 | 1B3-20 | 1B1-25 | 1B2-25 | 1B3-25 |
| Section | Raft | Raft | GFSlab | GF Column | GFColumn | FFColumn |
| Casting Date | 11/5/2074 | 11/6/2074 | 1/5/2075 | 11/28/2074 | 11/29/2074 | 1/24/2075 |
| Testing Date | 12/3/2074 | 12/4/2074 | 2/2/2075 | 12/26/2074 | 12/27/2074 | 2/21/2075 |
| Nominal ratio | 1:1.5:3 | 1:1.5:3 | 1:1.5:3 | 1:1:2 | 1:1:2 | 1:1:2 |
| W/C | 0.45 | 0.48 | 0.46 | 0.42 | 0.43 | 0.44 |
| Slump(mm) | 80 | 155 | 145 | 135 | 140 | 146 |
| S1 | 2.19 | 2.19 | 2.06 | 3.07 | 2.85 | 2.41 |
| S2 | 2.28 | 2.15 | 2.54 | 3.11 | 3.07 | 2.59 |
| S3 | 2.41 | 2.32 | 2.19 | 3.02 | 2.85 | 2.54 |
| Avgstrength(KN/cm2) | 2.29 | 2.22 | 2.26 | 3.07 | 2.92 | 2.51 |
Slump test and compressive strength test for site 2
| 2 Site: Construction of Nepal Army Head quarter Building Bhadrakali, Kathmandu | ||||||
|---|---|---|---|---|---|---|
| Code | 2B1-20 | 2B2-20 | 2B3-20 | 2B1-25 | 2B2-25 | 2B3-25 |
| Section | 3F-Slab | 3F-Slab | 4F-Slab | 3F-Column | 4F-Column | 4F-Column |
| Casting Date | 12/8/2074 | 12/9/2074 | 2/6/2075 | 11/15/2074 | 1/27/2075 | 1/28/2074 |
| Testing Date | 1/6/2075 | 1/7/2075 | 3/3/2075 | 12/13/2074 | 2/24/2075 | 2/25/2074 |
| Nominal ratio | 1:1.5:3 | 1:1.5:3 | 1:1.5:3 | 1:1:2 | 1:1:2 | 1:1:2 |
| W/C | 0.45 | 0.46 | 0.48 | 0.43 | 0.44 | 0.45 |
| Slump(mm) | 145 | 155 | 160 | 148 | 150 | 152 |
| S1 | 2.19 | 2.10 | 1.75 | 2.59 | 2.76 | 2.85 |
| S2 | 1.84 | 2.02 | 2.08 | 2.72 | 2.85 | 3.07 |
| S3 | 2.15 | 2.02 | 1.97 | 2.80 | 3.02 | 2.85 |
| Avg. strength(KN/cm2) | 2.06 | 2.05 | 1.94 | 2.70 | 2.88 | 2.92 |
Slump Test and Compressive Strength Test for site 3
| 3 Site: Commercial building for Sushil Gupta at Gusinggal, Lalitpur | ||||||
|---|---|---|---|---|---|---|
| Code | 3B1-20 | 3B2-20 | 3B3-20 | 3B1-25 | 3B2-25 | 3B3-25 |
| Section | Raft | GF-Slab | GF-Slab | Pile | GF-Column | GF- Column |
| Casting Date | 12/12/2074 | 1/25/2075 | 1/26/2075 | 12/4/2074 | 12/13/2074 | 12/28/2074 |
| Testing Date | 1/10/2075 | 2/22/2075 | 2/23/2075 | 1/2/2075 | 1/11/2075 | 1/26/2075 |
| Nominal ratio | 1:1.5:3 | 1:1.5:3 | 1:1.5:3 | 1:1:2 | 1:1:2 | 1:1:2 |
| W/C | 0.48 | 0.5 | 0.49 | 0.42 | 0.44 | 0.43 |
| Slump(mm) | 85 | 125 | 123 | 126 | 130 | 135 |
| S1 | 1.97 | 1.88 | 2.19 | 2.23 | 2.72 | 2.54 |
| S2 | 2.23 | 1.53 | 2.41 | 3.29 | 3.07 | 2.54 |
| S3 | 1.88 | 2.45 | 2.19 | 3.20 | 2.89 | 2.63 |
| Avg. strength (KN/cm2) | 2.03 | 1.96 | 2.26 | 2.91 | 2.89 | 2.57 |
Slump Test and Compressive Strength Test for site 4
| 4 Site: Residential Building for Bishnu Agrawal at Sanepa, Lalitpur | ||||||
|---|---|---|---|---|---|---|
| Code | 4B1-20 | 4B2-20 | 4B3-20 | 4B1-25 | 4B2-25 | 4B3-25 |
| Section | Tie Beam | Tie Beam | GF-Slab | Footing | Footing | GF- Column |
| Casting Date | 1/22/2075 | 1/29/2075 | 3/2/2075 | 1/6/2075 | 1/7/2075 | 2/15/2075 |
| Testing Date | 2/19/2075 | 2/26/2075 | 3/30/2075 | 2/3/2075 | 2/4/2075 | 3/12/2075 |
| Nominal ratio | 1:1.5:3 | 1:1.5:3 | 1:1.5:3 | 1:1:2 | 1:1:2 | 1:1:2 |
| W/C | 0.47 | 0.46 | 0.45 | 0.4 | 0.44 | 0.42 |
| Slump(mm) | 135 | 133 | 128 | 130 | 133 | 128 |
| S1 | 2.41 | 2.32 | 2.63 | 2.85 | 2.85 | 3.51 |
| S2 | 2.41 | 2.41 | 2.72 | 2.76 | 3.07 | 3.42 |
| S3 | 2.19 | 2.50 | 2.85 | 2.89 | 3.11 | 3.29 |
| Avg. strength (KN/cm2) | 2.34 | 2.41 | 2.73 | 2.83 | 3.01 | 3.40 |
Fig. 3Auditor General Building Average Strength vs. Slump for (a) 20 MPa and (b) 25 MPa
Fig. 4Auditor General Building Average Strength vs. Slump for 25 MPa
Fig. 5Auditor General Building Average Strength vs. W/C for (a) 20 MPa and (b) 25 MPa
Fig. 6Auditor General Building Average Strength vs W/C for 25 MPa
Fig. 7Concrete Rates for 25 MPa