| Literature DB >> 35647362 |
Asma Zare1, Naser Hoboubi2, Salman Farahbakhsh1, Mehdi Jahangiri3.
Abstract
Background: Given that human error is the most important cause of industrial accidents, it seems necessary to identify and analyze human error, assess human reliability, and reduce errors or prevent unfortunate consequences. This study aimed to evaluate human reliability in a petrochemical industry.Entities:
Keywords: AHP-FLIM; Human error; Human reliability assessment; Petrochemical industry
Year: 2022 PMID: 35647362 PMCID: PMC9136350 DOI: 10.1016/j.heliyon.2022.e09509
Source DB: PubMed Journal: Heliyon ISSN: 2405-8440
Summary of literature review in human reliability in the industries.
| Study | Year | Method | Industry type | Outcome |
|---|---|---|---|---|
| Blackman et al. [ | 2008 | Standardized Plant Analysis Risk Human Reliability Analysis (SPAR-H) | Nuclear Power plant | Quantification Analysis of human reliability and estimation of human error related to operators |
| Zhou and Kou [ | 2010 | AHP-FLIM | Construction | The proposed AHP-FLIM method makes a meticulous analysis of occurrence of HEs in construction. |
| Sun et al. [ | 2011 | Human Cognitive Reliability (HCR) | Airport control tower | The possibility of human error in the scenario for the collision of two aircraft in terms of training level and stress was investigated. |
| Musharraf et al. [ | 2013 | SLIM | Oil rigs | In the emergency response process, the minimum human reliability was when gathering in a safe place. |
| Zhou et al. [ | 2018 | fuzzy logic theory, Bayesian network (BN), and cognitive reliability and error analysis method (CREAM) | Tanker shipping industry | The evaluation of HEP according to the proposed HRA model is very promising and the HRA model is consistent with the original CREAM approach. |
| Petruni et al. [ | 2019 | AHP | Automotive industry | The Analytic Hierarchy Process (AHP) provides a way of assisting safety managers and risk assessors in the HRA technique selection process. |
| Tavakoli and Nafar [ | 2020 | Human Factors Analysis and Classification System (HFACS) | Maintenance team of power transmission system protection | Human error factors are ranked to help improve human reliability. |
| Ahn and Kurt [ | 2020 | CREAM and fuzzy theory | Firefighting procedure | The proposed method can evaluate the context in a maritime scenario based on the CREAM basic method and illustrate practical application to onboard procedures in the context in vessels by using the CREAM extended method. |
Figure 1Form of decision elements in AHP.
Value scale for alternative decision comparison.
| Scale of relative importance | Definition | Explanation |
|---|---|---|
| 1 | Equally important | Two decisions equally influence the upper-level objective. |
| 3 | Moderately important | One decision is moderately more favorable for the upper-level objective fulfillment. |
| 5 | Strongly more important | One decision is strongly more favorable for the upper-level objective fulfillment. |
| 7 | Very strongly more important | One decision is significantly more favorable for the upper level objective fulfillment. |
| 9 | Extremely more important | The difference between the influences of the two decisions is extremely significant. |
| 2, 4, 6, 8 | Intermediate judgments value | When a compromise is necessary to give an intermediary judgment among the previous values. |
Figure 2The study process.
Figure 3The evaluation framework for prioritization of human error.
Prioritization of jobs in the petrochemical industry studied by the rate of accident risk due to human error.
| Factors | Jobs | ||||||
|---|---|---|---|---|---|---|---|
| Storekeepers | HSE men | Service workers | Mechanical repairmen | Office workers | Firefighters | Site men | |
| Severity of the accident | 0.107 | 0.087 | 0.054 | 0.302 | 0.046 | 0.128 | 0.273 |
| Probability of the accident | 0.083 | 0.07 | 0.067 | 0.283 | 0.051 | 0.163 | 0.28 |
| Risk rate (severity × probability) | 0.008 | 0.006 | 0.003 | 0.085 | 0.002 | 0.020 | 0.076 |
Human errors identified in the critical job groups in the petrochemical industry.
| Error code | Task | Error description | Consequences |
|---|---|---|---|
| Firefighters | |||
| Ef.1 | Wearing personal protective equipment (PPEs) | Forgetting to wear PPEs | Probability of injury and even death during operations |
| Ef.2 | Fire extinguishing | Fire extinguishing operations are carried out with inadequate or wrong equipment | Delay in firefighting resulting in escalation of life and financial |
| Ef.3 | Gas testing using the device | The operator does gas testing in the wrong place | The gas testing has not been operated properly, resulting in the |
| Ef.4 | Fix leakage | No fix leakage operations done | Probability of fire and explosion due to sparks or poisoning with toxic gases |
| Ef.5 | Permit to work review to know the safety principles during operation | Incorrect interpretation of the information contained in the permit to work | Possibility of personal injury due to lack of knowledge about safety |
| Ef.6 | Dispatch to the accident place | The firefighters arrive late | Fire extinguishing delay and escalation of damage |
| Ef.7 | Disconnection of input energy from equipment | Disconnection of input energy from equipment is not performed prior to Extinguishing operations. | The occurrence of accident resulting in a delay in extinguishing and intensifying |
| Site men | |||
| Es.1 | Wearing personal protective equipment (PPEs) | Forgetting to wear PPEs | Probability of injury and even death during operations |
| Es.2 | Checking for non-greasy protective clothing before working on the oxygen line | Checking for non-greasy protective clothing before working on the oxygen line is not done. | Because of the clothes being greasy and exposed to oxygen, |
| Es.3 | Use of cast iron equipment when | The use of cast iron equipment is forgotten. | There is a possibility of explosion due to spark during work. |
| Es.4 | Permit to work review to know safety principles when entering reactors and converters | Incorrect interpretation of the information contained in the permit to work | Possibility of personal injury due to lack of knowledge about safety |
| Es.5 | Gas testing using the device | The operator does gas testing in the wrong place | The gas testing has not been operated properly, resulting in the |
| Es.6 | Torching | Torch operation is performed in an incorrect sequence | The unit may be destroyed and there may be heavy financial |
| Es.7 | Hot spot test | Hot spot test is not done. | The temperature is increased in high-pressure converters, which |
| Mechanical repairmen | |||
| Em.1 | Wearing personal protective equipment (PPEs) | Forgetting to wear PPEs | Probability of injury and even death during operations |
| Em.2 | Checking that the bolts are not greasy before placing them on the oxygen line | Bolts are not checked before being placed on the oxygen line. | The explosion is likely to occur due to the greasiness of the bolts |
| Em.3 | Checking for non-greasy protective clothing before working on the oxygen line. | Checking for non-greasy protective clothing before working on the oxygen line is | Because of the clothes being greasy and exposed to oxygen, there is a possibility of explosion |
| Em.4 | Fixing leaks from the serving line | Fixing leaks from the line is not done | Probability of fire and explosion due to sparks or poisoning with toxic gases |
| Em.5 | Using non-bronze tools during leakage removal | The use of non-bronze tools is forgotten. | Probability of fire and explosion due to sparks. |
| Em.6 | Installing the control valve | The control valve is installed in the wrong direction. | Improper installation of the control valve increases the |
| Em.7 | Closing the flange washer. | Closing the flange washer is forgotten. | Failure to close the washer can lead to material leakage and can |
Hot spot test is performed to check the resistance status of high pressure converters. In these converters, excessive temperature rise can lead to the loss of the converters resistance and eventually melting.
Prioritization of PSFs by the AHP method in critical and sensitive job groups in the petrochemical industry.
| PSFs | Job group | |||||
|---|---|---|---|---|---|---|
| Mechanical repairmen | Site men | Firefighters | ||||
| Non-normalized weight | Normalized weight | Non-normalized weight | Normalized weight | Non-normalized weight | Normalized weight | |
| Stress | 0.028 | 0.057 | 0.034 | 0.069 | 0.039 | 0.079 |
| Task complexity | 0.041 | 0.083 | 0.032 | 0.065 | 0.025 | 0.051 |
| Experience | 0.118 | 0.236 | 0.152 | 0.304 | 0.153 | 0.306 |
| Training | 0.206 | 0.412 | 0.204 | 0.408 | 0.210 | 0.420 |
| Instruction | 0.068 | 0.136 | 0.039 | 0.079 | 0.037 | 0.074 |
| Environmental conditions | 0.036 | 0.072 | 0.036 | 0.072 | 0.033 | 0.067 |
Prioritization of human errors by the AHP method in critical and sensitive job groups in the petrochemical industry.
| Mechanical repairmen | Site men | Firefighters | ||||||
|---|---|---|---|---|---|---|---|---|
| Error code | Non-normalized weight | Normalized weight | Error code | Non-normalized weight | Normalized weight | Error code | Non-normalized weight | Normalized weight |
| Em.1 | 0.041 | 0.082 | Es.1 | 0.030 | 0.061 | Ef.1 | 0.031 | 0.062 |
| Em.2 | 0.045 | 0.090 | Es.2 | 0.056 | 0.112 | Ef.2 | 0.042 | 0.084 |
| Em.3 | 0.059 | 0.118 | Es.3 | 0.033 | 0.066 | Ef.3 | 0.142 | 0.284 |
| Em.4 | 0.180 | 0.361 | Es.4 | 0.148 | 0.296 | Ef.4 | 0.117 | 0.234 |
| Em.5 | 0.030 | 0.060 | Es.5 | 0.150 | 0.300 | Ef.5 | 0.110 | 0.221 |
| Em.6 | 0.087 | 0.175 | Es.6 | 0.035 | 0.070 | Ef.6 | 0.110 | 0.221 |
| Em.7 | 0.055 | 0.110 | Es.7 | 0.045 | 0.091 | Ef.7 | 0.027 | 0.058 |
The FLI for human errors, HEP, and human reliability assessment (R) in critical and sensitive job groups in the petrochemical industry.
| Mechanical repairmen | Site men | Firefighters | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Error code | FLI | HEP | R | Error code | FLI | HEP | R | Error code | FLI | HEP | R |
| Em.1 | 0.078 | 0.010 | 0.989 | Es.1 | 0.057 | 0.009 | 0.009 | Ef.1 | 0.059 | 0.010 | 0.989 |
| Em.2 | 0.088 | 0.011 | 0.988 | Es.2 | 0.109 | 0.013 | 0.986 | Ef.2 | 0.081 | 0.011 | 0.988 |
| Em.3 | 0.114 | 0.012 | 0.987 | Es.3 | 0.063 | 0.010 | 0.989 | Ef.3 | 0.281 | 0.039 | 0.960 |
| Em.4 | 0.356 | 0.029 | 0.970 | Es.4 | 0.292 | 0.038 | 0.961 | Ef.4 | 0.23 | 0.028 | 0.971 |
| Em.5 | 0.057 | 0.009 | 0.990 | Es.5 | 0.296 | 0.039 | 0.960 | Ef.5 | 0.217 | 0.026 | 0.973 |
| Em.6 | 0.168 | 0.014 | 0.985 | Es.6 | 0.067 | 0.010 | 0.989 | Ef.6 | 0.054 | 0.0098 | 0.9901 |
| Em.7 | 0.106 | 0.011 | 0.988 | Es.7 | 0.088 | 0.011 | 0.988 | Ef.7 | 0.050 | 0.0095 | 0.9904 |
| Mean of human error probability | 0.013 | Mean of human error probability | 0.018 | Mean of human error probability | 0.019 | ||||||
| Mean of human reliability | 0.987 | Mean of human reliability | 0.982 | Mean of human reliability | 0.981 | ||||||